Original source · versioned page text
code assessment
20203841 – 65 Eungella Dr, Black Mountain (Dwelling House) Performance outcomes Acceptable outcomes Compliance standard fire brigade fitting connected to the water supply (other than where the water supply is in a swimming pool or dam). Editor’s Note — Water supply capacity for firefighting purposes is in addition to water supply capacity for household use. Flood Hazards AO16.1 Not applicable PO16 Where the development is located in the Flood The site is not affected by the flood Development is designed and sited to ensure risk to people Hazard Area as shown on Flood Hazard Overlay hazard overlay. and property from flooding is avoided or minimised. Map in Schedule 2, the finished floor level of habitable rooms is at least 300 millimetres above the Defined flood event (DFE). OR Not applicable AO16.2 The site is not affected by the flood Where the DFE has not been modelled for the hazard overlay. area, the finished floor level of habitable rooms is at least 500 millimetres above the highest recorded flood. Part 9– Development Codes Noosa Plan 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.