Original source · versioned page text
Appendix F - Bushfire Hazard Assessment & Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBushfire Hazard Assessment & Management Plan v1 NCES REF: J000669 Lot 2 on RP131369 – 108 Black Mountain Range Road, Black Mountain 6 AUSTRALIAN STANDARD 3959:2018 CONSTRUCTION OF BUILDINGS IN BUSHFIRE PRONE AREAS (AS 3959:2018) SETBACKS The site is mapped within the Natural Hazards Overlay in the Noosa Plan 2020 (refer to Plate 11). Plate 11 – Noosa Bushfire Hazard Overlay In accordance with the definition in the National Construction Code, a designated bushfire prone area in Queensland is land which has been designated under a power of legislation as being subject, or likely to be subject, to bushfires. Construction of a Class 1 dwelling within a designated bushfire prone area triggers building design assessment under AS 3959:2018. The Standard provides minimum construction requirements for new habitable dwellings and habitable building alterations in designated Bushfire Prone Areas. The construction requirements are intended to improve the performance of buildings subjected to burning debris, radiant heat or flame contact. Building works in Designated Bushfire Prone Areas must be built to the Bushfire Attack Level (BAL) construction standard relevant to the building site as identified by the AS 3959:2018 methodology. A specific BAL assessment will be required once building plans have been progressed given the BAL relies on an accurate understanding of the final footprint of the building within the BLE and is required to be assessed against the active iteration of the Standard at the time of assessment. Note rainforest vegetation is not assessable within QLD under AS3959. Based on the separation to SPP hazardous vegetation identified herein, the BAL for Lot 2 is anticipated to be BAL Low however this should be confirmed at the time of building certification. © 2021 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.