Original source · versioned page text
RFI - stormwater report
Executive Summary AquaIntel Pty Ltd was commissioned by Tod Consulting Pty Ltd to prepare a Stormwater Management Plan to support the Reconfiguration of Lot Approval for proposed residential use (10 Lots) at 30 Pottery Street, Pomona (Lot 496 MCH 591). The site is currently undeveloped and is consistent with a rural residential area with the existing lot having a dwelling, shed and most of the site is vegetated with trees. The site is formed by a ridge to the north and falls south to the adjoining properties and Pottery Street to the east. Environmental best management practices are proposed for treatment of stormwater flowing from the site. Stormwater will pass through a treatment device prior to discharge to the receiving environment. The stormwater treatment strategy for the site will include collection of runoff from roofed, roads and allotted areas being treated via a single bioretention basin located at the south-east corner of the site. It is proposed that the outlet from the site will be diverted (piped) to the natural waterway approximately 100m south of the developed site. The piped outlet will divert the change in peak flow from the proposed site in order to prevent nuisance runoff from affecting downstream private properties and the road reserve. No nuisance flooding has been has been demonstrated, as differences in peak flow times in the regional sub-catchments do not coincide to create a significant change in peak flow associated with the change in impervious characteristics from the developed site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - stormwater report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.