                                                                                          2006/1015

      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering
      Design Standards – Roads, Drainage and Earthworks.
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
31.   A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
      be imposed on construction works during the maintenance period, which is a minimum period
      of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
      Developer for the works.
32.   The works to become Council assets will not be accepted "On Maintenance" until the
      landscaping is completed.
33.   These works are also to be in compliance with the relevant conditions of Development Permit
      No. 2004 / 5744.
34.   Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two
      (2) years from the day this permit takes effect during which time all conditions must have been
      complied with and the Plan of Survey lodged with the Council for endorsement.
35.   Notwithstanding that Council has checked the plans with due care, where it is found during
      construction that variations from Council's standards exist, then Council standards shall apply
Water & Sewerage
The water & sewerage plans listed below comply with Noosa Shire Council Planning Scheme Policy
No.6:

Water
M1717-W01 D - Water Reticulation Layout Plan - Sheet 1
M1717-W02 B - Water Reticulation Layout Plan - Sheet 2

Sewerage
M1717-S01 D - Sewer Layout Plan - Sheet 1
M1717-S02 B - Sewer Layout Plan - Sheet 2
M1717-S03 B - Sewer Longitudinal Sections - Sheet 1
M1717-S04 C - Sewer Longitudinal Sections - Sheet 2
M1717-S05 B - Sewer Longitudinal Sections - Sheet 3

This Advice Notice is issued subject to and conditional upon the relevant Approved Development
Permit having been granted to the applicant.


Special Condition

A Compliance Permit for Plumbing Works must be obtained from Council’s Plumbing
Department prior to commencement of works.


1.    A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of the
      date of this Decision Notice, and prior to commencement of works.
2.    The names of any proposed contractors for works are to be submitted in writing, together with
      copies of current Public Liability and Workers Compensation Insurances together with certificates
      of currency for those policies, for consideration by the Assessment Manager seven (7) days prior
      to pre-start meetings and commencement of works.
                                                                                        Page 6 of 16


[OCR of page images]
2006/1015

 

The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au) and Council’s Planning Scheme Policy 5 — Engineering
Design Standards — Roads, Drainage and Earthworks.

Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.

31. A5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
be imposed on construction works during the maintenance period, which is a minimum period
of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
Developer for the works.

32. The works to become Council assets will not be accepted "On Maintenance" until the
landscaping is completed.

33. | These works are also to be in compliance with the relevant conditions of Development Permit
No. 2004 / 5744.

34. Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two
(2) years from the day this permit takes effect during which time all conditions must have been
complied with and the Plan of Survey lodged with the Council for endorsement.

35. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply

Water & Sewerage
The water & sewerage plans listed below comply with Noosa Shire Council Planning Scheme Policy
No.6:

Water
M1717-W01 D - Water Reticulation Layout Plan - Sheet 1
M1717-W02 B - Water Reticulation Layout Plan - Sheet 2

 

Sewerage

M1717-S01 D - Sewer Layout Plan - Sheet 1
M1717-S02 B - Sewer Layout Plan - Sheet 2
M1717-S03 B - Sewer Longitudinal Sections - Sheet 1
M1717-S04 C - Sewer Longitudinal Sections - Sheet 2
M1717-S05 B - Sewer Longitudinal Sections - Sheet 3

This Advice Notice is issued subject to and conditional upon the relevant Approved Development
Permit having been granted to the applicant.

 

Special Condition

A Compliance Permit for Plumbing Works must be obtained from Council’s Plumbing
Department prior to commencement of works.

 

1. A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of the
date of this Decision Notice, and prior to commencement of works.

2. The names of any proposed contractors for works are to be submitted in writing, together with
copies of current Public Liability and Workers Compensation Insurances together with certificates
of currency for those policies, for consideration by the Assessment Manager seven (7) days prior
to pre-start meetings and commencement of works.

Page 6 of 16

Used in these records

About this file

File size
218 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - 010.2006.00001015.002 [As Published].pdf · 218 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.