                          AGENDA


   Services & Organisation
     Committee Meeting


                   Tuesday, 8 May 2018


                    commencing at 1.30pm
            Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Joe Jurisevic (Chair), Frank Pardon, Tony Wellington, Frank Wilkie




                      “Noosa Shire – different by nature”
Log in to download the original file

2018-05-08 Services & Organisation Committee Agenda(PDF, 7MB).pdf · 7.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 85 (of 107)

Section 2

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                    8 MAY 2018


TABLE OF CONTENTS

ITEM                                                                    PAGE

ATTENDANCE & APOLOGIES                                                       -

PRESENTATIONS                                                                -

REPORTS FOR CONSIDERATION OF THE COMMITTEE                                  3

1      1718T045 CRUSHING TENDER ACCEPTANCE                                   3

2      RESOURCE RECOVERY AUSTRALIA PTY LTD - VARIATION TO LICENCE
       1718T054 "REUSABLE GOODS, RECYCLING AND SALES FACILITY" AT
       EUMUNDI ROAD                                                          9

3      NOOSA CULTURAL PLAN - DRAFT FOR PUBLIC CONSULTATION                  14

4      TOURISM NOOSA 2018-19 SPONSORED EVENTS - TEMPORARY PERMIT
       APPROVALS                                                            19

5      COUNCILLORS' EXPENSES REIMBURSEMENT POLICY UPDATE                    22

6      LOCAL LAWS DELEGATION OF AUTHORITY                                   30

7      CERTIFIED AGREEMENT NEGOTIATION PROCESS                              34

REPORTS FOR NOTING BY THE COMMITTEE                                        37

8      NOOSA SPIT FORESHORE EROSION UPDATE                                  37

9      SIX MILE CREEK FLOOD STUDY COMPLETION                                42

10     OPERATIONAL PLAN PROGRESS REPORT - 3RD QUARTER 2017-18               46

11     COMMUNITY SERVICES DEPARTMENT UPDATE - 3RD QUARTER 2017-18           60

12     CORPORATE SERVICES DEPARTMENT UPDATE - 3RD QUARTER 2017-18           83

13     EXECUTIVE SERVICES DEPARTMENT UPDATE - 3RD QUARTER 2017-18           91

14     INFRASTRUCTURE SERVICES DEPARTMENT UPDATE - 3RD QUARTER 2017-
       18                                                                   99

CLOSED SESSION                                                         -




                                                                Page 2 of 107

Section 3

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                         8 MAY 2018



REPORTS FOR CONSIDERATION OF THE COMMITTEE
1                        1718T045 CRUSHING TENDER ACCEPTANCE
DOCUMENT INFORM AT ION




Author                              Civil Operations Technical Officer, Cameron Shields
                                    Infrastructure Services Department

Index                               ECM/ Project and Contract/ 1718T045 Noosa Council Crushing
                                    ECM/ Subject/ Contracting/ Tenders

Attachments                         1.    1718T045 – Quarry – Final Evaluation Summary
                                    2.    1718T045 – Landfill – Final Evaluation Summary


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Civil Operations Technical Officer to the Services and
Organisation Committee Meeting dated 8 May 2018, and:
A.                       Award tender 1718T045 Crushing to the following contractors:
                         i.    Portion A – Ringtail Creek Quarry: Rosenlund Contractors Pty Ltd.
                         ii.   Portion B – Eumundi Road Landfill: Rosenlund Contractors Pty Ltd.
B.                       Award the Contract for an initial term of up to three (3) years, with an option to extend for
                         two (2) further periods of up to twelve (12) months each. The option to extend will be at
                         Council’s own discretion and subject to the Contractor’s ability to meet the requirements
                         under the Contract.



REPORT
Crushing is a key part to operations at the Council owned and operated Ringtail Creek Quarry
and Eumundi Landfill Sites.

At Ringtail Creek Quarry, virgin quarry materials and waste from construction and maintenance
projects are crushed and then used on a variety of Council projects.

At the Eumundi Road Landfill, crushing is required to process all concrete waste resulting from
construction and demolition activities from around the Shire. Processed material is sold to the
public as a source of revenue or used on site for various projects.

1.                       Tender Process

The tender was advertised on LG Tenderbox on 15 February 2018 with a closing date of 15
March 2018. The tender was also advertised in the Sunshine Coast Daily on 17 February 2018.
The tender consisted of two separable portions as shown below:
i.                       Portion A – Ringtail Creek Quarry;
ii.                      Portion B – Eumundi Road Landfill.



                                                                                                       Page 3 of 107

Section 4

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       8 MAY 2018


An industry site briefing was held on 22 February 2018 at both sites to provide an overview of the
contract and contractors were invited to ask questions. All questions and answers were noted
and uploaded to LG Tenderbox the day after as a Pre Tender Box Close - Notice to Tenderers.

2.   Tender Assessment

The tender evaluation panel carried out an assessment of the three conforming tender
submissions from:
1)   Rosenlund Contractors Pty Ltd;
2)   Terragon Mobile Crushing; and
3)   Wagners Quarries Pty Ltd.

The three conforming tenders all tendered on portion A of the contract and tenderers 1 & 2
(above) tendered on portion B.

The tenders were then evaluated using the following criteria:
    Capability and Resourcing
    Contract Experience & Capacity
    Methodology
    Quality
    Safety
    Environment & Sustainability
    Contribution to Local Economy
    Price

The evaluation methodology considered non-price elements (65% of the score) and a price
component (35% of the score).

3.   Portion A – Ringtail Creek Quarry

Portion A relates to crushing activities at Ringtail Creek Quarry. These activities include crushing
of shot rock and construction and demolition waste concrete and the screening of top soil and
sand.

Three conforming tenders were evaluated for Portion A of the contract; Rosenlund Contractors
Pty Ltd, Terragon Mobile Crushing and Wagners Quarries Pty Ltd.

Rosenlund Contractors demonstrated as the most advantageous tender to Council, with
Terragon Mobile Crushing scoring the second highest during the evaluation process.

The total cost was calculated based on last financial year’s quantities and applying the
respondent’s tendered unit rates accordingly, to determine a total/overall cost, as recorded in
Attachment 1. Rosenlund Contractors provided pricing was considered most advantageous to
Council, followed closely by Terragon Mobile Crushing and then Wagners Quarries who had
large mobilisation costs.

All three tenderers demonstrated they are capable of undertaking the works and provided
satisfactory methodologies. All tenderers demonstrated they had experience undertaking similar
projects however Wagner’s Quarries experience is mainly with private contractors and not Local
Government.

Both Rosenlund Contractors and Wagners Quarries provided good responses in regards to
Quality, Health and Safety whilst Terragon Mobile Crushing provided brief information in this
regard.

                                                                                     Page 4 of 107

Section 5

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                        8 MAY 2018


Additionally, Rosenlund Contractors and Wagners Quarries have ISO accreditations in these
areas whereas Terragon Mobile Crushing does not.

Rosenlund Contractors is recommended as the preferred contractor for Portion A.

4.    Portion B – Eumundi Road Landfill

Portion B relates to construction and demolition concrete waste crushing at Eumundi Road
Landfill.

Two conforming tenders were evaluated for Portion B of the contract; Rosenlund Contracts Pty
Ltd and Terragon Mobile Crushing.

The total cost was calculated based on an expected forecast of 10,000m3 of processed material
per year and applying the respondent’s tendered unit rates accordingly, to determine a
total/overall cost, as recorded in Attachment 2. As a result, Rosenlund Contractors pricing was
considered most advantageous to Council by a considerable margin.

Both tenderers demonstrated they have the capacity, experience and required plant to carry out
the works. Satisfactory methodologies were included in both tenderers submissions.

Rosenlund Contractors provided a very good response in regard to Quality, Safety and
Environment categories as their submission included in depth supporting documents and
management plans, whereas the supporting documents in Terragon Mobile Crushing’s
submission provided brief information only in this regard. Rosenlund Contractors are also ISO
accredited for these three elements.

Rosenlund Contractors is recommended as the preferred contractor for Portion B.

5.    Scheduling

When the contract is awarded, the supervisor of each site will organise the crushing works once
there is a suitable build-up of material to process.

Finance & Risk

Based on the historical data and future estimates, the total cost over the first year is $185,859 for
the Quarry portion and $154,000 for the Landfill portion.

As this contract is a schedule of rates and there is no minimum workload requirement i.e.
services will be provided on an ‘as required’ basis, there is low risk of exceeding future budgeted
amounts provided the expenditure for these works is properly monitored.

Consultation

External Consultation - Community & Stakeholder

Council held an industry briefing on 22 February 2018 to all interested contractors.

Internal Consultation

Waste Management, Finance, Procurement and Civil Operations.




                                                                                       Page 5 of 107

Section 6

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             8 MAY 2018


Departments/Sections Consulted:

   Chief Executive Officer   X    Community Services                      X   Corporate Services
   Executive Officer              Director                                    Director
   Executive Support              Community Development                   X   Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                   X   Procurement & Fleet
                                  Local Laws                                  Property
                             X    Waste & Environmental Health                Revenue Services

   Executive Services             Environment & Sustainable Development   X   Infrastructure Services
   Director                       Director                                X   Director
   Community Engagement           Building & Plumbing Services                Asset Management
   Customer Service               Development Assessment                      Buildings and Facilities
   Governance                     Economic Development                    X   Civil Operations
   People and Culture             Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                           Page 6 of 107

Section 7

ATTACHMENT 1




    Page 7 of 107

NOOSA SHIRE COUNCIL                    Weighted Attribute Evaluation Spreadsheet - Final Evaluation
              Contract Title:              Noosa Council Crushing - QUARRY                                                                                                                                                                     A T T ACH M ENT 1

    NAME OF TENDERER                                                    PRICE
    (Conforming Tenders Only)                                       (excl of GST)
1   |Rosenlund Contractors                                                   $185,859
2   |Terragon Mobile Crushing                                                $197,554
3   |Wagners Pty Ltd                                                         $314,891
Co            eae                    es                   ee
Cg   RS a ae ee                        LOE ey le CO            |             eos]
6 (SR                        a                        een       Po Me eSaNE |
7 [SEARS ae TT ee CE eS                                      |! ST
3s [SFR       St ae                                   NE Ds.               eRe
Cy   a eee ee a                                               |
10 [TisigS     cnt, oe eee eee PT                                            vee
    NON-CONFORMING TENDERS

                                                                           1                    2                     3                     4                    5                   6                    7                    8                    9                   10

                                                                            Resultant              Resultant            Resultant            Resultant            Resultant            Resultant            Resultant            Resultant           | Resultant           Resultant
    Evaluation Criteria                        Weighting (%)      Score       score x               score x              score X               score x   Score      score x  Score      score x   Score      score x   Score      score x              score x   Score      score x
                                                                            weighting             weighting             weighting            weighting            weighting            weighting           weighting            weighting            weighting            weighting

    Total Fees (Pc)                                 35%                $185,859              $197,554              $314,891                 $o                  $0                   $o                   $o                   $0   :               $0                  $0
    Average Fees (Pav) $......sscesseceseeseneene $232,768
    Price Score                                                           120                   115                   65                    0                    0                    0                   0                    0                    0                    0
    Normalised Price Score (Pn)                                           100                   96                    54                    0                    0                    0                   0                    0                    0                    0
    Weighted Price Score (Pw)                                                                  33.54

                          Assessment Panel                                           Position Title                                                                                                          p 7                 \)
                                                                                                         :                                    The Contract Administrator confirms the above scores            x
          Contract Administrator & Assesment Panel Member 1              Cameron Shields - Technical Coordinator                                       and weightings of this evaluation                       \/ \          0
                      Assesment Panel Member 2                          Rob Walsh - Waste Management Supervisor
                      Assesment Panel Member 3                               Keith Gravett - Quarry Supervisor                                      Contract Administrator's signature:                       Cameron Shields - Technical Coordinator                             ‘
                      Assesment Panel Member 4                      Peter Robinson - Workplace Health & Safety Advisor
                      Assesment Panel Member 5                             James Santifort - Engineering Trainee

                                                                                                                                                                                                                                                            Page 7 of 107

Section 8

ATTACHMENT 2




  Page 8 of 107

NOOSA SHIRE COUNCIL                     Weighted Attribute Evaluation Spreadsheet - Final Evaluation
              Contract Title:               Noosa Council Crushing - LANDFILL                                                                                                                                                                         ATTAC H M E NT 2

    NAME OF TENDERER                                                     PRICE
    (Conforming Tenders Only)                                        (excl of GST)
1   |Rosenlund Contractors                                                    $154,500)
2.  |Terragon Mobile Crushing                                                 $194,750
3 [Fai ES LS ce                                               [oe a i re]
4 |e ee) Te ee                                                     er
5: [ae ae a        NE oe                        ae
LW                                                             |
7 | BEE Taree RS ee                                                                  |
8 |G            SE                        ae Se
9 [Axe      Sah Oe       Ne |                    os
10 [55855 Rite aces se TR]
    NON-CONFORMING TENDERS                                                                                                                                   2

                                                                           1                     2                      3                    4                    5                    6                    x                    8                    9                    10
                                                                                              Crushing
                                                                             Resultant             Resultant              Resultant            Resultant            Resultant            Resultant            Resultant            Resultant             Resultant           Resultant
    Evaluation Criteria                         Weighting (%)      Score      score X    Score       score x               score x    Score     score x    Score     score x    Score     score x    Score     score x    Score     score x              score x    Score     score x
                                                                             weighting             weighting             weighting             weighting           weighting            weighting            weighting            weighting             weighting            weighting

                                                                                          Te
                                                                                              Crushing
    Total Fees (Pc)                                  35%                $154,500              $194,750                 $o                    $0                   $o                   $o                   $o                   so    .              $0                   $0
    Average Fees (Pav) $....c.cccsscsssssesesees  $174,625
    Price Score                                                            112                   88                     0                     0                   0                    0                    0                    0                    0                    0
    Normalised Price Score (Pn)                                     :      100                   79                     0                     0                   0                    0                    0                    0                    0                    0
    Weighted Price Score (Pw)                                                 0

                          Assessment Panel                                             Position Title                                                                                                                     Ki )
                                                                                                          ,                                     The Contract Administrator confirms the above scores                      Ly             \)
          Contract Administrator & Assesment Panel Member 1               Cameron Shields - Technical Coordinator                                        and weightings of this evaluation                                NVQ
                      Assesment Panel Member 2                          Rob Walsh - Waste Management Supervisor
                      Assesment Panel Member 3                               Keith Gravett - Quarry Supervisor                                       Contract Administrator's signature:                        Cameron Shields - Technical Coordinator
                      Assesment Panel Member 4                       Peter Robinson - Workplace Health & Safety Advisor
                      Assesment Panel Member 5                              James Santifort - Engineering Trainee
                                                                                                                                                                                                                                                             Page 8 of 107

Section 9

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      8 MAY 2018



2    RESOURCE RECOVERY AUSTRALIA PTY LTD - VARIATION TO LICENCE 1718T054
     "REUSABLE GOODS, RECYCLING AND SALES FACILITY" AT EUMUNDI ROAD
Author           Manager Waste and Environmental Health, Wayne Schafer
                 Community Services Department

Index            ECM/ Subject/ Waste – Recycling/ Contract 1718T054

Attachments      Nil


EXECUTIVE SUMMARY
Council awarded tender 1718T054 and agreed to issue a license to Resource Recovery Australia
Pty Ltd (RRA) on 15 February 2018 to operate the Reusable Goods, Recycling and Sales Facility
at Eumundi Road. Following Council’s approval to issue the licence:
     Endeavour who currently provide relief staff services at the weighbridge and rural transfer
       stations have indicated they do not wish to renew their agreement to provide those
       services; and
     RRA have sought negotiations with Council to provide mattress recycling including foam
       recycling which was mentioned in their tender, but not finalised at the time Council
       approved their licence.
It is now proposed to enter into a contractual arrangement for RRA to provide relief staff services
and mattress processing aligned to the term of their seven year licence. However, as the
proposed payment to RRA for the provision of both relief staffing services and recycling
mattresses constitutes a ‘large sized contract’ it is necessary to gain separate Council approval

This report proposes that Council consider and resolve under Section 235 (a) and (b) of the Local
Government Regulation 2012 that the provision of relief staffing services and mattress recycling
be provided by RRA.

