RFI - stormwater report
3.1.2 Site Rational Method Validation (A01)
The WBNM model has been validated to the Rational Method derived peak flows at the
outlet of the catchment (WBNM catchment node ‘Outlet’). Validation has been achieved
by the catchment lag parameter.
A summary of the Rational Method calculation is provided below in Table 3-2 and
additional details of the Rational Method calculation are provided in Appendix 2 of this
report. Time of concentration was obtained from Table 4.6.3 of QUDM (Recommended
roof drainage travel times). The C10 value was obtained from Table 4.5.3 of QUDM and
the site was determined to be 5% impervious with I10 rainfall intensity between 60-64
mm/hr.
Table 3-2: Site Rational Method Validation Summary (A01)
Parameter Value
Time of Concentration (tc) 6 minutes
Catchment Area 1.256 hectares
C10 Value 0.59
A comparison of peak Rational Method flow rates compared with peak WBNM model
flow rates are provided in Table 3-3 below.
Table 3-3: Site Existing Rational Method Peak Flows Versus WBNM Peak Flows (A01)
1yr ARI 2yr ARI 5yr ARI 10yr ARI 20yr ARI 50yr ARI 100yr ARI
Catchment
(m3/s) (m3/s) (m3/s (m3/s) (m3/s) (m3/s) (m3/s)
Rational 0.173 0.207 0.311 0.383 0.459 0.583 0.670
WBNM 0.198 0.228 0.319 0.382 0.441 0.513 0.569
% Difference 14.4% 10.3% 2.5% -0.3% -3.8% -11.9% -15.1%
The above results show that a reasonable peak flow validation has been achieved from
the WBNM model when compared to a Rational Method calculation and is considered
acceptable in assessing non-increasing in nuisance flooding from stormwater flows.
3.1.3 Site Developed Scenario
The proposed development has been incorporated into the WBNM model by adjusting
the site sub-catchments and the fractions impervious values to represent the
development. The catchment is represent by the surface contours and the existing
discharge locations. Fraction impervious values of the existing and proposed scenarios
are provided in Table 3-4 below. The impervious percentage of the new development
has been calculated from the layout and represented as 48% impervious for catchment
A01.
Table 3-4: WBNM Sub-Catchment Fraction Impervious Values – Site Developed Scenario
Existing Scenario Developed Scenario
WBNM Sub-Catchment Area (ha)
Impervious (%) Impervious (%)
A01 1.256 5 48
TOTAL 1.256
12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - stormwater report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.