2019-12-10 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 DECEMBER 2019
Under the draft planning scheme, the site is identified in the District Centre Zone. All of the site is
included within the Mary Street/Thomas Street Health and Wellbeing Precinct. The proposed use
if it were made under the provisions of the draft planning scheme would be an inconsistent use
subject to impact assessment. It is noted that service stations are inconsistent uses throughout
all of the Shire with the exception of Lionel Donovan Drive Auto Precinct.
5. CONSULTATION
5.1. Referral Agencies
The application was not required to be referred to Referral Agencies.
5.2. Other Referrals
The application was forwarded to the following internal Council officers:
Coordinator, Development Engineering;
Coordinator, Environmental Health; and
Environment Officer
The application was also reviewed by external consultants in relation to traffic and water quality.
5.3. Public Notification
The application was publicly notified for at least fifteen (15) business days in accordance with the
Planning Act 2016. Seventeen (17) properly made submissions and Four (4) not properly made
submissions were received. The following table provides a summary and assessment of the
issues raised by submitters.
Matters Raised Comments
Letter of support 20 of the total 21 submissions made were in support of the
application. The proforma submission letter states that the submitter
“regard[s] it as worthy of the community’s backing” and that the
“redevelopment would make a valuable contribution to the local
economy and improve the character of this important corner in
Noosaville”.
Concern relating to amenity of The submitters identify that they are owners of a unit adjacent to the
neighbouring residential premises and raise concerns around the use of the 3m wide
development during construction easement between the subject site and 255 Weyba Rd, Noosaville
during construction. The submitter requests clarification as to what
the builder will do to stop the easement being used during
construction with potential to damage their new fence and the
proximity to the clothes line in the rear courtyard of their property.
The submitter also seeks clarification as to when the 3 metre
acoustic barrier will be installed.
In consideration of the concerns raised in the submission it is
considered that conditioning the development to install the acoustic
barrier after demolition and prior to any further building works
commencing is a reasonable requirement. This will allow noise and
dust to be minimised during the period of construction. While it is
understood that noise may result from the demolition of the existing
premises, the period of time that this will be undertaken would be
far less than the rebuilding phase. Further, the northern boundary of
the site would be more readily accessed for installation of the
acoustic barrier after the existing buildings have been removed.
Page 49 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.