RECOMMENDATION
That Council note the report by the Manager Waste and Environmental Health to the Services &
Organisation Committee Meeting dated 8 May 2018 and:
A.   Pursuant to section 235(a) of the Local Government Regulation 2012 agree to enter into a
     large-sized contractual arrangement with Resource Recovery Australia Pty Ltd for the
     supply of trained relief staff at the Eumundi Rd weighbridge, Cooroy and Pomona Transfer
     stations when permanent weighbridge and transfer station staff employed are on annual
     leave, sick leave and their lunch break without first inviting written tenders as Council is
     satisfied that they are the only supplier who are reasonably available;
B.   Pursuant to section 235(b) of the Local Government Regulation 2012 agree to vary the
     licence arrangement with Resource Recovery Australia Pty Ltd to include mattress
     processing without first inviting written tenders as this is a specialised recycling service
     which Resource Recovery Australia Pty Ltd offered to undertake in their original tender
     proposal;
C.   Authorise the CEO to enter into a contract with Resource Recovery Australia Pty Ltd to
     provide trained relief staff at the Eumundi Rd weighbridge, Cooroy and Pomona Transfer
     stations when permanent weighbridge and transfer station staff employed by Council are
     on annual leave, sick leave and their lunch break; and
D.   Authorise the CEO to vary the processing and recycling of mattresses and recycling of
     foam and useful cloth material as a variation to Resource Recovery Australia Pty Ltd’s
     license 1718T054.

                                                                                    Page 9 of 107

Section 10

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                        8 MAY 2018


REPORT
This report recommends an agreement to provide relief staff for the Eumundi Road weighbridge,
Cooroy and Pomona waste transfer stations and a variation to license 1718T054 issued to
Resource Recovery Australia Pty Ltd to include processing of mattresses, subject to Council
resolving that the services be exempted from tendering under the provisions of section 235 of the
Local Government Regulation 2012.

1.    Relief Staffing for Transfer Stations at Eumundi Road, Cooroy and Pomona

Two Council staff members operate the weighbridge 10 hours per day, 7 days per week under a
Local Area Work Agreement (LAWA), working 4 days on and 4 days off. The LAWA provides that
they must have at least a half hour lunch break in their 10 hour shift.

A number of trained relief staff need to be available at short notice (who are trained in the use of
the ‘wasteman software’ at the facilities) to ensure these public waste disposal facilities continue
operating without impact on the community. RRA is well suited to provide these services as they
provide similar services in other locations in Australia.

Endeavour have been operating the Cooroy Transfer Station under contract and provided a
trained weighbridge operator to relieve at the weighbridge and the Pomona facility. Endeavour
wish to withdraw from this service as it no longer fits their service model. In the interim staff have
arranged for Cooroy to be operated by a casual employee who operated the site previously.

2.    Mattress Processing at Eumundi Road Transfer Station

Over the past few years Noosa Community Training Centre (NCTC) trading as Briteside
Industries, undertook a trial of spring mattress recycling using a staff member who processed
about 2,500 spring mattress per annum for a set payment per mattress. Foam mattress were not
processed and are currently sent to landfill. At 1 June 2018, when Briteside leave the site Council
would like to continue processing mattresses so they are not landfilled.

In their tender submission, RRA were the only tenderer who indicated that they could process
foam mattresses including bailing of foam and reuse of covering cloth material, but details of how
this could be achieved or whether the operation would be transferred to Cleanaway had not been
resolved at the time of awarding the licence. Subsequent discussions with Cleanaway have
indicated that they would prefer not to undertake this activity.

Negotiations with RRA about recycling mattresses have now been completed and an opportunity
exists for Council to offer mattress processing to RRA for a set price per mattress, allowing them
to bail and sell foam. This is a significant improvement on our current recycling activities where
foam and covering materials from spring mattresses and complete foam mattresses are
landfilled.

3.    Proposed way forward

It is proposed to enter into a contract with RRA to provide trained staff to relieve:
      2 weighbridge staff when they take their four weeks annual leave each year;
      Cooroy and Pomona Transfer Station staff taking annual leave;
      Weighbridge and transfer station staff on sick leave;
      Weighbridge staff for their half hour lunch break; and
      During periods when Council staff at the weighbridge or rural transfer stations are absent
        on sick leave.




                                                                                     Page 10 of 107

Section 11

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         8 MAY 2018


It is also proposed that the license approved by Council and issued to RRA be varied to include:
      A requirement for RRA to undertake mattress processing, including recovery for reuse of
        foam and any useful cloth material.

4.    Procurement Implications

The license issued by Council did not contain any payment to RRA at the time it was approved.

The value of the proposed new relief staff contract ($350,000) and variations to the license to
have RRA undertake mattress recycling ($262,500) over the seven year period both constitute a
“large sized contract” and under Council’s standard procurement practices should go to tender.

In this instance, Council staff believe that tendering the services is not practical nor cost effective
under the circumstances, based on the following:
     Employing Agency or casual staff to relieve Council’s weighbridge operators for a half an
       hour lunch break at Eumundi Road Landfill would require a three hour call out fee whereas
       RRA staff will be simply able to walk across to the weighbridge as part of their normal
       duties;
     More than 1 trained person able to use the wasteman software needs to be available for
       relief at short notice – i.e. sick leave. Employing a casual or range of casuals and paying
       them to be on standby to ensure they are available is impractical;
     Operating the weighbridge software used at all sites is complex and takes significant
       training and refresher training if not used regularly;
     Mattress processing provided by RRA includes WH&S supervision and other onsite
       supervision, not available if another tenderer were to take on this role;
     RRA has the role of recycling goods at the Eumundi Landfill;
     RRA indicated they could offer the mattress processing service in their tender submission
       for a cost and would have an expectation that another contractor would not be offered this
       role; and
    Mattress processing is directly linked to the other recycling and value adding services to be
      performed by RRA.

5.    Local Government Regulations
Section 235 (a) and (b) of the Local Government Regulations provides an option for Council
under these abovementioned circumstances.

Section 235 - Other exceptions
A local government may enter into a medium-sized contractual arrangement or large-sized
contractual arrangement without first inviting written quotes or tenders if—
(a) the local government resolves it is satisfied that there is only 1 supplier who is reasonably
      available; or
(b) the local government resolves that, because of the specialised or confidential nature of the
      services that are sought, it would be impractical or disadvantageous for the local government to
      invite quotes or tenders; or
(c) ……………..
(d) …………..

An exemption from tendering the services requires Council to form an opinion and pass a
resolution that the exemption complies with criteria detailed in section 235.




                                                                                      Page 11 of 107

Section 12

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      8 MAY 2018


Previous Council Consideration
Ordinary Meeting, 15 February 2018, Item 3, Page 11
That Council note the report by the Manager Waste and Environmental Health to the Services
and Organisation Committee Meeting dated 6 February 2018 regarding a new licence for
operation of the Reusable Goods Recycling and Sales Facility at the Resource Recovery Facility,
Eumundi Road, Doonan and:
A.   Award a licence for a period of 7 years (plus three licence extensions of one year each at
     Council’s discretion) to Resource Recovery Australia;
B.   The licence commencement date to be prior to 1 July 2018 as determined by the CEO;
C.   Authorise the CEO to extend the current licence for Noosa Community Training Centre to
     operate the site until a transfer of licence to Resource Recovery Australia can be smoothly
     achieved;
D.   Offer to purchase the existing Noosa Surf Club building and the small storage shed on site
     from Noosa Community Training Centre for an agreed market valuation;
E.   Require an undertaking from the successful tenderer in accordance with their proposal to
     offer employment to existing Briteside staff where staff meet the relevant employment
     criteria;
F.   Request the CEO to explore ways in which Council can support Noosa Community
     Training Centre to deliver their local training programs in the absence of revenue from the
     Briteside Tip Shop and report back to Council.

Further to item B of the resolution, the commencement date has now been negotiated with
Briteside and RRA as 1 June 2018.

It is important to note that the tender encouraged tenderers to be innovative and a key
performance outcome was improved diversion of waste from landfill. In their tender RRA
indicated they had the ability to process mattresses and recover foam and cloth. This was
considered to be an advantage for RRA during discussions on the awarding of the tender.

Finance
Council is already paying Endeavour to provide relief staff at the weighbridge and rural transfer
stations for annual leave replacement and sick leave absence. As a result, there is no significant
financial impact if this staffing arrangement with RRA is implemented. In fact, to call tenders and
engage external casual employees to relieve at the weighbridge would possibly be more
expensive than this proposal.

The estimated cost of providing these staffing services is $50,000 per annum or $350,000 over a
seven year period.

The processing of mattresses will cost $15 per sprung mattress which is $4 per mattress more
expensive than the current payment made to Briteside staff but has the additional advantage of
diverting a large volume of foam and cloth covering material from disposal to landfill.

The estimated cost to Council of recycling mattresses is $37,500 per annum or $262,500 over a
7 year period.




                                                                                   Page 12 of 107

Section 13

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                              8 MAY 2018


Risks & Opportunities
Risks
Failure to ensure trained staff are available to relieve at all waste disposal facilities could result in
serious impacts upon council’s reputation and loss of revenue from disposal fees if the facilities
are closed because staff are unavailable to operate a waste disposal facility.

Opportunities
     RRA is ideally situated at Eumundi Road to provide cost effective relief staff to allow
       permanent weighbridge staff to take a lunch breaks particularly when compared to the
       costs of external casual staff travelling to and from the facility to provide half an hour relief;
     RRA are also able to train a pool of relief staff which is more advantageous to Council than
       the engagement of one external casual staff member who would not be able to cover
       multiple staff absences on the one day;
     RRA would contribute significantly to the ongoing processing of mattresses including foam
       mattresses diverting a significant volume of foam and other material from disposal to
       landfill; and
     RRA is also a not for profit organisation so there is a positive social capital component to
       the proposed arrangement.

Consultation
External Consultation - Community & Stakeholder
Resource Recovery Australia Pty Ltd
Endeavour Australia

Internal Consultation
Governance Advisor, Paul Bright
People and Culture Manager, Will Burgess-Dean
Procurement and Fleet Manager

Departments/Sections Consulted:

     Chief Executive Officer   X   Community Services                      X   Corporate Services
     Executive Officer         X   Director                                    Director
     Executive Support             Community Development                       Financial Services
                                   Community Facilities                        ICT
                                   Libraries & Galleries                   X   Procurement & Fleet
                                   Local Laws                                  Property
                                   Waste & Environmental Health                Revenue Services

X    Executive Services            Environment & Sustainable Development       Infrastructure Services
     Director                      Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
X    Governance                    Economic Development                        Civil Operations
X    People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                          Page 13 of 107

Section 14

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                         8 MAY 2018


3                        NOOSA CULTURAL PLAN - DRAFT FOR PUBLIC CONSULTATION
DOCUMENT INFORM AT ION




Author                              Manager Libraries & Galleries, Kerri Contini
                                    Community Services Department

Index                               ECM/ Subject/41.22 – Social Policy

Attachments                         1     Draft Noosa Cultural Plan 2018 – 2023
                                          (Note: 44pg attachment provided separately to this report)



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Manager, Libraries and Galleries to the Services and
Organisation Committee dated 8 May 2018 and:
A.                       Approve the Draft Noosa Cultural Plan 2018 – 2023, included at Attachment 1 of this
                         report, for the purposes of community consultation; and
B.                       Request the Chief Executive Officer collate and consider the feedback for the purposes of
                         developing a final Noosa Cultural Plan for the future consideration of Council.



REPORT
The purpose of this report is to present the draft Noosa Cultural Plan 2018 – 2023 (the draft
Cultural Plan) to Council for consideration and seek approval to undertake community
consultation regarding the draft Cultural Plan.

1.                       Background

Noosa Council has not had a cultural strategy or plan since the Creative Noosa Strategy which
was endorsed in 2004 and in effect until amalgamation in 2008. During the period of
amalgamation with Sunshine Coast Regional Council a Cultural Development Policy was
endorsed in late 2012 and a strategic plan was in the early development stages however neither
had been practically implemented by the time of de-amalgamation. It has therefore been ten
years since Noosa Council has had an overarching strategic plan to provide a guiding focus to
the cultural sector.

In 2015 Noosa Council endorsed the Noosa Social Strategy (2016) which included the theme: “A
creative and informed community”. The development of an arts, culture and heritage plan was a
key action to be delivered under this theme.

In 2017 Council’s Community Services Department commenced the process to develop a
Cultural Plan covering the arts, culture and heritage sectors.




