Appendix 1 - DA Permit 04-0429 Approval

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




               Environment & Planning Committee Reports 22/10/04 - Ordinary Meeting 4/11/04 10
               24.   A registered easement shall be created over the existing sewer main that crosses the site.
                     The easements shall generally be parallel to and centred over the sewer main and be
                     equivalent in width to twice the depth to invert level of the sewer at the deepest point
                     within the allotment (measured from the finished surface) and be no less than 3.0 metres
                     wide.

                     In this regard, plans submitted for Operational Works approval shall accurately show
                     the location of the easement.

                     In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
                     undertaking in writing that the Title Deed and the easement documents will be lodged at
                     the Land Titles Office and any additional Titles Office forms or requisitions requiring
                     the consent of Council will be attended to promptly.

                     A duly executed copy of the easement shall be submitted to Council for perusal prior to
                     the use commencing.

                     Any changes required by Council’s Solicitor must be corrected immediately.

               25.   No building or other structure shall be constructed or encroach over an easement. Any
                     building or structure within proximity of an easement or any other public utility’s
                     underground must have its foundations designed so that no surcharge loads are
                     imposed upon such underground infrastructure. Foundations must be taken down a
                     minimum of 1 metre below a line of influence measured 1 metre in the direction of the
                     foundation from the centreline of the closest underground service and along the natural
                     angle of repose of the foundation soil type(s).

                     Plans, and supportive documents, detailing these proposed foundations shall be
                     designed by a registered practicing Geotechnical Engineer and submitted with the
                     application for a Development Permit for Operational Works.

               Headworks

               26.   Contributions shall be paid to Council in accordance with Planning Scheme Policies
                     PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage
                     Headworks Contributions respectively and at the rates applicable at the time of
                     payment. An estimate only of the contribution rates as of June 2004 under the current
                     policies is as follows:

                     Water Supply      $1,097

                     Sewerage          $1,271

                     TOTAL             $2,368

                     All headworks contributions must be paid prior to the issue of a Development Permit
                     for Operational Works.




                                                                                                   Print Date: 15 July 2020, 2:02 PM
Log in to download the original file

Appendix 1 - DA Permit 04-0429 Approval.pdf · 706 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.