ORDINARY MEETING AGENDA                                                              17 NOVEMBER 2022


          23.24.      The mooring facility must not be utilised for live-aboard purposes.
          24.25.   Any construction and post construction activity must not to impact on the
               condition of the waterway and is to be conducted so as not to breach the
               Environmental Protection Act EPA (1994) and the Environmental Protection
               (Water) Policy 2009.
          25.26.     Certification by a Registered Professional Engineer of Queensland that states
               that the jetty extension and pontoons are constructed in accordance with best
               practice methods and are structurally sound must be submitted to Council. This
               certification must be submitted to Council within three (3) months of the completion
               of the works. A final inspection and approval of the structure by Council’s Inspector
               is also required. Please contact Council’s Planning Assessment Section to
               arrange the inspection.
          26.27.   After completion, the proposed works must be maintained in a sound state of
               repair in accordance with the approved plans.
          27.28.   All necessary State government approvals relating to this development must
               be obtained prior to any works commencing on the site.
          Environment
          28.29.    To ensure the safety of persons accessing the approved works and to prevent
               environmental harm, a safety audit of the on-site fuel storage tanks, bowsers and
               associate pipework, valves, vents and systems shall be conducted by a suitably
               qualified professional and submitted to Council for approval prior to the use of the
               new works (pontoon/jetty extensions). The audit shall demonstrate that the fuel
               systems are in a safe and serviceable condition or, where necessary, identify repair
               and rectification requirements to meet the relevant Australian Standards and
               industry best practice environmental management. Any repair works must be
               completed, with certification submitted by the auditor to Council, prior to the use of
               the new works (pontoon/jetty extensions).
    B.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
    REASONS TO JUSTIFY THE DECISION DESPITE THE CONFLICT WITH THE PLANNING
    SCHEME:
    Find the following matters relevant to the assessment and sufficient reason to approve the
    application:
    1.    Although there is a proposed net increase of pontoons which increases site cover within
          the lease area, the proposal:
          a.     will ensure the vessels are moored wholly within the existing lease area of the
                 marine facility; and
          b.     maintains the character of the site as a marine facility which is compatible with
                 surrounding marine activities.




2   INTEGRATED WATER QUALITY MONITORING PROGRAM
    I, Cr Stockwell, declare that I have a prescribed conflict of interest in the matter as follows: Seqwater
    was a major client of my sole trader business (t/a Watershed Australia). Between 2016 and 2020, I
    undertook: catchment planning; land capability and suitability assessments for source protection,
    recreation, grazing, infrastructure, environmental offsets and solar farms; environmental and natural
    resource evaluation, and 'Expert Witness' services in a court case, for the entity. This involved contracts
    to the value of $232,266. This work has covered the vast majority of the Seqwater estate throughout
    South East Queensland including the Seqwater Lake Macdonald estate, where the water treatment plant
    is located.

                                                                                              Page 15 of 19
Log in to download the original file

2022-11-17 Ordinary Meeting Agenda(PDF, 704KB).pdf · 721 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.