Waste Management Plan oct21 BDH
Attached to the e-mail Response to RFI - MCU21/0145 - 170-174 Eumundi Noosa Road Noosaville.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3.0 Operational Waste Management Plan
Once constructed, an application will be made with Noosa Council for Commercial Waste Services,
involving Refuse and Recycle Bulk Bins (1,100ltr low noise). The following table outlines the general mix of
wastes expected to be generated, however depending on the mix of uses within the neighbourhood centre,
the estimated waste volumes may be subject to change.
Typical Waste Estimated Treatment Reuse Recycle Disposal
Stream Volume
20L Collected and disposed - - Disposal by Council
Garbage generated
in relevant bin area contractor
(total)
10L Collected and placed in - Yes -
Paper
recycling container on
site
10L Collected and placed in - Yes -
Cardboard
recycling container on
site
5L Collected and placed in - Yes -
Glass
recycling container on
site
nil Collected and placed in - Yes -
Aluminium
recycling container on
site
10m3 Collected and placed in - N/A -
Steel
recycling container on
site
10L Collected and placed in - Yes -
Plastic containers
recycling container on
site
20L Collected and disposed - Yes -
Plastic wrap
in bins on site.
20L Collected and placed in - Yes -
Plastic
recycling container on
components site
10L Collected and disposed - Yes -
Polystyrene
in bins on site.
nil Collected and disposed - Yes -
Foam
in bins on site.
200m3 Collected and disposed - Yes -
Rubber / Tyres
in bins on site.
Nil Collected and disposed - Yes -
Timber
in bins on site.
10L N/A
Garden waste
10L Collected and disposed - Yes to Council -
Organic waste
in relevant bin area approved facility
(foodscraps)
Other Collected and disposed
in bins on site.
The tenant will be responsible for collection and disposal of refuse to the designated bin and recycling areas
located on the site plan. All bins are to be stored and located in the bin area. The provision of bins and
changes in uses on the site will be reviewed in association with the business operations every 6 months.
The tenant is responsible for recycling and waste education with the objective of waste minimisation and re-
use of waste. The tenant is also to coordinate with waste contractor the pickup times and have bins
organised so as not to result in disruption to business.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.