Log in to see the plans as drawnSQIDEP Evaluation SPEL Basin, Sippy Downs
Performance Performance Requirement Monitoring action or result Compliance or
Criteria non
compliance
Performance The target pollutants and testing rationale must be described in the QAPP was not submitted as part Compliance.
Indicators QAPP and Detailed Performance Report. of the application.
Claiming TSS, TP and TN and
Gross Pollutant reductions. TSS,
TP and TN were measured. The
initial claim included
hydrocarbons by inference
however these were not tested
and it was agreed to remove
these from the claim.
Gross pollutants were not
specifically measured however it
is considered that gross pollutants
are solids with a particle size
greater than 3mm and which
could not physically flow through
the device. It is noted that a
floatable gross pollutant may
become buoyant and flow out of
the system during extreme high
flow bypass events. However the
gross pollutant claim is
considered justifiable on the basis
of the nature of the device which
includes a littler basket and filter
17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.