Minor Change Existing Approval 132005 307 01 · 132005.307.01
preferred to have the footpath continue at a constant grade to minimise the potential for
pedestrians to trip or fall.
Pathway Contributions
17. A pathway contribution of $252 towards external major pathways, in accordance with
Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to
the Council prior to obtaining a Development Permit for Operational Works. This amount
will be subject to variations in the Consumer Price Index, All Groups Brisbane from June
2005 until the date of payment.
Stormwater Drainage
18. All stormwater drainage shall be collected on site and discharged so there is no net
increase in stormwater runoff from the site and generally in accordance with the
Pavement and Stormwater Plan and Details – Drawing No. S3064/05/R1.
19. Roof runoff from the new dwelling shall be directed to a rainwater storage system or tank
(minimum storage 3000 litres) that is plumbed to service the toilets in the new dwelling
and landscaping areas. The design of the rainwater storage system shall be to the
satisfaction of the Manager Plumbing Services.
20. The overflow runoff and all other stormwater shall be collected on site and discharged
through the proposed infiltration pit.
To this end, a detailed maintenance plan shall be prepared for the proposed infiltration pit,
which shall be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
The approved maintenance plan shall be incorporated in the ongoing maintenance for the
development.
A Development Permit for Building Works shall not be granted until a Development
Permit for Operational Works has been issued in regard to the drainage scheme.
21. All site stormwater drainage shall be by means of a gravity system.
Mechanical pump out systems shall not be used to dispose of surface stormwater
runoff not being reused in toilets and landscaping.
Overflow from the reuse system shall be by gravity system.
Sewer Mains
22. The dwelling shall be connected to Council’s existing sewerage reticulation systems and
be constructed in accordance with Council’s standards and requirements at no cost to
Council.
Town Water Supply
23. The dwelling shall be connected to Council’s existing town water supply and be
constructed in accordance with Council’s standards and requirements at no cost to
Council.
Earthworks
24. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to plan endorsement. In this regard any fences to be replaced shall be
clearly shown on the plans submitted for Operational Works approval.
Site Stability
25. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect
the stability of adjoining buildings and/or structures, and make recommendations on the
type of foundation system(s) best suited for the proposed development. This information
shall be submitted to the Council prior to obtaining a Development Permit for Operational
Page 4 of 7
Document Set ID: 23097952
Version: 4, Version Date: 11/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132005 307 01Related documentApplication case desk ↗
About this file
- File size
- 158 KB (small file)
- File type
No other editions are linked here.