Attachment 4 - Stormwater Managment Plan

of 90

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (17.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SQIDEP Evaluation                                          SPEL Basin, Sippy Downs


Performance         Performance Requirement                                     Monitoring action or result          Compliance or
Criteria                                                                                                             non
                                                                                                                     compliance

                                                                                cartridge of sorts – both of which
                                                                                would typically be credited with
                                                                                gross pollutant capture. The
                                                                                caveat here is that every
                                                                                installation of SPEL Basin must
                                                                                include a SPEL Sack at the entry
                                                                                pit.

Performance         ER and CRE. If CRE average and median > 10% difference      Both ER and average CRE was          Compliance.
Indicators          inspect dataset.                                            reported. The evaluators
                                                                                determined the median CRE and
                                                                                found median CRE aligned very
                                                                                closely with ER and the difference
                                                                                was less than 10%. The
                                                                                difference between ER and
                                                                                average CRE was found to be >
                                                                                10%. It was agreed with the
                                                                                Applicant that an average of ER
                                                                                and average CRE would be
                                                                                adopted as a conservative
                                                                                approach that enables both
                                                                                metrics to be used and gives
                                                                                them equal weighting. We note
                                                                                that adoption of average CRE in
                                                                                lieu of median CRE reduced the



                                                                                                                                   18
Log in to download the original file

Attachment 4 - Stormwater Managment Plan.pdf · 17.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.