c. The uncovered forecourt area is to be graded and drained to an independently
certified stormwater treatment system listed on Council’s Register for Certified
Hydrocarbon Separators. The system shall be installed in accordance with the
approved site-based stormwater quality management plan.
Submit certification
79. Prior to the commencement of the use certification by a suitably qualified person that
the uncovered forecourt area has been installed and constructed in accordance with
the above requirements must be submitted to Council.
Road tanker delivery stands
80. Prior to the commencement of the use the road tanker delivery stand shall be located
fully within the fuel dispensing area or the road tanker delivery stand located within
the uncovered forecourt area shall be constructed and installed in accordance with
the following:
a. the area shall be large enough so a tanker can fit wholly within the delivery
stand area.
b. the area shall be clearly demarcated.
c. the area shall be drained to a collection sump that normally drains to the
uncovered forecourt area’s stormwater treatment system.
d. a diversion valve shall be installed that diverts drainage to the containment and
treatment system for the fuel dispensing area during filling operations.
Submit certification
81. Prior to the commencement of the use certification by a suitably qualified person that
the road tanker delivery stand has been designed, constructed and installed in
accordance with the above requirements must be submitted to Council.
Stage 1 vapour recovery
82. Prior to the commencement of the use construct and install stage 1 vapour recovery
for underground systems storing motor spirit/petrol that has:
a. vapour return lines that return all vapour displaced from the storage tank to the
delivery tanker.
b. a design that prevents the mixing of product in piping common to more than
one tank.
c. vapour-tight couplings on the vapour line that close automatically when
disconnected.
d. incompatible liquid and vapour couplings.
e. a pressure vacuum valve and a 10-millimetre orifice in parallel fitted to the
storage tank vent pipe, or accepted equivalent.
f. the vapour recovery point located within 2 metres of the respective fill point.
Submit certification
83. Prior to the commencement of the use certification by a suitably qualified person that
stage 1 vapour recovery equipment has been constructed and installed in
accordance with the above requirements must be submitted to Council.
Stage 2 vapour recovery systems
84. Prior to the commencement of the use Stage 2 vapour recovery (VR2) equipment
shall be designed and installed in accordance with the following:
Page 33 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.