Original source · versioned page text
code assessment
20203841 – 65 Eungella Dr, Black Mountain (Dwelling House) Performance outcomes Acceptable outcomes Compliance Editor's Note—The QDC mandatory provisions MP3.5 also apply to the construction of buildings in flood hazard areas. PO17 No acceptable outcome provided Not applicable Underground car parking areas are designed to drain and Not applicable to dwelling houses in function safely during a flood event and power failure. the Rural Zone. Editor's note—Basements should have flood immunity above the 1%AEP defined flood event with alternative means to mechanical pumping used to achieve such immunity. Major Electricity Infrastructure & Substations AO18.1 Complies with AO18.1 PO18 Development including any sensitive land uses is There is no major electricity Development is sufficiently separated from major electricity at least: infrastructure within the vicinity of the infrastructure and substations to minimise the likelihood of (a) 50 metres from a transmission site. nuisance or complaint. substation; (b) 10 metres from any other substation; and (c) 30 metres from a transmission line easement. AO18.2 Complies with AO18.2 Part 9– Development Codes Noosa Plan 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.