                                                                                                       Page 14 of 107

Section 15

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       8 MAY 2018


2.   Purpose

The Noosa Cultural Plan 2018 – 2023 will be a key Council planning document aligning with, and
supporting, Council’s Corporate Plan and our vision “Noosa Shire – Different by Nature”.

The Cultural Plan recognises the value of arts, culture and heritage to the Noosa community, and
to Council itself, and aims to secure a healthy future for the cultural sector based on shared
aspirations and priorities. It outlines a range of goals and actions across the coming five years to
2023 to build on existing strengths, address essential gaps and take advantage of emerging
opportunities.

Importantly it articulates the role of Council in the delivery of the Cultural Plan and seeks to
harness and direct available resources and stakeholder support to achieve a healthy future for
the cultural sector.

3.   Methodology

The development of the draft Cultural Plan has largely been undertaken in-house through the
Community Services Department.

A Cultural Plan Reference Group was established in 2017 to provide advice and guiding support
for the duration of the development of the Cultural Plan. In addition, the Heritage Reference
Group has provided advice regarding the heritage aspects of the Plan. Both Reference Groups
are chaired by a Councillor and contain a mix of external stakeholders and key internal officers.

As a starting point for the planning process, Cathy Hunt of Positive Solutions, was contracted to
research and write a paper exploring some of the significant factors which should be considered
in the development of a local Noosa cultural strategy.

The research phase of the planning process also included:
• An audit of existing and proposed arts, culture and heritage activities, facilities and
   organisations in Noosa Shire;
• A literature review of the regional, state and national arts, culture and heritage sectors;
• Examination of arts, culture and heritage trends and their implications for the Noosa region;
• Qualitative and quantitative analysis of the local arts, culture and heritage sectors; and
• Identification of arts, cultural and heritage opportunities through events, services,
   partnerships and infrastructure.

Broad community and stakeholder engagements was undertaken through:
• Community workshops;
• Forums and focus groups;
• Specific arts and cultural events such as Floating Land;
• YourSayNoosa online portal and forum;
• Targeted consultation with key internal and external stakeholders;
• Social media; and
• Email consultation with registered people of interest.

The draft Cultural Plan has been considered by both Reference Groups and internal stakeholders
and is now at the appropriate stage for widespread community consultation.




                                                                                   Page 15 of 107

Section 16

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       8 MAY 2018


4.   Summary

The draft Cultural Plan is a strategic plan for the arts, cultural and heritage sectors in Noosa. It
offers a study of local, national and international factors influencing the sectors and providing
context for the recommended strategies and actions. Importantly, the draft Cultural Plan aligns
with and seeks to support the aims and objectives of Council’s Corporate Plan, Council’s
planning scheme “The Noosa Plan”, the Noosa Social Strategy, the Noosa Shire Local Economic
Plan and Noosa Design Principles. It will replace the Cultural Development Policy which
transferred from Sunshine Coast Regional Council.

A timeframe of five years is proposed for the Cultural Plan from 2018 to the end of 2023. This
ensures that the plan has a range of short to medium term achievable actions with enough
flexibility to adapt to new issues or opportunities. The outcome of the feasibility study into a
potential new gallery or cultural facility will see the need to review and adjust the Plan going
forward.

The draft Cultural Plan presents six strategic themes:
1. History and Heritage
2. Places and Spaces
3. People and Participation
4. Knowledge and Learning
5. Growing the Cultural Economy
6. The Digital Future Begins Now

Each theme proposes strategic goals, key actions and several priority focus areas. Each year an
annual action plan would be developed in line with the budget process to progress the goals of
the Cultural Plan.

While currently presented as a single document, the intention is to produce a separate four to six-
page strategic summary once the community consultation is complete and the Cultural Plan has
been finalised.

5.   Proposed Community Consultation

It is proposed to undertake wide-ranging community and stakeholder consultation regarding the
draft Noosa Cultural Plan throughout May and June. Consultation will be encouraged through:
 Media releases and social media;
 Online discussion and feedback through YourSayNoosa portal;
 Meetings and focus groups with key internal and external stakeholders;
 Cultural Plan “Pop-ups” in key locations including libraries and the regional gallery; and
 Community Cultural Plan workshop.




                                                                                   Page 16 of 107

Section 17

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      8 MAY 2018


Previous Council Consideration
Ordinary Meeting, 20 October 2016, Item 5, Page 8
That Council note the report by the Director Community Services to the Services & Organisation
Committee Meeting dated 11 October 2016 and;
A.   Approve the Arts, Culture and Heritage Plan Scope as provided at Attachment 1 to the
     report subject to minor amendments approved by the CEO including the inclusion of an
     indigenous community representative on the reference group;
B.   Appoint Cr Wilkie to the reference group; and
C.   Delegate the appointment of the proposed community membership of the reference group
     to the CEO in consultation with the Mayor.

Ordinary Meeting, 21 July 2016, Item 1, Page 10
That Council note the report by the Community Development Coordinator to the Services &
Organisation Committee Meeting dated 12 July 2016 and
A.   Adopt the Noosa Social Strategy three (3) year Implementation Plan as set out in
     Attachment 1 to the report; and
B.   Request the Chief Executive Officer to provide an update and review of the Implementation
     Plan after twelve (12) months of operation.

Finance
The development of the Noosa Cultural Plan has largely been undertaken in-house with existing
staff resources. $2,000 has been allocated in the “Grow your Arts” RADF-funded budget to
support the upcoming community consultation phase.

Once the final Cultural Plan has been adopted, the implementation of any new initiatives
contained within the Plan will need to be considered within Council’s annual budget process and
priorities both now and into the future.

Risks & Opportunities
Noosa Council has been operating without a strategic policy for the arts, cultural or heritage
sector since de-amalgamation. Individual areas have performed at varying levels, often
dependent on the leadership at a micro-level.

The lack of a guiding strategic framework means that there is lack of clarity of priorities and
limited achievement of shared goals. Resources and energy are also splintered and some
opportunities have been missed.

Most importantly it is difficult to achieve significant or sustainable improvement without a shared
vision and planned actions outlined to achieve goals and objectives.

Consultation
External Consultation - Community & Stakeholder
Extensive external consultation has taken place as part of the development of the draft Noosa
Cultural Plan including ongoing reference groups, broad public consultation through various
means and targeted consultation with individuals and organisations. Please refer to the
Methodology section for further details.




                                                                                   Page 17 of 107

Section 18

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             8 MAY 2018


Internal Consultation
Internal consultation has taken place with key areas that have cross-over with arts, culture and
heritage. In addition, a Councillor workshop has been held to consider the draft Cultural Plan.
Further internal consultation will occur regarding the draft Cultural Plan during the public
consultation phase.

Departments/Sections Consulted:

X   Chief Executive Officer   X   Community Services                          Corporate Services
    Executive Officer         X   Community Development                       Financial Services
    Executive Support         X   Community Facilities                        ICT
                              X   Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
X   Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
X   Governance                X   Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                              X   Strategic Land Use Planning             X   Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 18 of 107

Section 19

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                          8 MAY 2018


4                        TOURISM NOOSA     2018-19   SPONSORED     EVENTS    -   TEMPORARY    PERMIT
                         APPROVALS
DOCUMENT INFORM AT ION




Author                          Property Manager, Clint Irwin
                                Corporate Services Department

Index                           ECM/ 34.6 – Licences/Permits/Registrations

Attachments                     1.   2018/2019 Tourism Events approved for funding by Tourism Noosa



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Property Manager to the Services & Organisation Committee
Meeting dated 8 May 2018 and approve the issuing of Temporary Event Permits for the events
detailed in Attachment 1 to the report.


REPORT
On 18 August 2017, a new funding agreement (the Agreement) was finalised between Tourism
Noosa and Council that addressed funding arrangements, strategy and planning requirements
and the responsibilities of both parties in relation to managing events. The Agreement notes that
Tourism Noosa must provide to Council by 31 July each year, a list of events Tourism Noosa
intends to provide conditional funding for and that it will promote. Tourism Noosa must also
ensure as a condition of any grant funding provided that the event organiser obtain a permit from
Council. The final determination regarding permit approval rests with Council.

Property Branch representatives meet with Tourism Noosa on a two monthly basis. At the 10 th
April 2018 meeting, Tourism Noosa provided a list of events proposed for conditional funding and
promotion for the 2018-2019 financial year (see Attachment 1). Council officers have no objection
to the issuing of Temporary Event Permits for each event listed in Attachment 1. Each event will
be managed by an appropriate suite of permit conditions.

Accordingly, this report seeks Council approval to issue Temporary Event Permits for each event
listed in Attachment 1.

Previous Council Consideration
Nil.

Finance
A review of the fee structure for all event application fees will be undertaken as part of the
2018/19 budget process.

Risks & Opportunities
Approval of the listed events allows Tourism Noosa and event organisers to undertake and
finalise event programs, marketing and planning. Event debriefings will be undertaken with
Tourism Noosa and event organisers as required and issues of significance pertaining to
particular events and their impact will be subject to further discussion with Council.

                                                                                        Page 19 of 107

Section 20

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             8 MAY 2018


Consultation
External Consultation - Community & Stakeholder
Tourism Noosa Ltd.

Internal Consultation
Director Corporate Services
Property Officer

Departments/Sections Consulted:

   Chief Executive Officer        Community Services                      X   Corporate Services
   Executive Officer              Director                                X   Director
   Executive Support              Community Development                       Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                              X   Property
                                  Waste & Environmental Health                Revenue Services

   Executive Services             Environment & Sustainable Development       Infrastructure Services
   Director                       Director                                    Director
   Community Engagement           Building & Plumbing Services                Asset Management
   Customer Service               Development Assessment                      Buildings and Facilities
   Governance                     Economic Development                        Civil Operations
   People and Culture             Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 20 of 107

Section 21

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     8 MAY 2018




                                                   Page 21 of 107

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                 8 MAY 2018

   TOURISM
   NOOS A                                                                  ATTACHMENT 1
   VISITNOOSA.COM.AU

   EVENTS TO BE OFFERED CONDITIONAL SPONSORSHIP BY TOURISM NOOSA
   2018-2019
   (Applicant to be advised by first week of April 2018).

   1.  King of the Mountain Festival -22 July 2018
   2.  Noosa Strade Bianche - 11-12 August 2018
   3.  Noosa Open Studios - 17-26 August 2018
   4.  Noosa Classic - 26 August 2018
   5.  Noosa Jazz Party - 24 August — 2 September 2018
   6.  Noosa Surf Film Festival - 4-7 October 2018 (Not providing financial support but will be asking The J if
      they can reduce the fees for the Festival)
   7.  Noosa International 7s Rugby - 11-14 October 2018
   8. Wild Women Adventure Race & Prologue - 13-14 October 2018
   9.  Noosa International Film Festival - 25-28 October 2018
  10. Noosa Triathlon Multi Sport Festival - 31 October - 4 November 2018
   11. Noosa Golf Club Legends Pro AM - 11 December 2018
   12. Noosa Summer Swim Festival - 2-3 February 2019
  13. Noosa Festival of Surfing - 9-16 March 2019
   14. Australian Body Art Festival - 5-7 April 2019
  15, Ultraman Australia - 11-13 May 2019
  16. Noosa Food & Wine Festival - 16-20 May 2019
  17, Runaway Noosa Marathon - 25-26 May 2019
  18. Noosa Alive - 19-28 July 2019

   Note - Highlighted Events are Tourism Events proposed for Noosa Main Beach

                                                                              Page 21 of 107

Section 22

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                        8 MAY 2018


5                        COUNCILLORS' EXPENSES REIMBURSEMENT POLICY UPDATE
DOCUMENT INFORM AT ION




Author                             Governance Advisor, Paul Bright
                                   Executive Services Department

Index                              ECM/ Council Policies

Attachments                        1.    Councillors’ Expenses Reimbursement Policy



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Governance Advisor to the Services & Organisation
Committee Meeting dated 8 May 2018 and adopt, pursuant to section 250(2) of the Local
Government Regulation 2012, the updated Councillors’ Expenses Reimbursement Policy
provided at Attachment 1 to the report.


REPORT
1.                       Policy Update

It is fair and appropriate that Councillors are reimbursed for, or Council covers, all reasonable
expenses incurred whilst undertaking Council business.

The policy provided at Attachment 1 is an updated version of the Councillors’ Expenses
Reimbursement Policy adopted by Council on 18 August 2016. The updates are identified via
mark up in the attachment and are summarised as follows:
 Provide further clarity around the approval process for Mandatory Professional Development
   & Representation and associated expenses;
 Provide a mechanism for Councillors to carry over to the following financial year any amount
   underspent of their $1,500 per year annual entitlement for Discretionary Professional
   Development and Representation;
 Provide further clarity around annual reporting requirements; and
 Minor formatting improvements.

Previous Council Consideration
Ordinary Meeting, 18 August 2016, Item 6, Page 9
That Council note the report by the Governance Advisor to the Services & Organisation
Committee Meeting dated 9 August 2016 and adopt the updated Councillors’ Expenses and
Reimbursement Policy provided at Attachment 1.




                                                                                      Page 22 of 107

Section 23

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         8 MAY 2018


Finance
A budget will be allocated each financial year for reasonable expenses to be incurred in
accordance with this policy. Pursuant to section 186 of the Local Government Regulation 2012,
costs incurred by Council under the Policy must be disclosed in Council’s Annual Report.

Risks & Opportunities
By having a clear policy in place for Councillors to claim reimbursement of, or for Council to cover
the reasonable costs incurred by Councillors relating to Council business ensures Councillors are
able to meet the community’s expectations related to performing their duties and associated
representation.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
Chief Executive Officer
Director of Executive Services
Executive Assistant to the Mayor

Departments/Sections Consulted:

X      Chief Executive Officer    Community Services                      Corporate Services
       Executive Officer          Director                                Director
X      Executive Support          Community Development                   Financial Services
                                  Community Facilities                    ICT
                                  Libraries & Galleries                   Procurement & Fleet
                                  Local Laws                              Property
                                  Waste & Environmental Health            Revenue Services

X      Executive Services         Environment & Sustainable Development   Infrastructure Services
X      Director                   Director                                Director
       Community Engagement       Building & Plumbing Services            Asset Management
       Customer Service           Development Assessment                  Buildings and Facilities
X      Governance                 Economic Development                    Civil Operations
       People and Culture         Environmental Services                  Disaster Management
                                  Strategic Land Use Planning             Infrastructure Planning,
                                                                          Design and Delivery




                                                                                     Page 23 of 107

Section 24

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     8 MAY 2018




                                                   Page 24 of 107

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             8 MAY 2018

                                                                               ATTACHMENT 1

        | ¢ yy     NOOSA                                                       Council Policy
        @      |   COUNCIL                           COUNCILLORS’ EXPENSES

       Corporate Plan Reference:                 ‘A sustainable Council

       Endorsed by Council:                       18 August 2016

 |     Policy Author:                            Executive MarnagerDirector Executive Services

       POLICY BACKGROUND
       The purpose of this policy is to set the parameters to authorise payment of reasonable expenses
       incurred, or to be incurred, by Councillors; and provide facilities to assist Councillors to discharge
       their duties and responsibilities.
       This policy aims to ensure accountability and transparency in the reimbursement of expenses
       incurred by the Mayor and Councillors.
       This policy is aligned to the principles underpinning the Local Government Act 2009 (the Act), that
       is:
       ¢« Transparent and effective processes and decision-making in the public interest;
       «  Good governance of, and by, local government; and
       e  Ethical and legal behaviour of Councillors and local government employees.

