Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Appendix 1 - DA Permit 04-0429 Approval

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




               Environment & Planning Committee Reports 22/10/04 - Ordinary Meeting 4/11/04 12
               35.   Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
                     located in a manner which prevents a noise nuisance beyond the subject land in
                     accordance with the nuisance provisions of the Environmental Protection Regulation
                     1998. On the spot fines apply for such offences.

               36.   Noise emission from air conditioning equipment shall comply with the following
                     requirements:

               36.1. The equipment shall be installed and located in a manner which prevents noise nuisance
                     beyond the subject land in accordance with the nuisance provisions of the
                     Environmental Protection Regulation 1998 and Council’s Local Law No. 12 - Control
                     of Nuisances. Infringement Notices (on-the-spot fines) may apply for offences.

               36.2. Submission of written certification from a suitably qualified person confirming that the
                     noise levels comply when measured at the nearest residential boundary. This is
                     required immediately after installation of the equipment and prior to any occupation of
                     the building, and in a format approved by Council.

               36.3. A person must not use equipment on any day if it makes or causes noise to be made –

               36.3.1.    Before 7am or after 10pm: More than the lower of either –

                                    40 d(B)A

                                    3 d(B)A above the background noise level

               36.3.2.    From 7am to 7pm: More than the lower of either –

                                    50 d(B)A

                                    5 d(B)A above the background noise level

               36.3.3.    From 7pm to 10pm: More than 3 d(B)A above the background noise level.

               Further Development Permits Required:-

               1.    Prior to the commencement of development, the following Development Permits must
                     be obtained:-

                     1.1. Development Permit for building works;

                     1.2. Development Permit for Operational Works of Landscaping and Stormwater
                          Drainage.

               Advice

               1.    The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder
                     from making noise from:-

               1.1. Monday to Saturday, before 7:00am or after 6:30pm




                                                                                                Print Date: 15 July 2020, 2:02 PM
Log in to download the original file

Appendix 1 - DA Permit 04-0429 Approval.pdf · 706 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.