Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078

of 100

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (32.8 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 43, section 1. The text section number identifies this passage in the reader.

20/11/2023 +                                                                                                                                                                                                                                                                                           JOB No:-




                                                                                       INITIAL PEAK FLOW ESTIMATE
                                                                                                                   Written by BB 31/10/08
                                                                                                               Updated by DJK 25/05/20



    Job Number:                               22159
    Job Name:                           LOT 3 - Noosa Civic Village Expansion


    Designed:                           VN
    Checked:                            SG                                                         IFD Location: Noosaville




               TOTAL RUNOFF COEFF.                                                                                                                                                         EXISTING TIME OF CONCENTRATION                               DEVELOPED TIME OF CONCENTRATION


                         Sub Catchment Area (Ha)                Fraction Impervious                      Runoff Coeficients                          Calculated C10                                 Std Inlet Time                                0                   Std Inlet Time              5

    No.              Existing           Proposed            Existing        Proposed          Existing             Proposed               Existing           Proposed




                                                                                                                                                                                       SHEET FLOW




                                                                                                                                                                                                                                                         SHEET FLOW
           1                    2.979               2.979              0%              93%                  0.60                   0.89                                                             Site Slope (%)                                2                   Site Slope (%)              0

           2                    0.000               0.000              0%              0%                   0.00                   0.00                                                             Flow Length (m)                             200                   Flow Length (m)             0
           3                    0.000               0.000              0%              0%                   0.00                   0.00                                                             Horton's "n"                                0.16                  Horton's "n"                0

           4                    0.000               0.000              0%              0%                   0.00                   0.00                                                             Travel Time (min)                          87.16                  Travel Time (min)         0.00

           5                    0.000               0.000              0%              0%                   0.00                   0.00
                         2.979              2.979                                                                                               0.60              0.89                              Travel Length (m)                             0                   Travel Length (m)         200




                                                                                                                                                                                     CHANNEL/PI




                                                                                                                                                                                                                                                       CHANNEL/PI
                                                                                                                                                                                      PE FLOW




                                                                                                                                                                                                                                                        PE FLOW
    Raw IFD data has been obtained from the Bureau of Meteorology (BOM) website.                                                                                                                    Fall (m)                                      0                   Fall (m)                   5.6
                                                                                                                                                                                                    Travel Time (min)                             0                   Travel Time (min)           2
                                                                                                                                                                                                    Multiplier                                    0                   Multiplier                  1
                                                                                                                   s                                                                                Travel Time (min)                             0                   Travel Time (min)           2


                                                                                                                                                                                                    Total Time (Tc)                   87.2                            Total Time (Tc)     7.0

                                                            PEAK RUNOFF CALCULATIONS                                                                                     PEAK FLOWS FOR FREQUENT EVENTS


                                           Rainfall Intensity (mm/hr)              Coeficient of Runoff                    Peak Runoff Rates (m^3/s)                     ARI Event   % of Q1                       Peak discharge (m^/s)
     AEP Event %      ARI Event yr      Existing            Proposed        Existing          Proposed             Existing               Proposed                          yr                                 Existing             Proposed
          63%               1                  38               136                    0.48                 0.71          0.152                 0.799                      1mth        25%                       0.038               0.200
          39%               2                  44               154                    0.51                 0.75          0.184                 0.961                      2mth        40%                       0.061               0.320
          18%               5                  61               209                    0.57                 0.84          0.286                 1.457                      3mth        50%                       0.076               0.399
          10%              10                  72               245                    0.60                 0.89          0.358                 1.796                      4mth        60%                       0.091               0.479
          5%               20                  84               279                    0.63                 0.93          0.436                 2.146                      6mth        75%                       0.114               0.599
          2%               50                 99                322                    0.69                 1.00          0.565                 2.665                      9mth        90%                       0.136               0.719
          1%               100                111               354                    0.72                 1.00          0.660                 2.930                     12mth       100%                       0.152               0.799




^                                                                                                                                                                                                                                                                                                             1

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.