PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 DECEMBER 2019
a. works generally in accordance with the Stormwater Quality Management Plan,
Project ref:CC-3668, Revision D dated June 2019 prepared by Empire
Engineering
b. works generally in accordance with drawings numbered CON01-04, issue DR6
dated 4 September 2019 prepared by Empire Engineering with the following
amendments:
i. Section D/C01: the impermeable liner to encompass the whole system
including the base
ii. Suitable cover provided between the underground drainage lines and
finished surface levels
Condition 21 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Electricity and Telecommunication Services
24. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
25. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
26. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
27. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
28. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
29. All fill, associated batters and retaining structures must be contained entirely within
the subject site unless written permission from the respective landowner(s) is
provided to Council. All earthworks must be undertaken in accordance with the
provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial
and Residential Developments.
30. Where the development involves excavation or filling over, or adjacent to, drainage,
water supply or sewerage infrastructure, all access chamber surface levels must be
adjusted to provide a freeboard of 100mm above the finished ground surface level.
Damage to Services and Assets
31. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Page 25 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.