PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                           10 DECEMBER 2019


          b.   Install ‘safe suction’ design for suction piping in compliance with cl 4.3.4 AS
               4897. The design, installation and operation of underground petroleum storage
               systems.
          Submit certification
    74.   Prior to the commencement of the use certification from a suitably qualified person
          that the leak detection system was installed and was verified as meeting the above
          leak detection performance standard using the current United States Environmental
          Protection Agency (USEPA) protocol must be submitted to Council, or
    75.   Prior to the commencement of the use certification from a suitably qualified person
          that the safe suction design has been installed and tested to comply with cl 4.3.4 AS
          4897. The design, installation and operation of underground petroleum storage
          systems must be submitted to Council.
          Fuel dispensing areas
    76.   Prior to the commencement of the use fuel dispensing areas shall be constructed and
          installed in accordance with the following:
          a.   All ground surfaces within the fuel dispensing area are to be constructed of
               impermeable materials such as waterproofed, reinforced concrete that is free of
               gaps and/or cracks. Impermeable, hydrocarbon resistant jointing material is to
               be used between treated concrete slabs.
          b.   The fuel dispensing area is to be clearly demarcated from the uncovered
               forecourt area, access roads, general parking bays and all other areas to
               clearly delineate the higher contamination risk area from lower risk areas.
          c.   A canopy shall be installed over fuel dispensing areas. The canopy shall
               overhang by a horizontal distance of at least one-quarter of the roof height out
               from the vertical above the boundary of the demarcated fuel dispensing area.
          d.   A liquid-tight dispenser sump is to be installed under each dispensing unit. It is
               to be designed to house all pipework joints and fittings and to collect and
               contain any leak.
          e.   Signage indicating ‘flows to stormwater treatment system’ is to be provided at
               all drainage inlets within the fuel dispensing area.
          f.   The fuel dispensing area is to be graded and drained to an independently
               certified stormwater treatment system listed on Council’s Register for Certified
               Hydrocarbon Separators. The system shall be installed in accordance with the
               approved site-based stormwater quality management plan.
          Submit certification
    77.   Prior to the commencement of the use certification by a suitably qualified person that
          the fuel dispensing area has been constructed and installed in accordance with the
          above requirements must be submitted to Council.
          Uncovered forecourt area
    78.   Prior to the commencement of the use uncovered forecourt areas must be
          constructed and installed in accordance with the following:
          a.   All ground surfaces of the uncovered forecourt area are to be constructed to
               provide a sealed surface, free of gaps or cracks.
          b.   Signage indicating 'flows to stormwater treatment system' is to be provided at
               all drainage inlets in the uncovered forecourt area.




                                                                                  Page 32 of 84
Log in to download the original file

2019-12-10 Planning & Environment Committee Agenda(PDF, 6MB).pdf · 6.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.