Skip to the record
Beware of cheap imitations.

Council archive · source document

SUPERSEDED Change to an Existing Approval - 010.2001.00210331.005 [As Published] · 132001.210331.5

of 11

Text shows just the words. Original shows the document exactly as it was published.

                                                                            22441 DA (2001/210331)




      General
32.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
33.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
34.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
35.   Where the existing retaining wall along the Park Road frontage of the site is removed to create
      the driveway crossover the retaining wall shall be remediated immediately following the
      completion of the earthworks for the driveway. The height of any retaining wall constructed
      within the zone of influence of the existing sewer main shall not exceed one (1) metre unless a
      written approval is obtained from Council’s Infrastructures Delivery Unit. A Development
      Permit for Operational Works shall be obtained for these frontage works.
Building
36.   The Geotechnical report submitted as part of your application has been appraised and
      approved subject to the following conditions:-
      36.1. There is to be no uncontrolled discharge of water onto the slope;
      36.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is
            destroyed it should be reinstated immediately after that stage of construction is
            completed;
      36.3. Additional load due to fill, construction equipment or stockpiled materials should not be
            located on the dune slope;
      36.4. The use of vibratory equipment of any kind is not permitted to be used, including
            vibrating rollers, the use of vibrating installation techniques for sheet piling and other
            construction vibrations caused by excavating, earthmoving or demolition machinery or
            other similar construction techniques;
      36.5. All construction works on site shall accord with the Building Construction Report
            prepared by Whaleycg Consulting Group dated December 2002 and the Morrisson
            Geotechnic reports dated 1/9/00, 25/5/01.
      36.6. A condition survey is to be carried out of adjoining buildings, structures and services
            prior to any demolition works or construction works taking place on site. If distress
            already exists, a photographic survey shall be undertaken, the distress measured and a
            plan to monitor changes to distress shall be implemented. A copy of this report is to be
            submitted to Council within 5 business days of survey and prior to construction work
            proceeding;
      36.7. Copies of all inspection reports by engineers are to be submitted to Council within 5
            business days of the inspection taking place;
      36.8. A RPEQ is to be engaged by the client to oversee the piling works and copies of all
            inspection reports are to be submitted to Council within 5 business days of the
            inspection taking place;




                                                                                    Page 6 of 11

Used in these records

About this file

File size
69 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Change to an Existing Approval - 010.2001.00210331.005 [As Published].pdf · 69 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.