Original source · versioned page text
2019-12-10 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 DECEMBER 2019
a. construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice
b. removal of the existing/redundant property accesses and reinstatement of the
kerb, footpath and verge area to match the balance of the site frontage,
including the provision of topsoil and turf where the existing verge is grassed
Site Access and Driveways
18. Sealed access driveways must be provided from Mary Street and Weyba Road to all
parking and manoeuvring areas of the development. The works must be generally in
accordance with drawings numbered CON01 issue DR6 and CON05 issue DR6 both
dated 4 September 2019 prepared by Empire Engineering and undertaken in
accordance with an Operational Works approval. The works must include in
particular:
a. driveway crossovers generally in accordance with Council’s Standard Drawing
RS-051 and any associated addendum
b. suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety. Warning signage
must be provided near the exit driveways to warn motorists of pedestrian
movement along the streets
Car Parking
19. A minimum of 9 car parking spaces must be provided and marked on the site and
made available and accessible at all times while the use is open for business. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. 1 disabled parking space/s within the total
b. dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities
20. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Service Vehicles
21. Service vehicle parking, manoeuvring and standing spaces must be provided on the
site. The works must be undertaken in accordance with an Operational Works
approval.
Pedestrian and Bicycle Facilities
22. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a 2 metre wide footpath within the road verge for the entire length of the site’s
frontage to Mary Street and Weyba Road
b. pram ramps and tactiles generally as indicated on the approved plans
Condition 20 is imposed pursuant to s128 of the Planning Act 2016 being necessary
trunk infrastructure identified by Council’s LGIP to service the development.
Stormwater Drainage
23. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
Page 24 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.