Executive                                                                                                                               The Master Plan builds upon existing plans




Summary
                                                                                                                                                Noosaville Foreshore Land Use Master Plan (2018)

                                                                                                                                                The Noosaville Foreshore Land Use Master Plan (2018) identifies key
                                                                                                                                                activities, precincts, and land uses on the foreshore. It sets a clear
                                                                                                                                                vision for the foreshore based on extensive community engagement
                                                                                                                                                and land use issues and outcomes.


                                                                                                                                                Noosa Coastal Hazards Adaptation Plan (2021)

                                                                                                                                                The Noosa Coastal Hazards Adaptation Plan (CHAP, 2021) provides
                                                                                                                                                a plan to improve resilience to coastal risks due to climate change.
The Noosaville foreshore parkland is a beloved              Landuse Master
                                                                                          2025
                                                                                                             Additional                         Recreation areas and parks, roads, footpaths and the gravity-based
recreational, riverside destination for residents within    Plan AND CHAP*                                   studies                            stormwater network in Noosaville are at high risk of negative impacts
the Noosa region and also for visitors seeking a laid-                                                                                          due to erosion, tidal inundation and storm tide inundation. Without
back holiday experience. Interaction with the Noosa                                   Master                                                    proactive resilience, this inundation is expected to restrict access and
River has shaped the history and development of                                        Plan                                                     increase costs to recreational areas, footpaths and roads.
Noosaville, and it is this special relationship that is
so important to preserve and protect for the next
generation.                                                                                                                                     Noosa Council Corporate Plan 2023-2028

                                                                                                                                                The Noosa Council Corporate Plan 2023-2028 outlines our mission,




                                                                                                                        8 years
The Noosaville Foreshore Infrastructure Master Plan
                                                              Project-by-project planning,
has been developed to provide a future-focused                                                                                                  goals and objectives for Noosa over the next 5 years. The Corporate
                                                              engagement, design and delivery
strategic framework for the enhancement of the                                                                                                  Plan has been structured around the following 5 key themes to
Foreshore, guided by fundamental community values.         High Priority                                                                        which this Master Plan is aligned, including; environment, liveability,
                                                                             Concept + Detailed Design + Construction
                                                           Projects                                                                             prosperity, future, and excellence.
The Noosaville Foreshore Infrastructure Master Plan,
sets a vision for the next 20 years with a timeline to
progressively implement various projects and small
infrastructure upgrades.                                                                                                                Key studies which inform this Master Plan
This Master Plan is guided by the vision and voice




                                                                                                                             14 years
of the community as captured in the Noosaville
Foreshore Land Use Master Plan (2018) and responds                                                                                              Noosa Cycling and Walking Strategy and
to climate as captured in Coastal Hazards Adaptation                                                                                            Implementation Plan 2020-2040 (2021)
Plan (CHAP, 2021). Further studies are needed to           Medium Priority
                                                           Projects          Concept + Detailed Design   +    Construction
ensure suitability and viability of the proposed Master
                                                                                                                                                Noosa River Flood Study Upgrade, Volume 4,
Plan outcomes, including concept and detailed design                                                                                            Design Event Modelling Report (2017)
stages.

The staging of projects is essential for project
planning and funding, whilst also ensuring that the                                                                                             Future Tidal Inundation Mapping (2018)
                                                                                                                        20 years


foreshore can continue to function as upgrades and
improvements are undertaken in particular areas. This
Master Plan will help in identifying high, medium and                                                                                           Noosa Shire Council Coastal Hazards, Risk,
low priority projects over the next 20 years.              Low Priority                                                                         Vulnerability & Adaptation Assessment (2023)
                                                                             Concept + Detailed Design   +    Construction
                                                           Projects




                                                                                                                                                                                                                           04
Log in to download the original file

Noosaville Foreshore Infrastructure Master Plan.pdf · 9.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.