Original source · versioned page text
Attachment 4 - Stormwater Managment Plan
The original of this document is very large (17.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSQIDEP Evaluation SPEL Basin, Sippy Downs
Performance Performance Requirement Monitoring action or result Compliance or
Criteria non
compliance
Chemical and As identified in the QAPP. QAPP not sighted. Not applicable
physical to a BOE
analytes application.
Min and max Refer to Table 1 in SQIDEP repeated below: All events where the maximum Compliance.
concentrations individual concentration exceeded
within range Table 1 values was excluded from
the data set and deemed a non
complying event.
The average of TSS, TP and TN
influent values were well within
the maximum averages in Table
1.
Analytical NATA accredited sample handling and analytical methods A suite of analytes was analysed Compliance
methods by ALS Environmental. ALS have
NATA accreditation for their
analytical methods.
Flow Inlet, outlet and bypass, as applicable. Flow recorded at outlet only. Compliance
measurement
location The likely hydraulic retention of
the device is considered small
and therefore it is unlikely to
15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.