       This Policy applies to the Mayor and Councillors and is made pursuant to section 250 of the Local
       Government Regulation 2012.
       Definitions
       Council Business shall mean official business conducted on behalf of Council, where a Councillor
       is required to undertake certain tasks to satisfy legislative requirements or achieve Council
       objectives, for example, attend official Council meetings, Councillor forums and workshops, formal
       professional development training relevant to Councillor responsibilities, Committees/Boards as
       Council's official representative, and scheduled meetings relating to Council appointments.
       Council Business should result in a benefit being achieved either for the local government and/or
       the local community, for example, this includes but is not limited to:
       e  Preparing, attending and participating in Council meetings, Committee meetings, workshops,
          strategic briefings, deputations and inspections;
       e  Investigating issues/complaints regarding Council services raised by residents/ ratepayers/
          visitors to the Council area;
       e  Undertaking approved professional development opportunities;
       e  Attending civic functions or events;
       e  Attending public/community meetings, presentation dinners, annual general meetings where
          invited as a Councillor;
       e  Attending a community event (e.g. school fete, community group awards and presentations,
          fundraisers) where a formal invitation has been received.
       Participating in a community group event or being a representative on a Board not associated with
       Council is not regarded as Council business.

                                                                                         Page 24 of 107

Section 25

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     8 MAY 2018




                                                   Page 25 of 107

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                            8 MAY 2018

       Councillors shall mean the Mayor and Councillors unless otherwise stated.
       Expense shall mean payments made by Council to reimburse Councillors for their reasonable
       expenses incurred or to be incurred when discharging their duties as Councillors. These payments
       are not regarded as remuneration. The expenses may be either reimbursed to Councillors or paid
       direct by Council for something that is deemed a necessary cost or charge when on Council
       business.

       Facility shall mean the ‘tools of trade’ provided by Council, required to enable Councillors to
       perform their duties with relative ease and at a standard appropriate to fulfil their professional role
       for the community.
       Hospitality expense is defined in Council’s Entertainment and Hospitality Expenditure Policy as
       reasonable costs associated with entertaining visitors (where Council has an interest in, or a
       specific obligation towards, facilitating the visit).
       Professional Development shall mean attendance by a Councillor at an event where the
       Councillor expects to develop further skills and knowledge relevant to their role as a Councillor.
       Representation shall mean attendance by a Councillor at various community and special interest
       representative group meetings and events, which are relevant to the role of Councillor.
       Reasonable shall mean the application of sound judgement and consideration of what is prudent,
       responsible and acceptable to the community when determining levels of facilities and expenditure.

       COUNCIL POLICY
       1    General Entitlement
       Councillors are entitled to be reimbursed reasonable expenses incurred while undertaking Council
       business and to be provided with facilities to assist them in undertaking their duties. A budget will
       be allocated each financial year for reasonable expenses to be incurred in accordance with this
       policy.
       2    Professional Development & Representation
       Council will reimburse or be responsible for the cost of reasonable expenses incurred for:
       °    Mandatory professional development & representation; and/or
       °    Discretionary  professional  development   &  representation  deemed    essential for the
            Councillor's role.
       Any professional development & representation requiring overseas travel requires a formal Council
       resolution.

       2.1  Mandatory Professional Development & Representation
       Noosa Council will reimburse or cover expenses incurred for the following activities:
       °    Attendance of two delegates at the LGAQ (Local Government Association Queensland)
            Annual Conference: The Mayor (or the Mayors Nominee Councillor) as the primary delegate
            and a Councillor as a secondary delegate;
       °    Attendance of the Mayor at the ALGA (Australian Local Government Association) Annual
            Conference and any other ALGA relevant conferences/seminars/workshops;
       °    Workshops, courses, seminars, conferences, and meetings that are important to the role of a
            Councillor where approval to attend is obtained via Council resolution or granted by the
 |          Mayor for Councillors other than the Mayor, or by the CEO for the Mayor.-

                                                                                         Page 25 of 107

Section 26

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     8 MAY 2018




                                                   Page 26 of 107

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                               8 MAY 2018

 |     Council will reimburse expenses e.g. flights, motor vehicle, parking costs, accommodation, meals
       and associated registration fees, deemed reasonable and necessary to achieve the business of
       Council where:
       «     A Councillor is an official representative of Council; and
       e     The activity/event and travel has been endorsed by resolution of Council, or by the Mayor_for
             Councillors other than the Mayor, and by the CEO for the Mayor.-
       2.2.  Discretionary Professional Development & Representation
       Each Councillor can attend, at their discretion, meetings, workshops, courses, seminars and
       conferences that improve their skills or which are relevant to the role of Councillor.   This will
       generally be is-limited to $1,500 per year for the quadrennial term of office. However, any amount
       underspent below the $1,500 per year budget within a particular financial year will be budgeted for
       use during the next financial year in addition to the annual $1,500 limit. There is no transfer
       permitted between Councillors and no carry forward option beyond one year.-
       There is no requirement for a Council resolution to approve these attendances. Council will pay for
 |     or reimburse expenses e.g. transport costs (such as flights, taxis, vehicle hire, and parking),
       accommodation, meals and associated registration fees, deemed reasonable and necessary.
       For reimbursement, the Councillor must submit details to the Chief Executive Officer prior to
       attending and provide all relevant documentation within 14 days of attending the event to ensure
       reimbursement of expenses.

       Details/Conditions for travel under Section 2
       Travel
       Approval for such travel as noted above is subject to the following conditions:
 |     °     Wherever possible all travel by Councillors will be booked and paid for by Council in
             advance;
       e     Travel is to be undertaken by the most direct route;
       °     Travel tickets are not transferrable;
       e     Requests for travel should be made in sufficient time to take advantage of discounts and gain
             access to the widest range of flights;
       °     Economy class travel is the standard, unless otherwise approved;
       °     Any fine issued whilst undertaking Council business is the responsibility of the Councillor
             incurring the fine;
       °     Travel insurance is provided for all Councillors on Council business.
       Meals when travelling for Council business
       The reimbursement of meal costs of Councillors when travelling on Council business may be made
       using one of the two methods below:
       Method 1 - Council will reimburse the reasonable cost of meals where a Councillor:
       e   Incurs the cost personally; and
       e   ls not provided with a meal within the registration costs of the approved activity/event; and
       e   Produces a valid tax invoice.

       Method 2 - If a Councillor is unable to produce a tax invoice and seeks reimbursement for meals
       while attending official Council business, he/she may claim up to the maximum meal allowance in
       accordance the Australian Tax Office (ATO) standards.
       Expenses relating to the consumption of alcohol will not be reimbursed.

                                                                                            Page 26 of 107

Section 27

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     8 MAY 2018




                                                   Page 27 of 107

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                          8 MAY 2018

   Accommodation
   Councillors may need to stay away from home overnight while attending to Council business. All
   accommodation associated with Council business will be booked and paid for by Council.
   When attending conferences, Councillors should try to take advantage of the package provided by
   conference organisers (if offered and applicable) and therefore stay in the recommended
   accommodation subject to availability. Otherwise, suitable accommodation will be sought within a
   reasonable distance to the venue in which the Councillor is to attend.

   Overnight accommodation will be reimbursed when a Councillor is unexpectedly required to stay
   outside the Sunshine Coast Region and it is unreasonable to expect the Councillor to return home
   for the night (accommodation selected should be of a reasonable standard and appropriately
   priced).

   3     Hospitality
   Councillors may have occasion to incur hospitality expenses while conducting Council business,
   apart from civic receptions organised by Council. The Mayor may particularly require additional
   reimbursement when entertaining dignitaries outside of official events.
   To allow for this expense, the following amounts can be claimed:
   °     Councillors up to $500 per annum
   °     Mayor up to $5,000 per annum
   To claim, the Mayor or Councillor must provide a written statement of whom they entertained and
   an indication of the costs. Receipts should be provided. All expenses relating to this category must
   comply with Council's Entertainment and Hospitality Expenditure Policy.

   4     Private Vehicle Usage
   The use of a Councillor's private vehicle for Council business (as defined) will be reimbursed by
   Council.

   Councillors may elect one of two options regarding this reimbursement below:
   Option 1
   Councillors accept an annual payment of $5,000 as reimbursement for the use of their private
   vehicles on Council business.
   Option 2
   Councillors may make a monthly claim for reimbursement of use of their private vehicles on
   Council business by submitting the appropriate form detailing the relevant travel based on log book
   details.

   The amount reimbursed will be based on the published ATO business use of motor vehicle cents
   per kilometre rate applicable at the time of travel.
   Councillors will be provided with an appropriate log book to assist in this process.

                                                                                       Page 27 of 107

Section 28

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     8 MAY 2018




                                                   Page 28 of 107

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         8 MAY 2018

  5     Council Vehicles
  5.1.  Use of Council provided vehicles on Council business
  Councillors will have access to a suitable Council vehicle for Council business if required. A
  Councillor wishing to use a Council vehicle for Council business must submit a request to the Chief
  Executive Officer at least two (2) days prior to use, except in exceptional circumstances as
  determined between the Councillor and Mayor or Chief Executive Officer. Access is subject to
  availability.
  This is for situations where a Councillor's own vehicle isn’t immediately available and they have to
  travel on Council business over long distances (for example, a meeting in Brisbane).
  5.2.  Private use of Council Vehicles
  The use of Council vehicles for private use is only available in emergency situations and the cost of
  such usage shall be provided at the applicable ATO rate for the vehicle size.
  5.3   Fuel Costs
  All fuel used in a Council owned vehicle on official Council business will be provided or paid for by
  Council.

  6     Home Office and Telecommunication needs — Consumables, Mobile Phones and
        Tablets
  To enable Councillors to communicate effectively, Councillors will receive an allowance of $240
  per month to purchase communications devices and plans as well as printer consumables for their
  residences.

  7     Administration Tools and Access to Council Office Amenities
  Councillors will be provided with the following:
  °     Access to suitable hot desks at the Tewantin Office and Council meeting rooms for usage as
        required;
  °     Administrative support at the Tewantin Office;
  °     Use of Council landline telephone and internet access at the Tewantin Office;
  °     Access to a printer, photocopier, paper shredder at the Tewantin Office;
  °     Access to a Fax and/or scanner at the Tewantin Office;
  °     Any other administrative necessities, which Council resolves, are necessary to meet the
        business of Council.
  In addition to the above, the Mayor will be provided with a separate office and an administrative
  officer for administrative support.
  Councillors are expected to comply with the same conditions of use, guidelines and processes for
  business and communication tools that apply to employees.

  8     Safety Equipment
  Council will provide to Councillors necessary safety equipment for use on official business as and
  when required.

                                                                                      Page 28 of 107

Section 29

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     8 MAY 2018




                                                   Page 29 of 107

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             8 MAY 2018

       9     Insurance Cover
       Councillors will be covered under relevant Council insurance policies while on Council business.
       Specifically, insurance cover will be provided for public liability, professional indemnity, Councillors
       liability and personal accident, and, domestic and overseas travel.
       Council will pay the excess for injury claims made by a Councillor resulting from the conduct of
       official Council business and on any claim made under insurance cover.
       Council will cover costs incurred through injury, investigation, hearings or legal proceedings into
       the conduct of a Councillor_where—or arising out of, or in connection with the Councillor's
       performance of his/her ss4c—Councillor functions. Where it has been found that the Councillor
       breached the provisions of the Local Government Act 2009 or other legislation, the Councillor will
       reimburse Council wi#th-all associated costs incurred by Council.

       10    Limit
       Council may by resolution reduce or limit benefits receivable under this policy.

       REPORTING
       Pursuant to section 186 of the Local Government Regulation 2012, Council’s Annual Report must
       contain the particulars of the expenses incurred by, and the facilities provided to, each Councillor
       during the financial year under this policy.

       REVIEW OF POLICY
       This policy will be reviewed when any of the following occur:
       1.    The related documents are amended or replaced.
       2.    Other circumstances as determined from time to time by a resolution of Council
       Notwithstanding the above, this policy is to be reviewed within six months of each quadrennial
       election.

       RELEVANT LEGISLATION AND COUNCIL POLICIES
       Local Government Regulation 2012
       Local Government Act 2009
       Entertainment and Hospitality Expenditure Policy
       Councillor Code of Conduct

       Version control
        Version    Reason/ Trigger               Change (Y/N) Endorsed/ Reviewed by    Date

                                                                                         Page 29 of 107

Section 30

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    8 MAY 2018


6                        LOCAL LAWS DELEGATION OF AUTHORITY
DOCUMENT INFORM AT ION




Author                             Governance Advisor, Paul Bright
                                   Executive Services Department

Index                              ECM/ Subject/ Local Laws

Attachments                        1.   Local Laws Delegation of Authority



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Governance Advisor to the Services & Organisation
Committee Meeting dated 8 May 2018 and pursuant to section 257 of the Local Government Act
2009, agree to delegate to the Chief Executive Officer the powers outlined in the updated Local
Laws Delegation of Authority provided at Attachment 1 to the report.


REPORT
1.                       Update to Council’s Local Laws Delegation of Authority

Pursuant to section 257 of the Local Government Act 2009 (LGA), a Local Government, may by
resolution, delegate a power of the Local Government under the LGA or another Act to:
 The Mayor; or
 The Chief Executive Officer (CEO).

Pursuant to section 259 of the LGA, a CEO may on-delegate powers that have been delegated to
CEO from Council.

