NOOSA CITY PLAN - EARTHWORKS CODE                                                                                                                    Job Ref No.: 22159
Performance Outcomes and Acceptable Solution

Table 9.4.2.3 – CRITERIA FOR ASSESSMENT


Haulage activity and amenity                                                             PO

P07
Haulage of material to and from a site                                                        Haulage of material to and from a site will ensure a
ensures –                                                                                     minimal disturbance to surroundings and road
                                          No acceptable outcome provided
    (a) Minimal disturbance to                                                                infrastrucuture.
        neighbouring properties and
        properties along the haulage
        route; and
    (b) Council’s road infrastructure
        including pavements is not
        adversely affected.

Extent of earthworks                      AO8                                            PO
                                          All earthworks, including cut and fill              The construction management plan developed by the
P08                                       batters, retaining walls and the like are           contractor will address on-site parking and
The layout of the development provides    contained within the subject site.                  manoeuvring areas for earthworks activities in
adequate, clearly defined and easily                                                          accordance with the planning scheme.
accessible –
    (a) On-site vehicle parking and
         manoeuvring areas; and
    (b) Loading and manoeuvring
         areas for delivery and service
         vehicles.


Sloping sites                             AO9                                            AO   Cut or fill is less than 1.5m in depth. The proposed
                                          Cut or fill is less than 1.5 metres in depth        surface designs are in accordance with the planning
P09                                       relative to the natural ground level.               scheme policy.
On sloping sites development follows
the natural landform wherever practical
and excavation or filling is minimal.
1.  Solution: PO = Performance Outcome
                A/O = Acceptable Outcome
                N/A = Not applicable to this proposal
Noosa Civic Village Mixed Use Development, Noosaville

Used in these records

About this file

File size
32.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 6 - Stormwater Management Plan and Engineering Response..pdf · 32.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.