NOOSA CITY PLAN - EARTHWORKS CODE Job Ref No.: 22159
Performance Outcomes and Acceptable Solution
Table 9.4.2.3 – CRITERIA FOR ASSESSMENT
COUNCIL USE
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES SOLUTIONS1 COMMENTS
ONLY
Where the filling is for residential,
commercial or industrial purposes the
works comply with Australian Standard –
Guidelines for earthworks on commercial
& residential development.
Local Amenity AO4.1 PO The design demonstrates that a earthworks work will
The following control measures are be provided that will comply with Council’s planning
PO4 implemented – scheme policy which will not adversely impact on the
Undertaking earthworks does not (a) Regular water spraying of amenity of the local area by way of dust, noise or
adversely impact on the amenity of the exposed areas to suppress dust; visual amenity
local area by way of dust, noise or visual (b) Provision of dust stabilized or
amenity. sealed internal roads;
(c) Protective covering of exposed
areas that are left for more than
2 weeks; and
(d) Unless a development permit
provides otherwise, disturbed
areas are revegetated using
species identified in Council’s
Planning Scheme Policy PSP2
Landscaping.
AO4.2
Earthworks are undertaken only during PO Earthworks will only be undertaken only during the
the hours of 7:00am to 6:00pm, Monday hours of 7:00am to 6:00pm, Monday to Friday and
to Friday and 7:00am to 3:00pm on 7:00am to 3:00pm on Saturday. No work is
Saturday. No work is undertaken on undertaken on Sunday or Public Holidays.
Sunday or Public Holidays.
1. Solution: PO = Performance Outcome
A/O = Acceptable Outcome
N/A = Not applicable to this proposal
Noosa Civic Village Mixed Use Development, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.