As a general guide, where a legislative instrument or local law refers to a particular power of a
‘local government’ this is a power of Council and therefore, that power is only able to be
exercised by Council unless that power has been appropriately delegated to the CEO and then
on delegated to employees (where appropriate).

The current Local Laws Delegation of Authority has been updated to include the Noosa Shire
Council Local Law No 7 Waste Management 2018, which was made by Council at the Ordinary
Meeting of 15 March 2018.

By Council delegating its powers under Local Law No 7 Waste Management 2018 to the CEO,
the CEO is then able to on-delegate relevant powers to appropriate Local Laws and Waste and
Environmental Health team members for operational purposes.




                                                                                  Page 30 of 107

Section 31

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                            8 MAY 2018


Previous Council Consideration
Ordinary Meeting, 21 December 2017, Item 7, Page 9
That Council note the report by the Governance Officer to the Services & Organisation
Committee Meeting dated 12 December 2017 and:
A.       Pursuant to section 257 of the Local Government Act 2009, agree to delegate the powers
         of the Local Government to the Chief Executive Officer outlined in the Delegations of
         Authority provided at Attachment 1 with the exception of the powers relating to the
         compulsory acquisition of land pursuant to the Acquisition of Land Act 1967; and
B.       Pursuant to section 257 of the Local Government Act 2009, agree to delegate the powers
         of the Local Government to the Chief Executive Officer outlined in the Delegations of
         Authority provided at Attachment 2.

Finance
Not applicable.

Risks & Opportunities
If Council’s delegations are not up to date or officers operate outside of their delegated authority,
relevant decisions made and action taken may be considered unauthorised and subject to
challenge. This exposes Council to risk of complaints and legal action by third parties resulting in
unnecessary costs and reputational damage.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
Manager Waste and Environmental Health
Manager Local Laws
Governance Officer

Departments/Sections Consulted:

       Chief Executive Officer   X   Community Services                      Corporate Services
       Executive Officer         X   Director                                Director
       Executive Support             Community Development                   Financial Services
                                     Community Facilities                    ICT
                                     Libraries & Galleries                   Procurement & Fleet
                                 X   Local Laws                              Property
                                 X   Waste & Environmental Health            Revenue Services

X      Executive Services            Environment & Sustainable Development   Infrastructure Services
       Director                      Director                                Director
       Community Engagement          Building & Plumbing Services            Asset Management
       Customer Service              Development Assessment                  Buildings and Facilities
X      Governance                    Economic Development                    Civil Operations
       People and Culture            Environmental Services                  Disaster Management
                                     Strategic Land Use Planning             Infrastructure Planning,
                                                                             Design and Delivery




                                                                                        Page 31 of 107

Section 32

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     8 MAY 2018




                                                   Page 32 of 107

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                          8 MAY 2018

     ee
     me meee Ree                    N(el ts                                      ATTACHMENT 1

      TITLE:      LOCAL LAWS

      Delegation by Council to:                                      Council Resolution date:

      Chief Executive Officer

      Source of Authority:
      Local Government Act 2009 — Section 257 & 259
      Noosa Shire Council Local Law No. 1 (Administration)2015
      Noosa Shire Council Subordinate Local Law No. 1 (Administration)2015
      Noosa Shire Council Local Law No. 2 (Animal Management) 2015
      Noosa Shire Council Subordinate Local Law No. 2 (Animal Management) 2015
      Noosa Shire Council Local Law No. 3 (Community and Environmental Management) 2015
      Noosa Shire Council Subordinate Local Law No. 3 (Community and Environmental Management)
      2015
      Noosa Shire Council Local Law No. 4 (Local Government Controlled Areas, Facilities and Roads)
      2015
      Noosa Shire Council Subordinate Local Law No. 4 (Local Government Controlled Areas, Facilities
      and Roads) 2015
      Noosa Shire Council Local Law No. 5 (Parking) 2015
      Noosa Shire Council Subordinate Local Law No. 5 (Parking) 2015
      Noosa Shire Council Local Law No. 6 (Bathing Reserves) 2015
      Noosa Shire Council Subordinate Local Law No. 6 (Bathing Reserves) 2015
      Noosa Shire Council Local Law No.7 Waste Management 2018

    Delegated Power:

     1.   To exercise the powers of local government under the Local Government’s Local Laws
          including but not limited to the following:
          (a)  keep and maintain a register;
          (b)  approve a form, accept or obtain a certificate, renew, refuse, extend, transfer, amend,
               suspend, restrict, request further reasonable information or clarification,  impose
               prescribed conditions, cancel, make null and void, apply and amend conditions, waive
               requirements and grant an approval’;
          (c)  give awritten, information, impounding, show cause or compliance notice;
          (d)  take a sample for analysis;
          (e)  offer a reward for information;
          (f) | recover the cost of an action from the responsible person;
          (g)  review an original decision;
          (h)  extend the time for making a review on an original decision;
          (i)  give a stop order;

    1   An approval means a consent, permit, authorisation, registration, membership, label or approval under a
    local government act or a local law and includes all the conditions of a consent, permit, authorisation,
    registration, membership or approval.

                                                                                       Page 32 of 107

Section 33

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA     8 MAY 2018




                                                   Page 33 of 107

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                          8 MAY 2018

   eke]    NOOSA              COUNCI
              OOSA COUNCIL
   mm

         (j) | advise the community by signage from where animals are prohibited, or the designation
              of dog off leash areas;
         (k)  declare or revoke an animal other than a dog to be a declared dangerous animal:
         (1) | establish an animal pound, or join with another local government or agency to establish
              an animal pound;
         (m)  keep and make available for inspection a register of impounded animals;
         (n)  make a destruction order and destroy an animal;
         (0)  dispose of or offer an animal for sale by public auction or tender;
         (p)  erect, install and maintain a sign;
         (q)  give arelevant place a name;
         (r) | seize, impound and dispose of goods and animals;
         (s)  form an opinion for land adjoining a road to be fenced to prevent risk; and
         (t)  issue a parking permit.
         (u)  issue an infringement notice
   2.   To exercise the powers of local government under Noosa Shire Council Local Law No. 6
         (Bathing Reserves) 2015 including the authority to appoint:
         (a)  an employee of the local government as an authorised person;
         (b)  other persons who are eligible for appointment as authorised persons under the Local
              Government Act 2009;
         (c)  assign to a lifesaving club the responsibility for patrolling a bathing reserve.

   Conditions of Delegation:
   1.  | The delegated officer must exercise this delegation in accordance with council; resolutions,
         policies, guidelines, procedures, industrial instruments and agreements.
  2:     If the Chief Executive Officer on delegates any of these powers the delegated officer must
         exercise any delegated power in accordance with the scope and limitations of the subject
         officer's letter of appointment and/or, position description, qualifications, technical knowledge
         and legislative requirements.
  3.     In the event that there is a change to any Delegate Position as set out in the schedule of this
         instrument (Former Delegated Position) which is not then reflected in this Instrument:
         a.   for any Former Delegated Position that remains in existence and has been renamed,
              the reference in this Instrument to the Former Delegated Position will be read as a
              reference to the renamed position; and
        b.    for and Former Delegated Position that ceases to exist, the reference in this Instrument
              to the Former Delegated Position will be read as being a reference to the position that
              then most closely resembles the Former Delegated Position.

                                                                                       Page 33 of 107

Section 34

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    8 MAY 2018


7                        CERTIFIED AGREEMENT NEGOTIATION PROCESS
DOCUMENT INFORM AT ION




Author                           People and Culture Manager, Will Burgess-Dean
                                 Executive Services Department

Index                            ECM/ Subject/ Certified Agreement

Attachments                      Nil



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the People and Culture Manager to the Services & Organisation
Committee Meeting dated 8 May 2018 providing an update on the Certified Agreement
negotiation process and authorise the Chief Executive Officer to finalise the Noosa Shire Council
Certified Agreement.


REPORT
The purpose of this report is to inform Council of progress in the development of a Noosa Shire
Council Certified Agreement (CA) and to identify any changes to the current Certified
Agreements. This report will also outline the final steps in the process for the Certified
Agreement to be certified.

1.                       Background

Since de-amalgamation, two Sunshine Coast Council Certified Agreements have continued to
apply to Noosa Shire Council. These are (i) the Council officers CA and (ii) the field-based
employees CA, and although those two agreements nominally expired in 30 June 2014, they
continued to apply to Noosa Council under relevant industrial relations legislation. The Council
and Unions had not been able to negotiate new agreements while major changes to awards and
the new Industrial Relations Act 2016 were implemented. There has been major industrial
relations reform by the State Government in recent years with new IR legislation and a new local
government award. One of the major changes has been that all Council employees are now
covered under one Local Government Industry Award. There were previously more than 15
different local government awards.

While the State was undertaking this reform, Councils across Queensland were unable to
negotiate Certified Agreements for a number of years. The reforms were finalised in early 2017.

Across Queensland Local Government, seventy-two (72) certified agreements have expired and
Councils are in various stages of developing new Certified Agreements. Currently eight (8)
Councils have completed new CA’s including the Sunshine Coast Council. Noosa Council
commenced the negotiating process with the relevant unions in May 2017.

During negotiations the four participating unions and employee delegates presented 24 claims.
The management negotiating team also raised a range of issues for negotiation.




                                                                                 Page 34 of 107

Section 35

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       8 MAY 2018


Following months of negotiations, in February, Unions and their employee representatives
agreed that the proposed Noosa CA document would be put to staff for a vote. The vote is
planned to occur in May 2018 utilising an electronic voting system.

Many of the clauses within the proposed new CA remain unchanged from the Sunshine Coast
Council certified agreements with the exception of the issues identified below. An important
matter throughout negotiations has been the pay increase. Since 2014, Council has provided a
number of administrative pay increases to staff – a one off recognition payment in December
2014 in lieu of a payrsie which was due on 1 July 2014, 1.5% in July 2015 (back dated to 1
January 2015) and 2% in July 2016. No further wage increases have occurred since July 2016.

Signatories to the proposed new three-year CA will include:
 CEO, Noosa Council
 The Services Union
 The Australian Workers Union of Employees
 The Construction, Forestry, Mining and Energy Union of Employees
 United Voice Industrial Union of Employees
 Plumbers Union of Employees Qld
 Professionals Australia.

The changes negotiated from the applied to the proposed Noosa Council CA include:
 a pay increase of 2.5% applied each year of the agreement or CPI whichever is greater. The
   first pay rise will apply from 28 February 2018 if there is a successful vote;
 one Certified Agreement, not two, which will provide administrative improvements and will
   reflect the fact that we are one organisation. This is a significant milestone for our Council as
   up until this point, most Councils have had to manage multiple CAs for their workforce;
 allowances in the Certified Agreement to increase in line with the annual pay increase
   whereas under the previous SCRC agreements, they were increased in accordance with
   rulings of the QIRC state wage cases;
 inclusion of Domestic and Family Violence Leave (of up to 10 paid days) in line with the Qld.
   Employment Standards provisions of the Industrial Relations Act 2016; and
 an improvement to the study leave provision to allow participation for our temporary and
   casual employees who previously had not received study leave support.

Previous Council Consideration
Nil.

Finance
The financial implications of the new CA will be incorporated into the 2018/19 budget.

Risks & Opportunities
Having a single agreement provides for some administrative improvements from a management
perspective and assists in breaking down the barriers between the indoor and outdoor staff. The
most significant risk of not agreeing on a new CA is employee discontent and industrial action.
The finalisation of the Noosa Certified Agreement in place of the two existing Sunshine Coast
Certified Agreements is also a milestone as it is the last of the major de-amalgamation issues to
be finalised. The finalisation of the CA process is also dependent on a successful vote by staff
which is scheduled for May 2018. The CA also needs to be certified by the Queensland
Industrial Relations Commission.




                                                                                   Page 35 of 107

Section 36

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             8 MAY 2018


Consultation
External Consultation - Community & Stakeholder
Relevant unions.

Internal Consultation
Internal consultation has been extensive prior to the negotiation process beginning as well as
during the process. Staff communication was undertaken via regular CEO updates and
information sessions.

Departments/Sections Consulted:

X   Chief Executive Officer   X   Community Services                      X   Corporate Services
    Executive Officer             Director                                    Director
    Executive Support             Community Development                       Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
X   Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
X   People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 36 of 107

Section 37

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                            8 MAY 2018


REPORTS FOR NOTING BY THE COMMITTEE
8                        NOOSA SPIT FORESHORE EROSION UPDATE
DOCUMENT INFORM AT ION




Author                           Project Coordinator – Flooding, Coastal and Foreshores, Daniel Wishaw
                                 Infrastructure Services Department

Index                            ECM/ Projects (T1) / Noosa Dog Beach SEMP Coastal Monitoring –
                                 CAP.WORK – 100723
                                 ECM / Subject / Environmental Management / Erosion

Attachments                      Nil



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Project Coordinator – Flooding, Coastal and Foreshores to
the Services & Organisation Committee Meeting dated 8 May 2018 providing an update on
Noosa Spit Foreshore erosion.


REPORT
This report provides an update to Council regarding ongoing erosion at the Noosa Spit foreshore.
Councillors will recall that in August 2017, the following resolution was passed:
That Council note the report by the Project Officer to the Services & Organisation Committee
meeting dated 8 August 2017 providing an update on erosion at Noosa Dog Beach and request
staff seek expert advice on the management of this area into the future, with a further report to
come to Council once that advice has been received.
This report provides Council with more information about how expert advice will be formalised via
a Shoreline Erosion Management Plan.

1.                       Background

The Noosa Spit was established by the Queensland Government’s Beach Protection Authority
(BPA) in 1978 as part of the BPA’s “Scheme for the Protection of Hays Island and Restoration of
Noosa Beach”. The function of this scheme was to protect Hays Island (now Noosa Sound) as a
result of “severe erosion occurring along the northern revetment”.

The Noosa Spit has worked effectively as a defence for Noosa Sound since its creation nearly 50
years ago until 2010 when the Sunshine Coast Regional Council (SCRC) responded to severe
erosion that was occurring at the north facing beach of Noosa Spit known as “Dog beach”.
SCRC constructed both a geotextile sand container groyne and a submerged training wall in
2012. The works were originally designed to be implemented in two stages, with stage 1
designed to arrest erosion in the most critical area, the western end, which was eroding at a rate
of 15m/year. A second stage of these works were designed and partially deployed.




