Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-10 Planning & Environment Committee Agenda

of 84

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             10 DECEMBER 2019


          Waste storage areas must provide for adequate separation of all reusable, recyclable
          and waste materials. These must be located so that they are convenient and safe to
          use.
          The Plan must contain the following information:
          a.    The areas for the storage and separation of waste shown on a site plan;
          b.    A waste management table as indicated below is to be completed showing how
                waste material is to be segregated - recycled – reused or disposed; and
          c.    Table – Waste Management Table
           MATERIALS ON-SITE                                     DESTINATION
                                                   Re-use and Recycling                    Disposal
           Expected         Estimated     On-site             Off-site               *specify contractor
           waste            volume(m³)    *specify proposed   *specify contractor    and landfill site or
           materials                      re-use or on-site   and recycling outlet   other disposal site
                                          recycling methods
           Excavation
           material
           Green waste
           Bricks
           Concrete
           Timber-please
           specify
           Plasterboard
           Metals -
           please specify
           Asbestos
           Other - please
           specify
          Note * If a demolition contractor is undertaking works, then the Waste Management
          table is to be completed by the demolition contractor.
          Damage to infrastructure
    46.   Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
          bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
          Vacant site
    47.   The site must be left clean and tidy free from debris such as concrete, wire, rubble,
          brick/s and the like. If the site remains vacant for more than 30 days the lot/s must be
          turfed or landscaped in accordance with Planning Scheme Policy PSP 3 –
          Landscaping Plants and Guidelines and to the satisfaction of Council so as to not
          cause nuisance to the surrounding area.
    48.   All waste materials must be removed from site.
          Litter, erosion and sediment control
    49.   Litter, erosion and sediment control measures must be installed and maintained until
          soils are stabilised by turf, vegetation or sealed.
          Note: it is an offence under the Environmental Protection Act 1994 to deposit or
          potentially allow litter, waste, soil, or other contaminants to enter a waterway or storm
          water drainage system (e.g. roadside gutter).




                                                                                     Page 28 of 84
Log in to download the original file

2019-12-10 Planning & Environment Committee Agenda(PDF, 6MB).pdf · 6.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.