2016-08-15 General Committee Agenda

of 61

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                15 AUGUST 2016


              This issue of how Local Governments have to undertake preparation of LGIPs should
              be no different to the way the State has undertaken preparation and implementation of
              its own State Infrastructure Plan which is identical to an “Interim LGIP amendment”.

              The current LGIP requirement is considered completely contrary the statement on
              Department of Infrastructure, Local Government and Planning website page “BETTER
              PLANNING FOR QUEENSLAND” quote:
                 'We believe that planning reform can deliver a more efficient system that supports
                 investment and jobs, but don't believe this must come at the expense of community
                 participation or the role of local government'.
                 Deputy Premier, Jackie Trad (May 2015)

              For further clarification, justification and backup information that the three aspects
              within the motion proposed were once in the instruments, then removed, and
              subsequently re-imposed, additional details are provided as follows:
              a) Costing of existing assets and catchment demand allocation:
                     Was first required in ICS component of PIP under IPA in September 2004 and
                       carried on through SPA. (Note ICP’s i.e. Noosa’s adopted and implemented
                       CMRNICP did not require existing costing but did require catchment demand
                       allocation across future costs that determined charge rates for future
                       development).
                     Was then removed in 2011 legislative amendment where PIPs no longer
                       required ICS component.
                  Re-imposed in 2014 legislative amendment through Statutory Guideline 03/14.
              b) Third party reviews of draft LGIPs:
                     Was first required in ICS component of PIP where 3 rd party review was
                       undertaken by Queensland Competition Authority (QCA) and paid for by the
                       State Government but it still cost local governments a ton of money through a
                       year of staff time explaining and going through everything in detail with the
                       QCA’s consultants.
                     Was then removed in 2011 legislative amendment where PIPs no longer
                       required ICS component and QCA review. PIP details could then temporarily
                       form part of an local government’s “Adopted Infrastructure Charges Resolution”
                       prior to adopting PIP’s that also no longer required this 3 rd party review
                       (however still required State approval).
                  Re-imposed in 2014 legislative amendment through Statutory Guideline 03/14
                    but this time with the additional cost for local government to additionally engage
                    and pay for the independent reviewer.
              c) Simplifying all LGIP review and approval processes:
                     Pre and post IPA and SPA, infrastructure planning and charging details could
                       be undertaken through PSP’s and their simple process until completion of
                       ICP’s and then PIPs. (PSP’s also continued in force up until the 2011 legislative
                       amendments).
                     ICP process commenced under IPA 1998 and continued through SPA but only
                       with State reviews. PIPs with ICS processes introduced under IPA in
                       September 2004 with QCA review in addition to State review and continued
                       through SPA.
                     PSPs, ICPs and ICSs ceased under 2011 legislative amendment where PIPs
                       no longer required ICS component and PIP details could form part of a local
                       government’s Charges Resolution prior to adopting PIP’s through a simplified
                       process (i.e. without 3rd party review, existing infrastructure costings and
                       network demands etc.). This also made it much easier and quicker for
                       Department’s State review as evidenced by the large number of simplified
                       PIP’s being approved and adopted.



                                                                                      Page 8 of 61
Log in to download the original file

2016-08-15 General Committee Agenda(PDF, 12MB).pdf · 12.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.