                                                                                          Page 37 of 107

Section 38

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      8 MAY 2018


While these works included a thorough investigation of the potential solutions at the time, using
numerical modelling, the project scope was limited to the rehabilitation of these critical areas of
erosion. The investigations that were undertaken at the time of this project were never developed
into a formalised Shoreline Erosion Management Plan and there remains considerable
opportunity to better understand this region under current and future climate conditions.

The works constructed by SCRC were effective in mitigating erosion loss in the areas they were
designed to (i.e. the western tip and eastern end of the beach); however, since September 2017
the middle section of the beach has been experiencing severe erosion. Council staff have been
closely monitoring and evaluating this erosion in order to more thoroughly understand the ability
of Noosa Spit to perform as a coastal defence to Noosa Sound.

2.   Loss of Coastal Defence Risk Assessment

Council staff conducted a study in early 2018 to quantify the extent of erosion of the Noosa Spit
Foreshore using three-dimensional survey analysis to quantify the volume of sediment lost and a
two-dimensional aerial photography analysis to quantify the magnitude of shoreline recession.

The survey analysis indicated a loss of nourishment of approximately 18,000m3 between
November 2016 and July 2017, with an annual rate of erosion of 27,000m3/year.

Further survey work will be repeated in July 2018.

The aerial photography analysis (Figure 1 & 2) below compares the high water mark for all the
data points and uses this to predicatively forecast the shoreline position in the future.

Figure 1 shows the shoreline position in April 2015 with the shoreline measurement lines
overlayed, while Figure 2 shows the same measurement lines overlaying a December 2017
aerial photograph, the latest such image available.




                                Figure 1: April 2015 Shoreline position




                                                                                   Page 38 of 107

Section 39

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                           8 MAY 2018




                               Figure 2: December 2017 Shoreline Position

It is difficult to predict with absolute certainty what rate of erosion will occur in the future. This is
affected by the impact of existing vegetation which could slow the previous rate of erosion but
could also be accelerated by extreme weather events. What is certain is that the Council would
need to intervene to ensure that no break through would occur to protect the overall purpose of
the Noosa Spit ie protecting Hayes Island (Noosa Sound).

A preliminary analysis based on aerial photography of different erosion timelines has been
undertaken. If the current rate of erosion continues (although the existence of vegetation on
Noosa Spit may reduce that rate of erosion) then by December 2018, the risk of break through is
low. If it continues at the same rate in 2019 and 2020, then the risk increases substantially. The
impact of extreme weather events is also an unknown in terms of the rate of erosion.

The further survey work in July 2018 will provide Council with an important update in terms of the
rate of erosion and allow better modelling in terms of risk assessment.

The Coastal Management Plan (2014) provides best practice guidance for coastal management
and recommends a science based approach that includes deeper understanding through a
formal nourishment transpot model within a Shoreline Erosion Mangement Plan (SEMP). Sand
nourishment is typically recommeneded as a remediation option in the short term.

Implementing a SEMP will require coastal data collection, river and near shore bathymetry
collection, creation of a numerical model that can accurately model sediment transport followed
by a remediation options analysis.

Council officers have applied for grant funding under the Natural Disaster Resilience Program to
assist in the funding of the SEMP development.




                                                                                        Page 39 of 107

Section 40

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                    8 MAY 2018


3.   Permit Requirements

Council staff held a pre-lodgement meeting with the Department of Environment and Heritage
Protection (DEHP) on 27 July 2017 to discuss the possibility of recommencing dredging and
beach nourishment within the Noosa Spit area. These discussions included the possibility of
reinstating dredge permit EPPR00439413, for the area adjacent to the Noosa Spit which expired
on 26 May 2009. The desired outcome from this meeting was to seek an amendment to the
lapsed permit and modification of the dates applicable for nourishment in this area.

Recommencement of dredging was provisionally supported by DEHP, with advice that the
amendment process would take approximately 4 weeks and cost approximately $5,000 for the
approval.

If this amendment were successful Noosa Council would be able to dredge and place up to
100,000m3 of sand per year, well above current estimated requirements of approximately
40,000m3.

Council officers will proceed with obtaining a reinstatement of the dredge permit EPPR00439413
for potential future works in the area.

Previous Council Consideration
Ordinary Meeting, 17 August 2017, Item 4, Page 12
That Council note the report by the Project Officer to the Services & Organisation Committee
meeting dated 8 August 2017 providing an update on erosion at Noosa Dog Beach and request
staff seek expert advice on the management of this area into the future, with a further report to
come to Council once that advice has been received.

Finance
Preparation of a Shoreline Erosion Management Plan (SEMP) including bathymetry collection
would cost approximately $280,000. Council has a 2018/19 draft budget allocation for bathymetry
collection of $60,000 relating to the planning scheme development, with $220k currently
unallocated in the current or future budget.

Currently a grant application has been submitted for the natural Disaster Resilience Program
(NDRP) whereby 50% grant funding has been applied for. If successful, funding of $136k would
be received leaving a balance of $84k to be sourced from Council funds in the 2018/19 budget.

Risks & Opportunities
The risks of not undertaking a SEMP include:
1.    Attempts to address shoreline erosion may not be fully understood and optimised.
2.    Without guidance from a SEMP future mitigation solutions may not be the most effective or
      cost effective long term.
3.    Reputational damage, due to a perception of poor management. This view is currently
      reflected through complaints to Council staff about lack of action at the Noosa Spit and is
      expected to grow as this situation worsens.

The opportunities presented by undertaking the SEMP process are:
1.   Alignment with best practise coastal management techniques will improve our
     understanding of the lower estuary/ river mouth dynamics.
2.   The SEMP process will allow the investigation of options that are more effective and
     environmentally and financially sustainable.


                                                                                 Page 40 of 107

Section 41

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             8 MAY 2018


3.     The SEMP process will allow a deeper understanding of an area of high interest for
       Council’s Climate Change Adaption Strategy.
4.     Undertaking the bathymetric survey work will allow a greater understanding of the
       dynamics of the river.

Consultation
External Consultation - Community & Stakeholder
     Informal discussions with members of community.
     Pre-lodgement meeting with members of Department of Heritage and Environment
       Protection (now Department of Environment and Science)
     Informal discussions with Coastal Engineers and Scientists.

Internal Consultation

Departments/Sections Consulted:

X    Chief Executive Officer      Community Services                      X   Corporate Services
     Executive Officer            Director                                X   Director
     Executive Support            Community Development                       Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

     Executive Services           Environment & Sustainable Development   X   Infrastructure Services
     Director                     Director                                X   Director
     Community Engagement         Building & Plumbing Services                Asset Management
     Customer Service             Development Assessment                      Buildings and Facilities
     Governance                   Economic Development                        Civil Operations
     People and Culture           Environmental Services                      Disaster Management
                                  Strategic Land Use Planning             X   Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 41 of 107

Section 42

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                            8 MAY 2018


9                        SIX MILE CREEK FLOOD STUDY COMPLETION
DOCUMENT INFORM AT ION




Author                           Project Coordinator – Flooding, Coastal and Foreshores, Daniel Wishaw
                                 Infrastructure Services Department

Index                            ECM / Subject / Flood Studies

Attachments                      Nil



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Project Coordinator – Flooding, Coastal and Foreshores to
the Services & Organisation Committee Meeting dated 8 May 2018 outlining the outcomes of the
Six Mile Creek Flood Model and its associated reports.


REPORT
The purpose of this report is to inform Council that the Six Mile Creek Flood Study has been
completed and outline the outcomes from this study.

1.                       Background

The Six Mile Creek is a tributary catchment to the Mary River that collects water from the Noosa
hinterland region encompassing the urban centres of Cooroy, Pomona and Cooran. This
catchment collects overland water run-off from Cooroy Creek, Cooroora Creek, Lake Macdonald
and other minor tributaries and carries it to the north-western border of Noosa Shire, where it
eventually flows into the Mary River. This flood plain is shown in Figure 1, below.

The Lake Macdonald community had previously raised concerns about flooding and the
perceived worsening of flooding after weather events between 2010 and the major flood event of
February 2012. Whilst houses were not flooded during any of the flood events, the concern
centred on the speed that flood waters rose. Speculation included whether development within
the catchment worsened flood impacts downstream in particular the area around Lake
Macdonald. In response to these concerns Council agreed in 2016 to commission a new flood
study for Six Mile Creek.

Noosa Shire’s previous suite of flood models for this region included individual models for Cooroy
Creek, Cooroora Creek, Six Mile Creek as well as relying on inputs from Seqwater with relation
to the Lake Macdonald dam. This approach adequately covered the major urban centres but
lacked consistency and performance, particularly at the borders of the models. These models
also relied on data sets that did not provide the accuracy of modern sets and used modelling
software and techniques that are now out of date.

The Noosa Shire Flood Management Plan identified a need to upgrade the Six Mile Creek flood
model with the expressed aim of ’using the latest flood modelling techniques and standards that
are consistent with other flood models for the region’.




                                                                                          Page 42 of 107

Section 43

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      8 MAY 2018




                                 Figure 1: Six Mile Creek Flood Plain


2.   Lake Macdonald Flood Working Group Investigation

At the commencement of the study, the Lake Macdonald Community Reference Group was
initiated to provide open communication with the community, through public forums, site visits
and consultation. The concerns from this group centred on the perceived worsening of flood
outcomes from 2010 and the influence, if any, from upstream development and the influence of
hydraulic structures within the flood plain including a new water pipe crossing and water retention
structures. A specific investigation of these questions was part of a sub-report of the Six Mile
Creek project that investigated these questions and looked at potential flood mitigation options
for this community.

To analyse the impact on the Lake Macdonald community due to upstream development, the
report looked to compare two different scenarios; development intensity from pre-2000 as well as
the full allowable development within the Noosa Plan. To make the comparison more
conservative, the future model assumed that no water retention devices would be installed within
new development areas and therefore the full runoff would enter the catchment. While this
comparison showed minor increases in flooding in the Cooroy region (that would be offset by
retention devices), the comparison showed no difference on impact to the Lake Macdonald
community due to the restriction of flow when passing under the railway line at Elm Street.

The Lake Macdonald community also raised concerns that a new water pipe installed adjacent to
Lake Macdonald by Seqwater was creating a blocking affect and subsequently worsening
flooding for their community. To analyse this, the model was varied to include a full blockage up
to the height of the pipe; however, due to the relatively small cross section of this blockage when
compared with the total flood plain, there was no change to peak flood levels.




                                                                                   Page 43 of 107

Section 44

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      8 MAY 2018


As part of this investigation, an analysis of historical flood records was undertaken to establish
the number of events in a given period that was likely to cause flooding. The results showed that
between 2000 and 2009 there was a strong pattern of drought conditions with few rainfall events
likely to result in flooding. However, the period 2010 to 2017 showed a strong pattern of high
rainfall, with 4 times as many rainfall events likely to cause flooding observed. This second time
period included the February 2012 flood that recorded an estimated recurrence interval in the
magnitude of 1 in 500 years.

This report was peer reviewed at every stage of the project by HydarLogic and presented to the
community during a Community Reference group meeting. The community were also provided
material, available on Council’s website, to assist in the community member’s preparedness in
the event of disasters.

3.   New Flood Study Outcomes

The new flood study for Six Mile Creek has integrated the various hinterland sub-catchments of
Cooroy, Cooroora and Six Mile Creek with inputs from Lake Macdonald and various smaller
tributaries into a consistent and technologically superior model. The new model has been
developed using TUFLOW modelling software which is consistent with the approach taken for the
Noosa River flood model and uses a 5m resolution within urban areas and a 10m resolution in
the Six Mile Creek main branch.

The new model is an improvement over the existing modelling for the hinterland catchments in
the following areas:
 Integration: by combining all of the existing catchments in the hinterland into a single model
    we have removed the uncertainty of application, particularly at intersections of the models.
 New data: the new model uses an updated 2016 LiDar terrain model for its base terrain
    elevations which has significant improvements in resolution and accuracy over existing terrain
    models.
 Updated terrain: the new model incorporates the changes in terrain that has occurred
    between modelling projects including the Bruce Highway upgrade and upgraded drainage
    features in Garnet Street and Ashgrove Drive.
 Latest modelling software: improved computing power and modelling software has allowed
    for more accurate flood routing and higher resolution modelling to be completed.

The new model provides Council with an improved tool to:
 Understand the impacts of flood design events ranging from a 50% AEP event (1 in 2 years)
   up to a probable maximum flood (PMF) event, including a design event that incorporates
   climate change effects.
 Undertake flooding investigations such as the investigation of the Lake Macdonald
   community (below) or the upgrading of the Lake Macdonald Dam.
 Have confidence that it is uniformly calibrated and applied across the hinterland.
 Apply with the same tools and confidence as the Noosa River Flood model.

4.   Application of Flood Study

Within the localised area of Lake Macdonald, although no house has been inundated from the
previous flood events, the investigation looked at various flood mitigation options proposed by the
community; including a low and high levee bank, straightening of one and two sections of the
preceding water course and a combination of these. The results showed that the straightening
option provided no benefit and the levee banks provided some benefit that was considerably out-
weighed by worsening effects in surrounding parts of the catchment. As a result the report could
not recommend any mitigation options for this community.


                                                                                   Page 44 of 107

Section 45

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                8 MAY 2018


The results from this flood study will be used to prepare flood hazard mapping for the new
planning scheme and update the disaster management mapping.

The study will also be used to assist with any design of bridge and culvert infrastructure within
the catchment.

Previous Council Consideration
Nil.

Finance
This project was completed at a cost of approximately $135,000 and jointly funded by the
Queensland Government’s Department of Infrastructure, Local Government and Planning’s local
government grants and subsidies program. The State Government provided approximately
$62,000 of funding towards this project through this grant program.

Risks & Opportunities
The work completed in this study reduces the risk to Council planning and disaster management
teams by providing an up-to-date model in terms of terrain modelling, hydrology routing and
modelling techniques and computational ability. The new model presents a unified approach both
within the Six Mile Creek catchment and with the Noosa River catchment that can allow easy
application of planning requirements.

Consultation
External Consultation - Community & Stakeholder
The following consultation was completed with the Lake Macdonald Community Reference
Group:
 Three community workshops.
 On site investigations with landowners.

