NOOSAVILLE FORESHORE INFRASTRUCTURE MASTERPLAN · Noosaville Foreshore Infrastructure Master Plan

of 38

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Master Plan                                                 Master Plan
Purpose                                                     Process
The Noosaville Foreshore Infrastructure Master Plan         This Master Plan has been developed through                The next step included drafting the Master Plan
aims to upgrade, protect and improve what we love           a comprehensive process as laid out in the                 and then subsequently refining it with two rounds of
about this two-kilometre foreshore.                         corresponding timeline.                                    community engagement for further feedback and
                                                                                                                       input (Phase 2 and Phase 3 Engagement + Feedback)
The purpose of the Noosaville Foreshore                     This started with establishing the vision, context, and    to deliver this Final Master plan..
Infrastructure Master Plan is to serve as a tool to guide   site understanding in partnership with the community
the ongoing activation and upgrade of the foreshore.        and a range of experts and external stakeholders
This allows us to protect what we love about the            (Phase 1 Engagement + Feedback).
foreshore into the future, and enhance the experiences                                                                                                                                              We are
                                                                                                                                                                                                     here
of community and visitor alike.
                                                              2023                                                    2024                                                                                        2025
The Master Plan outlines holistic and adaptive                imagine                                                 develop                                          refine                                     deliver
solutions to the challenges we face. The Master Plan is
                                                               Phase 1: Context, Site        Community                Phase 2: Draft            Community              Phase 3: Revised        Community          Final
key in achieving the following:                                Analysis and Vision           Engagement               Master Plan               Engagement             Draft Master Plan       Engagement         Master Plan
· Enhance liveability and community wellbeing
· Upgrade failing and aging infrastructure and
  facilities                                                  Phase 1                                                 Phase 2                                          Phase 3
                                                              Engagement + Feedback                                   Engagement + Feedback                            Engagement + Feedback
· Provide new community facilities which respond to
  changing community needs                                   Before developing the Draft Master Plan,                 The purpose of this phase was to report         The purpose of this phase was to confirm
· Meet necessary standards of service for the                community and stakeholders were asked to:                back on what we heard during Phase 1            with the community and key stakeholders
  community                                                  share their values and vision for the Foreshore,         Engagement and to provide a Draft Master        that we had appropriately addressed the
· Ensure an accessible and inclusive foreshore that          identify infrastructure-related issues that might        Plan for feedback.                              eight key design topics raised in Phase 2
  reflects the diverse needs of our community                prevent people from using the foreshore, and                                                             Engagement.
                                                             share their perspectives on resilience options           From the many responses, we heard a
· Adapt to erosion, higher temperatures, and sea level                                                                strong desire to preserve some of the           Across all methods of engagement,
                                                             (longer term solutions to erosion, heat and
  rise                                                                                                                much-loved assets along the foreshore           the strongest theme was the general
                                                             flooding).
· Achieve long-term cost savings on multi-million                                                                     and maintain the ‘Noosaville’ look and feel.    support of the Revised Draft Noosaville
  dollar asset renewal and maintenance                       This feedback enabled the design team                    There were eight key design topics raised       Foreshore Infrastructure Master Plan.
· Ensure efficient allocation of Council resources           to reflect, reaffirm a vision and set project            by the respondents. We used this feedback       Many respondents thanked Council for
                                                             parameters.                                              to drive the Revised Draft Master Plan.         acknowledging the previous engagement
· Attract external funding to reduce ratepayer costs
                                                                                                                                                                      feedback and incorporating these findings
· Attract local investment
                                                                                                                                                                      into the Revised Draft Master Plan.




                                                                                                                                                                                                                                05
Log in to download the original file

Noosaville Foreshore Infrastructure Master Plan.pdf · 9.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.