Original source · versioned page text
RFI - stormwater report
Figure 3-2: Post-Development Change in Peak Flow Diversion 13
Figure 3-3: Existing WBNM Regional Catchment Plan 14
Figure 3-4: Lawful Point of Discharge (Source, Noosa Intramaps 2020) 16
TABLES
Table 2-1: Site stormwater quality objectives (operational phase) 6
Table 2-2: MUSIC Base and Storm Flow Concentration Parameters – Urban 7
Table 2-3: MUSIC Runoff Generation Parameters – Urban 7
Table 2-4: Catchment Areas 7
Table 2-5: Bioretention Design Parameters 9
Table 2-6: MUSIC Results – Load-Based Pollutant Outputs 10
Table 3-1: WBNM Sub-Catchment Fraction Impervious Values – Site Existing Scenario 11
Table 3-2: Site Rational Method Validation Summary (A01) 12
Table 3-3: Site Existing Rational Method Peak Flows Versus WBNM Peak Flows (A01) 12
Table 3-4: WBNM Sub-Catchment Fraction Impervious Values – Site Developed Scenario12
Table 3-5: Site Developed Scenario WBNM Outlet Peak Flows (A01) 13
Table 3-6: WBNM Sub-Catchment Fraction Impervious Values – Regional Existing Scenario
14
Table 3-7: Regional Rational Method Validation Summary (C1 Outlet) 15
Table 3-8: Regional Existing Rational Method Peak Flows Versus WBNM Peak Flows (C1
Outlet) 15
Table 3-9: WBNM Sub-Catchment Fraction Impervious Values – Regional Developed
Scenario 15
Table 3-10: Regional Developed Scenario WBNM Outlet Peak Flows (A3) 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - stormwater report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.