Internal Consultation
Infrastructure Services
Flood Working Group

Departments/Sections Consulted:

       Chief Executive Officer       Community Services                          Corporate Services
       Executive Officer             Director                                    Director
       Executive Support             Community Development                       Financial Services
                                     Community Facilities                        ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                                  Property
                                     Waste & Environmental Health                Revenue Services

       Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                  X   Disaster Management
                                 X   Strategic Land Use Planning             X   Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                            Page 45 of 107

Section 46

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       8 MAY 2018


10                       OPERATIONAL PLAN PROGRESS REPORT - 3RD QUARTER 2017-18
DOCUMENT INFORM AT ION




Author                           Chief Executive Officer, Brett de Chastel
                                 CEO’s Office

Index                            ECM/ Subject/ Corporate Planning

Attachments                      1.   Operational Plan Progress
                                 2.   Key Performance Indicators


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Chief Executive Officer to the Services & Organisation
Committee Meeting dated 8 May 2018 providing an update on progress with the implementation
of the Operational Plan to 31 March 2018 and details of Council’s Key Performance Indicators.


REPORT
As usual, this quarterly report is in two parts. The first part provides Council with an overview of
progress in implementing the annual Operational Plan. The second part focuses on the Key
Performance Indicators (KPIs) which are reported to Council on a quarterly basis.

To provide context about how our organisational reporting to Council works, the following graphic
is provided:




This report relates to the third quarter of the 2017/18 financial year for the Operational Plan and
some management KPIs.


                                                                                   Page 46 of 107

Section 47

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         8 MAY 2018


1.     OPERATIONAL PLAN UPDATE

Only the major initiatives are included in the Operational Plan with day to day “business as usual”
activities included in Branch Plans.

The Branch Plans are being used by Managers to manage day to day activities. They are an
effective tool for ensuring that all of the “business as usual” activities are undertaken and that any
minor projects are followed through. They are reported to Council by Directors on a quarterly
basis and those reports are on this round of Council meetings.

Details of each Operational Plan project is set out in Attachment 1 with an assessment of
whether the issue in completed, on target or behind schedule. Comments are also provided for
the information of Councillors about the status of each issue. It is important to note that this is
“as at 31 March” i.e. the end of the third quarter and in some instances, the actions have been
advanced further since that time.

There are 30 initiatives in the Operational Plan. The current status of those projects compared to
the previous quarter is:

Status                   Quarter 2             Quarter 3
                      (Oct - Dec 2017)     (Jan - March 2018)
Not started                   2                     1
Behind Schedule               6                     4
On Track                     22                    22
Completed                     3                     6

(Note that some of the initiatives and the Operational Plan have more than one action so there are more
than 30 statuses listed above).

The table below highlights some specific Operational Plan issues that may be of interest to
Council.

Initiatives                   Comment
Compostable dog waste These were rolled out in the first quarter of 2018. They have
bags                  proven to be extremely popular and we have found that many
                      containers have run out sooner than expected due to the high
                      number of bags taken by patrons.
Zero     Emissions   Action The zero emissions action plan was adopted in January and
Plan                        contracts have been let to install solar systems on Council key
                            buildings.
Purchase       of     Johns Site clean-up and restoration was completed in the first quarter of
Landing                     2018.
Yurol and Ringtail Forest Final contracts have been received and are now being reviewed.
project
Park Road Boardwalk           The project has commenced following a detailed tender
                              assessment process.
Rufous Street Digital Hub The building component is now complete and a Digital Hub
Project                   Coordinator has been appointed. The tenancy mix is currently
                          under assessment and will be reported to Council in due course.



                                                                                      Page 47 of 107

Section 48

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                      8 MAY 2018


Initiatives                  Comment
Noosa Transport Strategy     The Schools based program is underway and the Steering
                             Committee has recently examined a series of “quick wins”.
                             Specific teams are working through the individual actions.
Development of the new Drafting is almost complete with cross-checking/quality control
Planning Scheme        underway. Council will hold a Special Meeting (date to be
                       determined) for the purpose of adopting the draft scheme for the
                       State Interest Check.
Development       of     a The commencement of this project was delayed pending the
Regional  Art      Gallery appointment of a new Gallery Director. The Gallery Director has
Strategy                   now been appointed.
Service Level reviews        The majority of “external services” (in addition to some internal
                             services) have been documented and presented to Councillors in
                             a workshop. These will be included in the budget adoption
                             papers.
Implementation of the Our Library Services successfully shifted from the Noosaville
Library Strategic Plan Library and the refurbishment project has commenced.


2.    KEY PERFORMANCE INDICATORS

As Council would be aware, KPIs were first developed for our organisation at the beginning of
2014/15. Approximately 30 management KPIs were developed and these are reviewed on a
monthly basis by Council’s Executive Team. Approximately 15 of those KPIs are reported to
Council on a quarterly basis. They are also reported to the Audit & Risk Committee in detail at
each Audit & Risk Committee meeting.

As far as the CEO is aware, we are one of the few Councils in Queensland to make this KPI
information available to the public via “non-confidential” reports. The KPIs are included in
Attachment 2.

The key issues arising from an assessment of the KPIs for the first quarter are as follows:

Our People
    In relation to Workplace Health and Safety, an external independent WHS Auditor will
      undertake an audit commencing on 17 May 2018. We have requested this audit to provide
      a clear picture on progress over the last few years and to identify any remaining areas of
      concern.
    Personal leave was quite high in the previous quarter due to some long-term illness issues
      with a small number of staff. We have also made progress in relation to the reduction of
      long-term annual leave balances.
    Our staff turnover rate remains relatively low compared to other Councils. In the March
      quarter, staff turnover was negligible. We may see a pattern emerge in the future with staff
      approaching retirement age choosing to retire early in the financial year (the September
      quarter) with the remainder of the year maintaining our traditional low staff turnover rates.




                                                                                   Page 48 of 107

Section 49

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     8 MAY 2018


Our Customers
     Over the last few years, the total number of customer requests received by Council had
       been on an upward trend. However, like the December quarter, we have seen a tapering
       off in the total number of requests received by Council.
     The changeover to new planning legislation in July 2017 had resulted in some reporting
       hiccups with statistics in relation to our Development Assessment processes unavailable in
       the previous two quarters. Those issues have now been resolved and we are able to once
       again report the percentage of planning applications decided within statutory timeframes.
     The average time to process building and plumbing applications is still meeting statutory
       timeframes.

Our Finances
   Our financial KPIs measure solvency, investment performance and outstanding rates. All
     of these KPIs continue to be on track.
   Council receives a financial performance report at the end of each month which provides a
     more detailed analysis of Council’s financial position. Council receives a detailed report on
     capital works progress every quarter.

Our Systems and Processes
   The use of the App – Snap Send Solve continues to grow. The number of electronic
     requests received in January was the highest on record.
   We have also recently introduced “web chat” as a trial enabling customers to “chat” live
     online via our website with a customer service officer.

Previous Council Consideration

The Council receives a report from the CEO on this topic every quarter.

Finance
Nil.

Risks & Opportunities
Nil.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

The details of each of the Operational Plan activities have been provided by relevant
Departments.




                                                                                  Page 49 of 107

Section 50

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                             8 MAY 2018


Departments/Sections Consulted:

X   Chief Executive Officer   X   Community Services                      X   Corporate Services
    Executive Officer             Director                                    Director
    Executive Support             Community Development                       Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
X   Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 50 of 107

Section 51

ATTACHMENT 1




   Page 51 of 107

OPERATIONAL PLAN 2017-18 PROGRESS REPORT                                                                                                                                                               ATTACHMENT 1
THE NOOSA ENVIRONMENT
No. Project                                                            Responsibility                                 Update                                                                          BS) ect)
1    Develop and commence implementation of Zero Emissions             Environmental Services Manager                 The implementation of the action plan has commenced, in particular, the        On track   @
     Action Plan                                                                                                      following items:
                                                                                                                      - Governance structures in place and ongoing;
                                                                                                                      - Annual calculation of Council's footprint ongoing ;
                                                                                                                      - Ongoing regular internal communication ;
                                                                                                                      - Energy audits and development of the Marginal Abatement Cost Curve
                                                                                                                      (complete) ;
                                                                                                                      - Energy efficiency upgrades of lighting underway; and
                                                                                                                      - Procurement and Installation of Solar Systems at the NAC, The J, the
                                                                                                                      Depot and the Noosa Leisure Centre has commenced.
2    Implementation of Zero Waste Strategy:                                                                           Roll out of 10,000 green waste bins has been completed with the              Completed    e
     - Roll out of Garden Waste Recycling Bins                         Waste & Environmental Health Manager           collection of these bins commencing in the first week of Sept. 2017.
     - Introduce compostable dog waste bags                            Local Laws Coordinator                         Roll-out of new bags has been completed.                                     Completed    @
3    Ongoing   negotiations  with  the  Queensland    Government       Environmental Services Manager                 Initial negotiations have occurred with the Queensland Government and  Behind Schedule     Oo
     regarding Noosa River management                                                                                 will continue to be progressed through the development of the Noosa
                                                                                                                      River Plan. The Draft Noosa River Plan is in the final stages of
                                                                                                                      development.
4    Pursue potential Yurol and Ringtail Forests environmental         Chief Executive Officer                        Final contracts have been received and are currently being reviewed.           On track   @
     project
5    Assist Noosa Biosphere Reserve with the UNESCO Biosphere          Environmental Services Manager                 Staff are currently participating in a monthly meeting as part of the          On track    Qe
     renewal process                                                                                                  Biosphere Periodic Review Advisory Group to support and provide
                                                                                                                      information into the review and renewal process. The final document will
                                                                                                                      come to Council for consideration.
6    Finalise Environment Policy and Strategy and commence            Director    Environment    &    Sustainable     Work is progressing with a scope being prepared for presentation to    Behind Schedule    @
     implementation                                                   Development                                     Council  before  June   2018.   Significant background  drafting and
                                                                                                                      consultation work has already been undertaken.

THE NOOSA COMMUNITY
No. Project                                                            Responsibility                                 OF ote FC                                                                        LT
1    Implementation of Social Strategy:                                Director Community Services                    Purchase of Johns Landing finalised 22 November 2017. Demolition of          Completed    @
      - Purchase of Johns Landing and transition of long term                                                         buildings and final clean up finalised in March.
     residents to alternative accommodation
      - Finalise development of Arts and Cultural Heritage Plan and    Director Community Services                    Draft plan scheduled for completion end of April 2018.                         On track    Qo
     commence implementation
      - Finalise development of Sport and Recreation Plan and          Director Community Services                    The final plan endorsed by Council in the October round of meetings.         Completed    @
     commence implementation
2    Commence community consultation for an iconic playground at       Infrastructure Planning, Design & Delivery     A draft project management plan has been developed which includes              On track   @
     Cooroy                                                            Manager                                        stakeholder analysis, communications requirements, reporting and metric
                                                                                                                      collections.
3    Implementation of Library Strategic Plan                          Libraries and Galleries Manager                Noosaville Library refurbishment and Radio Frequency Identification            On track   @
                                                                                                                      technology implementation underway.
4    Partner with the Cooroy Memorial Hall Committee for building      Infrastructure Planning, Design & Delivery     Asbestos removed from the building and restoration works completed.          Completed    @
     restoration and refurbishment                                     Manager                                        Public opening on 21 April 2018.
5    Develop a Regional Art Gallery Strategy                           Libraries and Galleries Manager                Development of the Regional Gallery strategy will commence in 4th            Not started  2
                                                                                                                      Quarter 2018 following the appointment of the new Gallery Director and
                                                                                                                      the finalisation of the Cultural Plan.

                                                                                                                                                                                                               Page 51 of 107

Section 52

Page 52 of 107

THE NOOSA ECONOMY
No. Project                                                            Responsibility                                Update                                                                           Status
1    Commence renewal of Park Road boardwalk                          Infrastructure Planning, Design & Delivery     The Principal contractor has been appointed, construction to commence          On track   @
                                                                      Manager                                        in the second half of April.
2 _ Finalise construction of Rufous Street Digital Hub project (Stage Economic Development Manager                   Construction of the Digital Hub building and restoration of the surrounding    On track   @
     1) and adoption of hub operating model                                                                          parkland completed. New Director of Digital Hub appointed. Tender for
                                                                                                                     tenanting of Digita Hub underway.
3    Continued   implementation  of  Local  Economic   Plan _ incl.   Economic Development Manager                   Continued to deliver on Local Economic Plan Priority actions, highlights       On track   @
     providing support to existing industry representative groups and                                                include:
     evaluation of peak body models                                                                                  - The launch of the Economic Grants Program and guidance being
                                                                                                                     provided to a range of industry representative groups on potential
                                                                                                                     initiatives; and
                                                                                                                     - Strong industry engagement in relation to the development of the New
                                                                                                                     Planning Scheme.

LONG TERM PLANNING FOR NOOSA SHIRE
No. Project                                                            Responsibility                                Update                                                                           SELL)
1    Finalise drafting of new Noosa Planning Scheme and obtain        Planning Scheme Project Manager                Drafting is nearing completion. Content now being extensively reviewed.        On track   @
     Queensland Government approval                                                                                  Councillor workshops have continued through this quarter. The formal
                                                                                                                     notice from the Chief Executive of the Department of State Development,
                                                                                                                     Manufacturing, Infrastructure and Planning in response to Council's
                                                                                                                     resolution under the Planning Act was received late in the quarter.

2    Develop Climate Change Adaptation Plan & actions (Stage 1)       Project Coordinator - Climate Change           Coastal hazards adaptation plan project on schedule.      Stakeholder          On track   @
                                                                      Adaptation                                     engagement has been initiated.
3    Finalise Noosa    River  foreshore  management     plan  and     Property Manager                               Draft Master Plan public consultation completed. To be reported to             On track   @
     commence implementation                                                                                         Council shortly.
4    Complete detailed asset management plans for identified pilot    Asset Planning Manager                         Noosa Aquatic Center Asset Managment Plan (AMP) adopted by Council             On track   @
     areas and commence development of asset management plans                                                        in March & Slurry Systems AMP adopted by Council in April. Roads &
     for the remaining infrastructure classes                                                                        Bridges AMP's drafted for completion at the conclusion of the revaluation
                                                                                                                     period to factor in adjusted unit rates and depreciation. AMP's expected
                                                                                                                     to be presented to Council in June round of meetings.

5    Commence implementation of priority actions from Council's       Director Infrastructure Services               Consultants engaged to undertake investigations into the key priorities.       On track   @
     Transport Strategy                                                                                              Working   Groups and Steering Group have been         established.  A
                                                                                                                     Councillor Workshop to discuss ‘quick wins' undertaken on 19 April 2018.

