Referral Agency Response - Planning RAP21 0020 · OPW21/0315
b. generally in accordance with SCG’s plans:
i. 31073-OW4.1, “Driveway Crossover Plan” dated August 2021;
ii. 31073-OW4.2, “Driveway Long Section & Details”, dated August 2021; and
c. undertaken with written approval in accordance with Noosa Council driveway
crossover approval conditions and adopted standard drawings for the crossover
type as required by the planning scheme.
9. The construction of the driveway must include a suitable flood barrier to prevent
floodwaters from up to and including the 1%AEP event, entering the basement.
Certification of the completed works from a Registered Professional Engineer of
Queensland must be submitted to Council prior to the commencement of the use.
Stormwater Drainage
10. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. Stormwater discharged from the site must be directed to the kerb
and channel in Wyuna Drive. The works must be undertaken generally in accordance
with drawing number 31073-SW1.1 prepared by SCG Consulting Engineers dated
August 2021
Earthworks and Retaining Walls
11. All earthworks must be undertaken in accordance with an Operational Works approval
and be generally in accordance with drawings number 31073-OW3.1, “Earthworks &
Piling Plan” prepared by SCG Consulting Engineers dated August 2021 and 31073-
OW3.2 “Earthworks & Piling Detail” prepared by SCG Consulting Engineers dated
August 2021
12. All earthworks must be supervised by a Registered Professional Engineer of
Queensland (RPEQ)
13. All earthworks and associated retaining structures/batters, both above and below ground
level and both temporary and permanent, must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
14. Earthworks carried out on site must not affect the structural integrity of any of the
adjoining lands and/or buildings and/or structures and/or services.
15. All works must not adversely impact on the existing revetment wall located along the
canal boundary.
16. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height.
17. Prior to the commencement of the use certification must be submitted to Council from a
qualified person* which certifies that the development has been constructed in
accordance with the approved plans and best practise methods and that the
development will remain stable in the longer term.
*(Refer to advisory Note)
Damage to Services and Assets
18. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Planning RAP21 0020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 358 KB (small file)
- File type
No other editions are linked here.