Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

code assessment

of 46

Page text shows just the words. Original shows the document exactly as it was published.

20203841 – 65 Eungella Dr, Black Mountain (Dwelling House)


 Performance outcomes                                             Acceptable outcomes                                             Compliance

                                                                  Editor's Note—The QDC mandatory provisions MP3.5 also
                                                                  apply to the construction of buildings in flood hazard areas.


 PO17                                                             No acceptable outcome provided                                  Not applicable
 Underground car parking areas are designed to drain and
                                                                                                                                  Not applicable to dwelling houses in
 function safely during a flood event and power failure.
                                                                                                                                  the Rural Zone.
 Editor's note—Basements should have flood immunity above the
 1%AEP defined flood event with alternative means to mechanical
 pumping used to achieve such immunity.


 Major Electricity Infrastructure & Substations                   AO18.1                                                          Complies with AO18.1
 PO18                                                             Development including any sensitive land uses is                There is no major electricity
 Development is sufficiently separated from major electricity     at least:                                                       infrastructure within the vicinity of the
 infrastructure and substations to minimise the likelihood of               (a) 50 metres from a transmission                     site.
 nuisance or complaint.                                                         substation;
                                                                            (b) 10 metres from any other substation;
                                                                                and
                                                                            (c) 30 metres from a transmission line
                                                                                easement.

                                                                  AO18.2                                                          Complies with AO18.2

Part 9– Development Codes                                                                                                                                        Noosa Plan 2020
Log in to download the original file

code assessment.pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.