PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 DECEMBER 2019
b. Install ‘safe suction’ design for suction piping in compliance with cl 4.3.4 AS
4897. The design, installation and operation of underground petroleum storage
systems.
Submit certification
74. Prior to the commencement of the use certification from a suitably qualified person
that the leak detection system was installed and was verified as meeting the above
leak detection performance standard using the current United States Environmental
Protection Agency (USEPA) protocol must be submitted to Council, or
75. Prior to the commencement of the use certification from a suitably qualified person
that the safe suction design has been installed and tested to comply with cl 4.3.4 AS
4897. The design, installation and operation of underground petroleum storage
systems must be submitted to Council.
Fuel dispensing areas
76. Prior to the commencement of the use fuel dispensing areas shall be constructed and
installed in accordance with the following:
a. All ground surfaces within the fuel dispensing area are to be constructed of
impermeable materials such as waterproofed, reinforced concrete that is free of
gaps and/or cracks. Impermeable, hydrocarbon resistant jointing material is to
be used between treated concrete slabs.
b. The fuel dispensing area is to be clearly demarcated from the uncovered
forecourt area, access roads, general parking bays and all other areas to
clearly delineate the higher contamination risk area from lower risk areas.
c. A canopy shall be installed over fuel dispensing areas. The canopy shall
overhang by a horizontal distance of at least one-quarter of the roof height out
from the vertical above the boundary of the demarcated fuel dispensing area.
d. A liquid-tight dispenser sump is to be installed under each dispensing unit. It is
to be designed to house all pipework joints and fittings and to collect and
contain any leak.
e. Signage indicating ‘flows to stormwater treatment system’ is to be provided at
all drainage inlets within the fuel dispensing area.
f. The fuel dispensing area is to be graded and drained to an independently
certified stormwater treatment system listed on Council’s Register for Certified
Hydrocarbon Separators. The system shall be installed in accordance with the
approved site-based stormwater quality management plan.
Submit certification
77. Prior to the commencement of the use certification by a suitably qualified person that
the fuel dispensing area has been constructed and installed in accordance with the
above requirements must be submitted to Council.
Uncovered forecourt area
78. Prior to the commencement of the use uncovered forecourt areas must be
constructed and installed in accordance with the following:
a. All ground surfaces of the uncovered forecourt area are to be constructed to
provide a sealed surface, free of gaps or cracks.
b. Signage indicating 'flows to stormwater treatment system' is to be provided at
all drainage inlets in the uncovered forecourt area.
Page 32 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.