Table 1: Pollutants Typically Generated During the Construction Phase
Pollutant Source
Litter Paper, construction packaging, food packaging, cement bags, off-cuts
Sediment Unprotected exposed soils and stockpiles during earthworks and building
Hydrocarbons Fuel and oil spills, leaks from construction equipment
Toxic materials Cement slurry, asphalt prime, solvents, cleaning agents, washwaters
(e.g. from tile works)
pH altering Acid sulphate soils, cement slurry and washwaters
substances
Table 2: Recommended MUSIC Rainfall-Runoff Generation Parameters
Urban
Parameter Commercial Forested
Residential
Rainfall Threshold (mm) 1 1 1
Soil Storage Capacity (mm) 500 18 120
Initial Storage (% capacity) 10 10 10
Field Capacity (mm) 200 80 80
Infiltration Capacity Coefficient a 211 243 200
Infiltration Capacity Exponent b 5 0.6 1.0
Initial Depth (mm) 50 50 50
Daily Recharge Rate (%) 28 0 25
Daily Baseflow Rate (%) 27 31 3
Daily Deep Seepage Rate (%) 0 0 0
Table 3: Music Base and Storm flow Concentration Parameters
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.