Appendix 1 - DA Permit 04-0429 Approval
Noosa Council documents
Environment & Planning Committee Reports 22/10/04 - Ordinary Meeting 4/11/04 13
1.2. Sunday or public holiday, at any time.
A maximum penalty of $1,500 applies to an offence under these provisions
2. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt,
mud, paint, cement, concrete, builders waste or rubbish shall not be permitted to enter
or be placed where it could reasonably be expected to move into a roadside gutter,
stormwater drain or a water course. On the spot fines apply for such offences.
3. A Registered Professional Engineer of Queensland shall certify engineering drawings
and specifications for all engineering works, which shall be submitted in conjunction
with an application for a Development Permit for Operational Works.
4. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991
Act if the cost of operational works exceeds $80,000, then a portable long service levy
is required to be paid. In accordance with Section 77.(1) of the Act, Council is required
to sight the approved form issued by the Building and Construction Industry (Portable
Long Service Leave) Authority that confirms that the requirements of the Act have been
satisfied. A statutory declaration outlining the cost of the operational works must be
submitted to Council with the lodgement of any application for operational works over
the site.
Roadworks Contributions
5. Approval of this development application has triggered an Infrastructure Charge in
accordance with the Coastal Major Road Network Infrastructure Charges Plan for the
amount of $531.00 and is subject to variations in the Price Index, All Groups Brisbane
from June 2004 until the date of payment.
An Infrastructure Charge Notice is attached in accordance with Chapter 5 of the
Integrated Planning Act 1997.
6. Payment via credit card transaction will not be an acceptable method of payment for
development contributions conditioned in this permit or for infrastructure charge notices
issued separately.
7. For the following classes of work associated with development, a Development Permit
for Operational Works must be obtained prior to commencement of works relating to
that class of work. The application may combine any or all of these classes of work:-
7.1. Stormwater Drainage.
7.2. Landscaping.
Concurrence Agency Conditions Environmental Protection Agency
1. Prior to the commencement of any excavation, earthworks or other soil disturbance
associated with the proposed development of the subject lot/s (the site), that part of the
site to be so worked is to be subjected to investigation and any necessary remediation of
UXO contamination.
Print Date: 15 July 2020, 2:02 PM