Referral Agency Response - Planning RAP21 0020 · OPW21/0315
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Erosion & Sediment Control
19. At all times, the site must be managed in accordance with Healthy Land and Water
Erosion and Sediment Control Toolkit for House Builders 2019, available at:
https://hlw.org.au/download/erosion-and-sediment-control-toolkit-for-house-builders/ .
20. A construction hold point with a council delegate and supervising RPEQ must be
established prior to commencement of works under this approval. The hold point must
be held as soon as reasonably practical and prior to the first rain event forecast following
initial removal of soil stabilising material on the site. At the hold point inspection, all
required site entry pad, downslope silt fences and upstream stormwater diversion
controls must be installed.
Acid Sulfate Soil
21. A Geotechnical Engineer or other suitably qualified person experienced with Acid Sulfate
Soils Management must be engaged at least two prior to the commencement of works
in order to facilitate design and delivery of Acid Sulfate Soil related conditions in
accordance with the following National Acid Sulfate Soil guidance documents:
a. National Acid Sulfate Soils Guidance: National acid sulfate soils sampling and
identification methods manual, Department of Agriculture and Water Resources,
Canberra (Sullivan et al, 2018); and
b. National Acid Sulfate Soils Guidance: National Acid Sulfate Soils Identification and
Laboratory Methods Manual, Department of Agriculture and Water Resources,
Canberra; and
c. the Australian Standard 4969
22. All excavation and dewatering works below the elevation of 5m AHD must be undertaken
in accordance a Dewatering Management Plan that is prepared by a suitably qualified
person, certified by the sites qualified person experienced with Acid Sulfate Soils
Management and approved by Council prior to the commencement of the works. The
dewatering plan must be submitted to Council for review a minimum 20 business days
prior to commencement of works and in particular demonstrate that the construction and
operational phase of the develo0pment will:
a. include an Acid Sulfate Soil and groundwater investigation prepared in
accordance with the National Acid Sulfate Soil Guidance documents
b. identify whether depth of excavations can be reduced where reasonably possible
to avoid disturbance and oxidation of potential acid sulfate soils below permanent
groundwater levels;
c. not permanently or temporarily extract groundwater that results in the aeration of
previously saturated ASS;
d. not result in potential or previously saturated actual ASS being aerated
e. nominate holdpoints during construction to facilitate for certification by the suitably
qualified person experienced with Acid Sulfate Soils, as well as Council
Development Engineer to ensure all possible avenues for continual dewatering
below permanent groundwater level, including around pipework bedding that
outlet to waterways, are appropriately sealed.
Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Planning RAP21 0020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 358 KB (small file)
- File type
No other editions are linked here.