Council archive · source document
Attachment 6 - Stormwater Management Plan and Engineering Response. · MCU23/0078
Plans and drawings: the text below has words only, no drawings.
Very large file (32.8 MB): may take a few minutes to open.
Original PDF page 72, section 1. The text section number identifies this passage in the reader.
NOOSA CITY PLAN - EARTHWORKS CODE Job Ref No.: 22159
Performance Outcomes and Acceptable Solution
Table 9.4.2.3 – CRITERIA FOR ASSESSMENT
COUNCIL USE
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES SOLUTIONS1 COMMENTS
ONLY
Assessable Development
Drainage A01 PO
Filled or excavated areas have a Finished surface levels will ensure the land is free
PO1 minimum gradient of 0.5% and drain to draining. The proposal complies with the Planning
Finished surface levels ensure land is Council’s stormwater infrastructure Scheme Policy.
free draining. where available, or where stormwater
infrastructure is not available, towards
the street.
Hydraulics No acceptable outcome provided PO
The proposal meets the requirements of Council’s
P02 planning scheme policy and does not have an adverse
Change to the levels on site do not have impact on the flooding and drainage characteristics
an adverse impact on the flooding and off-site
drainage characteristics off-site.
Geotechnical Considerations AO3.1
Filling works are undertaken in PO All Earthworks works will comply with Council’s
PO3 accordance with Council’s Planning planning scheme policy. The proposed development
Earthworks do not results in Scheme Policy PSP6 Engineering design will not result in geotechnical instability on-site or the
geotechnical instability on-site or to standards -roads, drainage and nearby premises
nearby premises. earthworks.
AO3.2
1. Solution: PO = Performance Outcome
A/O = Acceptable Outcome
N/A = Not applicable to this proposal
Noosa Civic Village Mixed Use Development, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.