Original source · versioned page text
Attachment 4 - Stormwater Managment Plan
The original of this document is very large (17.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4. STORMWATER MANAGAMENT
A holistic site approach has been adopted for the design of the stormwater, stormwater
harvesting and on-site retention use (via the car washing process), stormwater quality treatment
and site stormwater discharge.
A Commercial Car Wash use is a rare use that can use a lot of mains water if not designed
correctly. However, it is because of this water demand that it also has the ability to make great
use of any captured rainwater (ie: harvested and retained stormwater) and draw down on this
stored water quickly which maximises the chances of the underground retention tanks being
able to store the design storm event volume effectively with a small chance of overflow even for
the largest of storm events.
The overall site will have the stormwater comply with the following requirements:
1. Noosa Shire Council- Noosa Plan 2020 requirements and standard drawings,
2. Queensland Urban Drainage Manual (QDUM),
3. Department of Transport and Main Roads Road Drainage manual,
4. AS/NZS 3500.3 – Plumbing and Drainage, Part 3: Stormwater Drainage.
Refer to the attached plan, Sh: C1- which depicts the Preliminary Stormwater Layout Plan. This
plan clearly shows the locations of the proposed down pipes from the roofed areas, their
connection into the underground storage retention tanks, all driveway stormwater pits and
associated pipework, the water quality treatment device and connection into the existing
stormwater pipe or stormwater pit (TBC with Council).
4.1. PRE/POST DEVELOPED SITE RUN-OFF CO-EFFICIENTS
The subject site has an overall site area of 2,014 M2.
The overall area of the developed site will be reduced by a 2.0 M width along the northern
boundary due to the requested road widening on Diamond Lane. This area of 80.4 M2 shall be
deducted from the effective site area.
There is a 2.0M wide footpath area between the Super Bays and the adjoining property (Bowls
Club) to the east of the site which totals 96.6 M2. This area shall also be deducted from the
effective site area.
This yields an effective overall site area of 1,837 M2 that shall be designed for.
The pre-existing motel, cabins and bitumen impermeable areas occupied 1,414 M2 of the
effective site area (ie: only the impermeable areas inside the effective site area have been
included). This yields an existing overall site impermeable coverage of 77%. This would result in
a pre-existing site run-off co-efficient of 0.85 over an effective area of 1,837 M2.
The post-developed site has a total of 800 M2 of roofed area being directly connected into the 2
No. 20,000 L underground Retention tanks for re-use onsite. These tanks have been oversized to
cater for the 1% EAP design storm event, these tanks will not contribute to the overall site
stormwater discharge. Hence, this roofed area has been removed from the overall site run-off
co-efficient calculation. Other areas include; non-roofed landscaped areas total of 199 M2, there
is 24 M2 of roofed area that does not connect into the Retention tanks, and driveway/paved non-
roofed impermeable areas total 814 M2. This results in a post-development site run-off co-
efficient of 0.49 over the effective area of 1,837 M2.
This fact alone assures that the post-developed site will have a greatly reduced overall site
stormwater volume and peak flow discharge than the pre-developed site.
-6-
TMC Building Design Group
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.