Original source · versioned page text
RFI - stormwater report
Contents EXECUTIVE SUMMARY I 1 INTRODUCTION 4 1.1 SITE CHARACTERISTICS 4 2 STORMWATER QUALITY 6 2.1 DESIGN OBJECTIVES 6 2.2 STORMWATER QUALITY TREATMENT 6 2.2.1 STRATEGY 6 2.3 MODELLING APPROACH 6 2.3.1 MUSIC PARAMETERS 6 2.3.2 CATCHMENT AREAS 7 2.3.3 MUSIC MODEL LAYOUT 8 2.4 TREATMENT MEASURES 9 2.4.1 BIORETENTION SYSTEM 9 2.5 RESULTS 10 3 STORMWATER QUANTITY 11 3.1.1 SITE EXISTING SCENARIO 11 3.1.2 SITE RATIONAL METHOD VALIDATION (A01) 12 3.1.3 SITE DEVELOPED SCENARIO 12 3.1.4 REGIONAL EXISTING SCENARIO 14 3.1.5 REGIONAL RATIONAL METHOD VALIDATION (C1 OUTLET) 14 3.1.6 REGIONAL DEVELOPED SCENARIO 15 3.1.7 LAWFUL POINT OF DISCHARGE 16 4 CONSTRUCTION PHASE MANAGEMENT 17 4.1 EROSION AND SEDIMENT CONTROL 17 5 ESTABLISHMENT AND OPERATIONAL PHASE MANAGEMENT 18 5.1 ESTABLISHMENT 18 5.2 OPERATIONAL 18 6 CONCLUSIONS 19 7 REFERENCES 20 APPENDICIES Appendix 1: Site Layout 21 Appendix 2: Site Rational Method and WBNM Outputs 22 Appendix 3: Regional Rational Method and WBNM Outputs 23 FIGURES Figure 1-1: Locality Plan 5 Figure 1-2: Flood Hazard Overlay Map 5 Figure 2-1: WSUD Catchment and Locality Plan 8 Figure 2-2: MUSIC Model Layout 8 Figure 3-1: Existing WBNM Site Catchment Plan 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - stormwater report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.