33. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
on construction works during the maintenance period, which is a minimum period of 12 months duration.
Such bond must be lodged by, and shall only be accepted from the Developer for the works.
34. The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
completed.
35. These works are also to be in compliance with the relevant conditions of Development Permit No.
2004/4206.
36. Notwithstanding that Council has checked the plans with due care, where it is found during construction
that variations from Council's standards exist, then Council standards shall apply.
Water & Sewerage
All works shall be carried out in accordance with the sewerage plans 0619-01B - Site Plan and Sediment
Control Plan, 0619-02B - Sewer Layout Plan and 0619-03A - Sewer Longitudinal Plan and as may be
amended by the conditions listed below.
37. A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of the date of
this Decision Notice, and prior to commencement of works.
38. The names of any proposed contractors for works are to be submitted in writing, together with copies of
current Public Liability and Workers Compensation Insurances together with certificates of currency for
those policies, for consideration by the Assessment Manager seven (7) days prior to pre-start meetings
and commencement of works.
A separate letter will then be issued approving the contractor (or otherwise) for the works. No other
contractor or subcontractor shall be engaged to carry out the works or any part of the works without the
written approval of the Assessment Manager.
39. Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence works. A
pre-start meeting shall be arranged prior to commencement of works by contacting Council’s Water &
Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is only available for pre-start
meetings, inspections and testing etc. between the hours of 6:30am to 4:00pm, Monday to Friday.
Inspections will not be available outside these hours unless prior approval is obtained from the Water &
Sewerage Capital Works Manager with any costs incurred by Council outside the hours nominated above,
met by the Contractor/Developer. These costs will be in addition to normal inspection fees.
40. Notwithstanding that Council has checked the plans with due care, where it is found during construction
that variations exist with Council's standards, Council standards shall apply.
41. It is the responsibility of the applicant to ensure that its consultants and contractors take all reasonable care
during the construction of the engineering works to ensure that Council property or facilities (such as
underground drainage, water supply and sewerage) are protected against any damage or interference
whatsoever.
If any Council property or facilities should be damaged by the applicant or any of its consultants or
contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the engineering
works, the applicant and/or its contractors shall forthwith notify the Assessment Manager and shall forthwith
rectify the damage to that property or facility at its cost to the satisfaction of the Assessment Manager prior to
the sealing of the survey plan and/or acceptance of the works on-maintenance. Alternatively, the applicant
may request the Council to carry out the rectification work at the applicant's cost, such cost being paid by the
applicant to the Council prior to the sealing of the survey plan and/or acceptance of the works 'on
maintenance' provided that in the case of emergency, the Council shall be entitled to rectify such damage at
the cost of the applicant such cost being paid prior to the sealing of the survey plan and/or acceptance of the
work 'on maintenance'.
42. The Contractor shall make all necessary arrangements for supply of water required for construction works.
The use of hydrant standpipes on Council mains will NOT be permitted. Contractors should contact
Council’s Water Section on phone 5449 5254 to obtain an application form for issue of a key to access
Council’s water tanker filling stations. Conditions of access and location of filling stations are detailed on
the application form.
43. All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to acceptance
'on maintenance'.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@ac07b383\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - 010.2006.00000159.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 43 KB (small file)
- File type
No other editions are linked here.