Attachment 4 - Stormwater Managment Plan
The original of this document is very large (17.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSQIDEP Evaluation SPEL Basin, Sippy Downs
Performance Performance Requirement Monitoring action or result Compliance or
Criteria non
compliance
retain or detain flows to any
material extent.
Accordingly, the claim does not
include a claim for a volumetric
reduction and so flow monitoring
of the outlet only is acceptable
Precipitation A pluviometer is required A pluviometer was used to Compliance
Measurement monitor rainfall in 0.2mm
increments.
Rainfall 5 minutes or less. Not reported but based on Unknown.
recording reported rainfall hyetographs it
interval appears to report at a high
frequency.
Rainfall <0.25mm 0.2mm adopted. Compliance
recording
increments
Pluviometer To be calibrated twice during the monitoring period. Dr Drapper has signed a statutory Unknown.
calibration declaration stating that the
pluviometer was calibrated
annually by Drapper
Environmental Consultants.
16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.