NOOSA CITY PLAN - EARTHWORKS CODE Job Ref No.: 22159
Performance Outcomes and Acceptable Solution
Table 9.4.2.3 – CRITERIA FOR ASSESSMENT
Infrastructure protection PO
Earthworks and vehicular access will not adversely
PO10 No acceptable outcome provided impact on the capacity, operations and maintenance
Earthworks and vehicular access do not of existing infrastructure.
adversely impact on the capacity,
operations and maintenance of existing
infrastructure.
Environmental protection PO
Earthworks works will minimise any adverse impact
PO11 upon groundwater, watercourse, drainage lines,
Earthworks minimise any adverse No acceptable outcome provided wetlands, and native vegetation.
impact upon groundwater,
watercourse, drainage lines, wetlands,
and native vegetation.
Dams AO12.1 N/A
Where the site is in the Rural zone –
PO12
Dam location and construction does not (a) The land has a slope of less than 25%
impact upon neighbouring (1:4)
properties or road reserves, in terms (b) The earthworks including cut and fill
of— batters and retaining walls are set
(a) Hydrology; back a minimum of 50 metres from
(b) Alteration of existing overland the property boundary; and
flow paths and patterns; (c) The size of the lot is greater than 5
(c) Landslide or failure of dam wall; hectares
and
(d) Effluent disposal areas. AO12.2
Where the site is in the Rural residential
zone or the Rural zone and the lot is
less than 5 hectares:
1. Solution: PO = Performance Outcome
A/O = Acceptable Outcome
N/A = Not applicable to this proposal
Noosa Civic Village Mixed Use Development, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Stormwater Management Plan and Engineering Response..pdfRelated documentApplication case desk ↗
About this file
- File size
- 32.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.