PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                            10 DECEMBER 2019


    50.   A construction hold point with a council delegate and supervising RPEQ must be
          established prior to commencement of cut to fill earthworks for each stage of the
          development. The hold point must be held as soon as reasonably practical and prior
          to the first rain event forecast following initial tree clearing or removal of soil
          stabilising material for each stage. At the hold point inspection, all required sediment
          basins, drains and bunds to divert waters away from disturbed soil or soils about to
          become exposed through cut to fill activities must be installed. All areas that will not
          require earthworks in the imminent cut to fill operation must be stabilised to prevent
          entrainment of sediments into receiving waters.
    51.   Cut to fill earthworks must not commence until after the Supervising RPEQ has
          certified that all installed erosion and sediment controls required by this approval are
          sized in accordance with conditions of the approval and the written acceptance of the
          certification is provided to the supervising RPEQ by Council officers.
          Asbestos
    52.   Removal of building materials containing asbestos must be undertaken by a licensed
          asbestos removalist.
    53.   Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
          requires a licensed asbestos removalist to give notice to Workplace Health and
          Safety Queensland (WHSQ) of licensed asbestos removal work at least five days
          before the work commences. Notification must be made using Form 65: Notification
          of licensed asbestos removal work, demolition work or emergency demolition.
    54.   All building materials containing asbestos products are wrapped and disposed of in
          accordance with the Public Health Regulation 2006 and the Environmental Protection
          Regulation 2008.
          Note: Asbestos is a Regulated Waste. The Department of Environment & Science
          licenses businesses that transport asbestos waste, and landfills that accept this
          waste.
    55.   All building materials containing asbestos, including asbestos cement sheeting or
          roofing and lagging are removed from the building prior to demolition/relocation.
          Plumbing and Drainage
    56.   It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2003’ that at
          demolition of a building, the existing sanitary drain upstream from the connection
          point for a service provider’s sewerage system must be sealed water tight. This work
          is deemed as notifiable Work and must be carried out by a suitably licenced plumber
          who must submit an As Constructed plan and Form 4 (Notifiable Works Form) to the
          QBCC (Queensland Building Construction Commission) within 10 days of completing
          the work.
          Development Code – Hazardous Industry
    57.   The design, specifications and construction of the Manifest Quantity Workplace
          (MQW) storage and dispensing of petroleum products (Service Station) is to comply
          in all respects with the Model Development Code for Hazardous Industries and
          Chemicals - Workplace Health and Safety Queensland(WHSQ)
    58.   Certification must be provided to Council from a suitably qualified person* which
          certifies that the design, construction, operation and safety of the MQW (specifically
          including the design and operation of the stormwater quality improvement device:
          treatment tank/Stormwater 360 pods filter cartridges & detention tank) complies in all
          respects with the WHSQ Code prior to commissioning the site.




                                                                                   Page 29 of 84
Log in to download the original file

2019-12-10 Planning & Environment Committee Agenda(PDF, 6MB).pdf · 6.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.