RFI - stormwater report
Peak flows tabulated in this report represent the peak values extracted from the
modelled range of storm events presented in Table 3-5 (A01).
Table 3-5: Site Developed Scenario WBNM Outlet Peak Flows (A01)
Existing Peak Flow Developed Peak Flow Change in Peak Flow
(m3/s) (m3/s) (m3/s)
1 year 0.198 0.254 0.056
2 year 0.228 0.289 0.061
5 year 0.319 0.398 0.079
10 year 0.382 0.484 0.101
20 year 0.441 0.554 0.113
50 year 0.513 0.628 0.115
100 year 0.569 0.693 0.124
It can be seen that the peak flows have increased to the catchment A01 outlet. This is a
result of the development site increasing the impervious area. It is proposed that the
outlet from the site will be diverted (piped) to the natural waterway approximately 100m
south of the developed site (Refer Figure 3-2 and Figure 3-4). The piped outlet will divert
the change in peak flow from the proposed site (up to 124L/s) in order to prevent
nuisance runoff from affecting downstream private properties and the road reserve.
The change in peak flow diverted from the site has been assessed in relation to the
regional catchment, refer to Sections 3.1.4 and 3.1.6 below.
Catchment
A01
Piped
Outlet
Diversion
Figure 3-2: Post-Development Change in Peak Flow Diversion
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - stormwater report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.