Original source · versioned page text
Appendix F - Bushfire Hazard Assessment & Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Hazard Assessment & Management Plan v1 NCES REF: J000669 Lot 2 on RP131369 – 108 Black Mountain Range Road, Black Mountain DOCUMENT CONTROL Document: Bushfire Hazard Assessment & Management Plan Client: Total Concept Homes Project Number: J000669 Project: Reconfiguration of a Lot (1 into 2) Site: Lot 2 on RP131369 108 Black Mountain Range Road, Black Mountain File Ref: C:\CLIENTS\TOTAL CONCEPT HOMES – 108 BLACK MOUNTAIN RANGE RD\04_REPORTING\BHAMP\Bushfire Hazard Assessment & Management Plan v1 – 108 Black Mountain Range Rd, Black Mountain.docx Version Date Distribution Author/s Approved 1 13/01/2021 John Gillespie - N. Willis (B. Sc., Dip. Joshua Lee Cadcon CLM., mAABR) – (B. Sc. AES, mEIANZ) Tim English – Total Principal Ecologist - Director Concept Homes DISCLAIMER To the extent permitted by law, North Coast Environmental Services (including its employees, partners and consultants) excludes all liability to any person for any consequences, including but not limited to all losses, damages, costs, expenses, and any other compensation, arising directly or indirectly, from using this publication (in part or whole) and any information or material contained in it. © 2021 i
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.