23. The Geotechnical Engineer or other suitably qualified person must identify any
infrastructure expected to be located in the expected cone of depression and likely to be
within previously un-oxidised Potential Acid Sulfate Soils. Dilapidation report of this
infrastructure must be completed prior to commencement of any dewatering activities
on the site.
24. All excavation and dewatering works must be undertaken in a manner that will not cause
environmental harm or damage to surrounding infrastructure as a result of the
developments interaction with actual or potential Acid Sulphate Soils. An environmental
professional with a minimum of 5 years’ experience in the management and treatment
of Acid Sulfate Soils must be engaged to supervise and certify compliance with this
condition.
25. All treated material must undergo verification testing to achieve neutralisation in
accordance with the Queensland Acid Sulfate Soil Technical Manual: Soil Management
Guidelines v4.0.
26. Surface waters must be sampled and tested at a NATA certified laboratory to confirm
the following water parameters are met prior to release from the site:
a. a pH range of 6.5-8.5 pH units;
b. 50mg/L maximum total suspended solids concentration;
c. 0.3mg/L maximum total iron concentration;
d. 0.2mg/L maximum total aluminium concentration.
27. Groundwater monitoring bores must be established and installed by a Geotechnical
Engineer or other suitably qualified person experienced with Acid Sulfate Soils
Management. The location of the groundwater monitoring bores must be certified by the
Geotechnical Engineer or other suitably qualified person to be sufficient to identify any
changes in groundwater levels as a result of proposed construction activities.
28. Groundwater levels must, be monitored weekly for at least one month prior to
construction activities likely to affect groundwater levels and daily during construction of
those activities. Within 24 hours of identifying a reduction in groundwater levels below
the lowest measured pre-construction levels, the Geotechnical Engineer must provide
Council and Contractor with remediation strategies, and these must be implemented to
prevent harm to receiving environments.
29. All pipework within the saturated zone, that outlets direct to waterways must be fitted
with buried headstocks at suitable intervals to prevent ongoing dewatering of
groundwater along pipework bedding.
4. REASONS FOR INCLUSION OF CONDITIONS
The proposal is subject to specific built form parameters outlined in The Noosa Plan.
5. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the referral agency conditions:
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person
who carries out an activity must take all reasonable and practicable measures to ensure
the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply
with the duty of care. Substantial monetary penalties may apply to individuals or
Page 5 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Planning RAP21 0020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 358 KB (small file)
- File type
No other editions are linked here.