Original source · versioned page text
MCU22/0118 – DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE – SHORT-TERM ACCOMMODATION AT 94 & 142 NOOSA DR, NOOSA HEADS (Referred from Planning & Environment Committee dated 7 November 2023 - Item 5.1) · ATTACHMENT 1 – OFFICER’S REPORT
Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Figure 12 - SARA approved plan 3.3. Statutory Instruments – Planning Scheme The subject site is located in Noosa Heads, with 94 & 142 Noosa Dr, Noosa Heads being a split zoned Tourist Accommodation and Environmental Management and Conservation (EM&C). The proposed short-term accommodation is identified as a consistent use in the Tourist Accommodation zone and an inconsistent use within the EM&C zone. The application is required to follow an impact assessable process and therefore must be assessed against the whole of Noosa Plan 2020, to the extent the provisions are relevant to the development. STRATEGIC FRAMEWORK The Strategic Framework sets the policy direction for the planning scheme and forms the basis for ensuring appropriate development occurs in the planning scheme area for the life of the planning scheme. The Strategic Intent in the Strategic Framework includes the following statements: 3.2 Strategic Intent 3.2.2 A well managed and sustainable Noosa Shire This planning scheme seeks to maintain Council's long standing commitment to a sustainable population and well managed growth through firm Urban Boundaries, development densities and building heights. Unrestrained and unplanned development is resisted in Noosa Shire. Any unanticipated development requires demonstration of a high level of community need. 3.2.5 Noosa's natural environment A network of habitat areas and linkages provide ecological connectivity from a wide cross section of ecosystem types and altitudinal ranges. These connecting habitat areas are shown on Strategic Framework Map SFM-4 - Biodiversity. A diverse network of wetlands is also present, of good ecological condition and encompassing over 16,000 hectares. This interconnected biodiversity network has strong adaptive capacity to endure the impacts of climate change and other emerging challenges because of the size and connectedness of protected areas and remnant vegetation. Management actions and land use planning Page 12 of 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.