Erosion and Sediment Control
26. Any person acting on this permit shall prevent erosion and sediment export from leaving
the site. Site control measures such as silt fencing, controlled gravel access to the site
and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
General
27. Any damage caused to any public utility during the course of construction shall be
repaired to Council’s standards and at no cost to Council.
28. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
29. The transportation of all materials to and from the site shall be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site shall be covered to prevent materials including dust being
windblown from the vehicle.
Building Services
30. The Geotechnical report prepared by Golder Associates Pty Ltd is approved subject to
the following conditions:-
30.1 There is to be no uncontrolled discharge of water onto the slope;
30.2 Stripping of vegetation for construction purposes should be minimised. If vegetation
is destroyed it should be reinstated immediately after construction is completed;
30.3 Additional load due to fill, construction equipment or stockpiled materials should not
be located on the dune slope;
30.4 The use of vibratory equipment of any kind is not permitted to be used, including
vibrating rollers, the use of vibrating installation techniques for sheet piling and other
construction vibrations caused by excavating, earthmoving or demolition machinery
or other similar construction techniques;
30.5 A RPEQ is to be engaged by the client to oversee the piling works;
30.6 The applicant’s Geotechnical engineer will be required to be on site for the whole of
the time during any major excavation. The construction of the whole of the foundations
is to be supervised and directed by a consulting Geotechnical engineer. If there is a
risk of sand movement occurring, all work shall be suspended until such steps,
approved by the applicant’s Geotechnical engineer, have been taken to ensure that
no further slippage will result
5. REFERRAL AGENCIES
Not applicable
6. ADVISORY NOTES
ADVICE
1. Approval of this development application will trigger an Infrastructure Charge in
accordance with the Coastal Major Road Network Infrastructure Charges Plan for the
estimated amount of $2,588. This amount will subject to variations in the Consumer Price
Index, All Groups Brisbane from June 2005 until the date of payment. An Infrastructure
Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning
Act 1997.
Page 5 of 7
Document Set ID: 23097952
Version: 4, Version Date: 11/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132005 307 01Related documentApplication case desk ↗
About this file
- File size
- 158 KB (small file)
- File type
No other editions are linked here.