Skip to the record
Accept no imitations.

Original source · versioned page text

Appendix 1 - DA Permit 04-0429 Approval

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




               Environment & Planning Committee Reports 22/10/04 - Ordinary Meeting 4/11/04 9
               Land Development

               Vehicle Access

               15.   A vehicular access driveway to serve shall be from the Martin Street frontage of the
                     site.

               16.   All vehicles shall enter and leave the site in a forward direction.

               Carparking

               Off Street

               17.   Carparking shall be provided within the site as shown on drawing number SK02a.

               18.   A minimum of 1 uncovered carparking space and 2 covered carparking spaces shall be
                     provided on site.

               19.   The carparking area shall be designed to comply with the provisions of AS 2890.1-1993
                     for user class 1.

               Pathway Contributions

               20.   A pathway contribution of $68.00 towards external major pathways, in accordance with
                     Planning Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to
                     the Council prior to obtaining a Development Permit for Operational Works. This
                     amount will be subject to variations in the Price Index, All Groups Brisbane from June
                     2004 until the date of payment.

               Stormwater Drainage

               21.   All stormwater drainage shall be collected on site and discharged to Council’s existing
                     drainage structures in Martin Street. In this regard, plans shall be prepared by a
                     Registered Professional Civil Engineer and submitted to Council prior to obtaining a
                     Development Permit for Operational Works.

               Sewer Mains

               22.   The site shall be connected to Council’s existing sewerage reticulation systems and be
                     constructed in accordance with Council’s standards and requirements at no cost to
                     Council.

               Town Water Supply

               23.   The site shall be connected to Council’s existing town water supply and be constructed
                     in accordance with Council’s standards and requirements at no cost to Council.

               Service Easements




                                                                                               Print Date: 15 July 2020, 2:02 PM
Log in to download the original file

Appendix 1 - DA Permit 04-0429 Approval.pdf · 706 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.