Council archive · source document
Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (32.8 MB): may take a few minutes to open.
Original PDF page 64, section 2. The text section number identifies this passage in the reader.
AL (ASSUMED)
EXISTI
BUSINESS 3,000m2 OFFICE
ALONG FULL LENGTH 985 m2 (40% F.I.) HEALTH CARE SERVICE
OF WEST BOUNDARY
30 RL
ARTS AND INNOVATION 445m2 RESEARCH AND TECHNOLOGY
EASEMENT CB 4.20
RESIDENTIAL number of apartments MULTIPLE DWELLING
17 1 BEDROOM, 1 BATH
28 2 BEDROOM, 2 BATH
PROJECT SUBJECT SHORT TERM ACCOMMODATION PROJECT No.
NOOSA CIVIC VILLAGE MIXED USE MUSIC WATER QUALITY 22159
DEVELOPMENT CATCHMENT LAYOUT DRAWING No. REVISION
C-DA050 B
0 10 20 30 40 50 ORIGINAL SIZE A1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.