6    Commence     detailed design   of  North  Shore   Beachfront     Property Manager                               Detailed design is in progress with construction due to commence in            On track    7)
     campground redevelopment including environmental restoration                                                    2018/19.
     works
7    Review of Noosa Community Support operating model in             Community Facilities Manager                   Discussions with the Federal and State Funding agencies regarding the        Completed    @
     preparation for new funding arrangements                                                                        operations of   Noosa Community Support undertaken and current
                                                                                                                     business model is to continue.
8    Development of a robust 10-year Capital Works Program            Asset Planning Manager                         5 year capital program drafted for budget consideration. 10 year capital       Ontrack    @
                                                                                                                     program to be complete by the end of June.

                                                                                                                                                                                                    Page 52 of 107

Section 53

Page 53 of 107

EXCELLENCE AS A COUNCIL
No. Project                                                            Responsibility                                  Update                                                                           Status
1    Develop a master plan for the Tewantin administration building    Director Infrastructure Services                This project is being scoped with a project plan to be developed. Issues Behind Schedule   @
                                                                                                                       and options will be considered and a needs analysis undertaken to
                                                                                                                       determine office accommodation requirements.
2    Negotiate new employee Certified Agreement                        People and Culture Manager                      Council and unions have agreed in principle to the terms and conditions         On track   @
                                                                                                                       of the new Certified Agreement. The Agreement is to be put to staff for a
                                                                                                                       vote shortly.
3.   Test and review Council's Business Continuity Plans               Govemance Advisor                               Business Continuity Plan owners are currently in the process of reviewing       On track   @
                                                                                                                       adopted plans and educating team members with BCP responsibilities on
                                                                                                                       associated requirements. Governance Advisor is undertaking desktop
                                                                                                                       testing with BCP owners.
4    Focus on continuing to develop our organisational culture and     Chief Executive Officer                         Leadership Group undertook a workshop in third quarter regarding                On track   @
     values                                                                                                            ongoing development of our organisational culture.      A successful
                                                                                                                       Certified Agreement process has also assisted.
5    Continue   TechnologyOne     CIA   transition including  core     ICT Manager                                     Completed   Enterprise Budgeting   system  implemented.   Progressing   Behind Schedule    @
     enterprise suite conversion and planning for property and                                                         enterprise cash receipting and property, rating and financials.
     compliance transition
6    Review of general rating structure and rating concessions         Revenue Services Manager                        Workshops held with Councillors regarding general rating structure.             On track   @
                                                                                                                       Modelling of valuation impacts in progress.

7    Continue to provide excellence in customer service                Director Executive Services                     Snap Send Solve contacts and online e-requests continue to increase             On track   @
                                                                                                                       call volumes. The Webchat system is being piloted.

8    Commence a review of service levels for key Council services      Executive Officer                               This is a staged project to compile service level listings for all services.    On track   @
                                                                                                                       Most external services and some internal services have been completed.

                                                                                                                                                                                              Page 53 of 107

Section 54

ATTACHMENT 2




Page 54 of 107

Bas              3   8    8    alSseeal    S28       cou S a BRS R/EEZE IO O
        $3         °   ra}  ro    oS  °) 538      aes                             238          az
       fof                   mee                  ad                 .             stale g
          3                 I            oa 2     232    %@                        2%a     a Qo
       22 | 2 + fee                      2s |     22   | %            “he,         22 |B =
         oO                              2g —       a                              a
         sf   =                          &  o     Zo                      >        2| \ct
       re     ig tT 2                    lta |    ce | Se                3        ea       |e
       e      8                             -     oa                      a                 Uv >
       3g                                   al |  a2                  -               5       o
       a         ;                       Bs | Ee          @ igh                       :       2
         o                               2         5                                  a
         :     4                         B53)     28   | % he                         5       :
         &    9                          s  8     as                 .                 :
         $b    @   Ly                    z5\|     ** | oh              “he            5       2
                                                  8                   *               °       m
         a    5                                     a                     «
         ey                              3         3      6              :                    5
         Pils                            :          z                                         =
         g    TN                         g          ai                  %,                    <
         2      %                        <          a    %                >                   a
  .      Bae         ee ee               :         2      a                                   oO
         Oo                     ~                   -
  o           g
  a      g | §                :          g          ~                      *.                 a
  .      2    5             x |                     &    %,                  *                m
  a      2    ¥               *                     3                                          oO
         -_—~ 3                                     a                                         —
  :             %              :                    Z    %                 y                  z
  ¢      *                   |                      2                                         a
  2
  =
  a
  :
  2
  3    ecg        co =  N   OO  RF HD OD geo         s                             gece
  a    ag                                Qa                      -_                   c
  a}   8832|   %                         51815       z|   2      z       2      # | SiBia\g
  a    2232                              =|) a       3            {      '      ; | Se=6
  3]   Be                                8  3           8                       i  lig) |
       es                                2  5           =                          BIS
       38 | %                 .          Aas                      =;            ilk
  o    =O                                   _            -_-             '      1 2   0
  =|   gs                                ails                     7      !      !
  i]   32 | %                            i              3                       a
  =    cay                    e                                          '      1
         :                    :          2  3           g                |      |
         z    %,              :          &  F           a                i
         <     %             ,           $s 3
                                            oO                    ‘      '      '
         :                               =  3           8                       !
         3                               a  =           =
         5     %                         s              g
         ®                               a              ~         :      '      {
         x     a                         3                        ,      '      '
         fi,”                            a                         ee
         2    %                          z              8
         3                               2              x
                                         2              o                '      '
         :    %                          g
                                         =                        ‘      '      '
         a                               3              nN               '      \
         ; | *                           .              2                !      !
         °    %                                         ®
               %

                                                                                           >
3                                                                                          4
.                                                                                          >
 oO
3                                                                                          2
 o                                                                                         =
S.                                                                                         rm
g                                                                                          5
 “                                                                                         No

Section 55

Page 55 of 107

Measure
  Staff turnover rate as percentage  of establishment level
Purpose
  To track staff turnover over time and identify trends
 6%           *,
                 ee,
                     oJ
                      *.
  4%                      °,
                            °                     *
                             *.        ween” *e,
                               *ognet®                *e,
                                                          %,
 2%                                                           *
                                                                  s

  0%
             Sept             Dec              March             June
  Comment
  2016/17 annual figure is 8.9%
  2015/16 annual figure is 13.06%
  2014/15 annual figure is 11.06%
 Annual average for category 4 Councils (2014) is 10.6%

                                                      2015/16 data is shown by dotted purple line. 2016/17 data is shown by black line

                                                                                                                                                                         Page 55 of 107

Section 56

Page 56 of 107

OUR CUSTOMERS
Measure                                                                           Measure
Number of requests received x month                                               % of requests completed within target date x month
Purpose                                                                           Purpose
Level of customer demand & whether service levels appropriate                     Indicator of whether service levels are satisfactory
2250                                                                              100%
2000                  Ss                        _
 1750                                     |     SS                                 80%
 1500 rp       =    g      i            7    f-.   .                                                               a.                        o*    s
 pen        oN          die oh              Mee                                    won           BReowek                   So
                                                    Saanete                                                                       Ny        2
 oo |
  sia          eee            ee
                                                                                   40%
 500                                              ———_—_—___
  250
    om         eee                  ee                                             20%                                                ee
       July Aug Sept Oct   Nov Dec   Jan  Feb March April May June
                                                                                    0%
   a All others          @ Local Laws          @ Parks                                   July Aug Sept Oct    Nov  Dec   Jan  Feb March April May June
   & Waste Management    ®& Works Operations   @ Environmental Health
Comment                                                                           Comment
Categories show the 'Work Groups' that on average receive the highest number of
requests each month.

Measure                                                                           Measure
Average seconds of wait time in phone queue                                       % of planning applications decided within statutory timeframe
Purpose                                                                           Purpose
Service timeliness / capacity to respond                                          Service timeliness
 120                                                                               100%
                                                                                    80%
  90
                                “*,             oJ                                 60%
  oo |      ten                     “tN
                                    *.          oe                                                                                                  —
               FE             Va                                                    won
 30                                :    :    i                                      20%
   0                                                                                 0%
     ss              of             FS                    Se                                      Jan                 Feb                March
     3     we ea         “     &         <         i w       s                      @MCU wReconfiguration wOp Works mOp Works (Veg) @DBW @RAP uwTotal
                                                                                  Comment

                                                2015/16 data is shown by dotted purple line. 2016/17 data is shown by black line
                                                                                                                                                           Page 56 of 107

Section 57

Page 57 of 107

Measure                                                                     Measure
 % of building information requests completed within statutory time frame
 Service timeliness                                                          Level of activity & service
                                                                              20
  100%                         a  2%    ,         see    nae
        Di                    niy                                             :                                  —~S-
   ~                                                                             :   \    z     ihe      u    oe                  ;      7
                                                                                                                                    *    *
                                                                                                                                    *
     eee                                                                       ne
        BEGEEEEE
        July Aug Sept Oct Nov Dec Jan Feb March April May June                   »     we  s         “    &     e   <    we  rf aa      ys
    0%                                                                                           &                   &

 Comment                                                                     Comment

                                             2015/16 data is shown by dotted purple line. 2016/17 data is shown by black line

                                                                                                                                               Page 57 of 107

Section 58

Page 58 of 107

8       o    Nn   2B  ©   @    3|sis¢         = 58      o    NM   hURhlUDlU®       | 382       o
            °                                 Z=vs=e      Zsa       °    °    °    °    °    -|/ 0956
                                               uo Big     52        RF    Re  #    &    z    Fi| ovo       c
            z    ¥%                           £gac        = 33                                   3225      >]
            g    %                            6824        $338                                   zo356
                                              2   0       3       =                              311s      as
                                              °   f       o       <                              o  2
                 %                            sie         26        1     |                      2  5      a
                                 :            a   oF      0B      >                              5  |S     >
                                 .            =   9       °                                      2
                                 .            a   —       £3      &                              <  £      za
                 %               2            °   9       go        4                            a  3
                  qe             .            >   =       “Fs     a                              i)        ©
                                  *           ©   6               ©                              a         m
                                  *           2.            iM    z                              =~ NN
                                  *           5   v                ~~!                           a5 Mn     w”
                  %&               eo         Qo  ro        z                                    a   So
                                   G          w             o     9                             &   &
                                   2          o   =>        3                                    Ss »
                                  ,           31  5         5     ~                             34°C
                 %                *           ®   3         &       1     I                      =  9
                                  |           a   oO        a     2                              =  <
                                              <   a         Sg    2                              5  o
                 %,              .                          g       Lael                         *  8
                                 *                          a     9                                 3
                                 *                          =     °       Ml                        9.
                                                            °       4
                 %                                          s     |g               :                :
                                                            a             ,                         ~
                 “a                                         o       1                               —
                  :                                         s     |¢                                5
.               %                                           o     jet        XY    a,
                                                            o     D                  +               wo
°                                                           ao    =                   2             o
a                                                           =     S$                 *              3
a                %                                          z     >]                 *              x
a                              :                            &     3                 b,              2
a                                                                   |                °              =>
a                %            .                             2     =                   *e,           a
ao                            =                             5     2                                 @
 a                            ot                                  <                    *            <
2                s            ®                             3       4                  *            —
5               %,            =                             a     <                   *
c                                                           o     5                   *
z                                                                 ®            |
a                             |   |                         2       J
=
a
a
uv
c
3
s
a
nN
oa
3                                                             °                       *       a|/=3WD=E
2g                                                            2        °      a       So      a|g5oe
=                                                             3        z      z       &       F/S8a8
2                                                             3                                  C8 a §
“*                                                            sg    y                            coro
a                                                             =     %                            2  3
a
&                                                                                                a  S
3a                                                                                               oO
3                                                                  %                             2  a
g                                                                                                g§ 6
5                                                                  %,                           <A
9°                                                                                               °  a
x                                                                                                ~   4
=                                                                                                oO
3
a                                                                   %                            :
                                                                    %                            3
                                                                                                 >
                                                                    %                            3
                                                                                                 2
                                                                                                 =
                                                                                                 2
                                                                    %                            =
                                                                    %                            a
                                                                                                 wv
                                                                    a                            2
                                                                    %                            a
                                                                 %,                   |          Z
                                                                   a,
5	1	1	1	87	2	1922	2528	1	82	92	|
5	1	1	1	87	3	2121	2564	23	31	36	5
4	1	1	1	88	0	2127	2596	17	14	-1	
5	1	1	1	88	1	2127	2596	17	14	34	w
4	1	1	1	89	0	1542	2619	50	66	-1	
5	1	1	1	89	1	1542	2619	50	66	50	by
4	1	1	1	90	0	1541	2711	50	54	-1	
5	1	1	1	90	1	1541	2711	50	54	91	%
4	1	1	1	91	0	1534	2800	54	53	-1	
5	1	1	1	91	1	1542	2796	18	72	25	%G
4	1	1	1	92	0	159	2962	34	26	-1	
5	1	1	1	92	1	168	2957	11	41	58	vu
4	1	1	1	93	0	158	2991	26	23	-1	
5	1	1	1	93	1	158	2991	26	23	0	®
4	1	1	1	94	0	149	3017	35	23	-1	
5	1	1	1	94	1	160	3013	9	36	43	ea
4	1	1	1	95	0	158	3044	26	23	-1	
5	1	1	1	95	1	166	3040	9	36	44	oO
4	1	1	1	96	0	158	3083	34	23	-1	
5	1	1	1	96	1	158	3083	34	23	52	o
4	1	1	1	97	0	158	3108	34	23	-1	
5	1	1	1	97	1	158	3108	34	23	82	©
4	1	1	1	98	0	158	3147	26	25	-1	
5	1	1	1	98	1	158	3147	26	25	37	°
4	1	1	1	99	0	159	3174	34	15	-1	
5	1	1	1	99	1	159	3174	34	15	40	=>
4	1	1	1	100	0	159	3205	33	15	-1	
5	1	1	1	100	1	166	3201	7	27	0	—_
4	1	1	1	101	0	158	3228	34	23	-1	
5	1	1	1	101	1	172	3224	9	36	48	So
4	1	1	1	102	0	159	3250	38	31	-1	
5	1	1	1	102	1	159	3250	38	31	13	~/ 2

Section 59

Page 59 of 107

OUR SYSTEMS & PROCESSES

Measure                                                                                Measure
% of requests for service that were lodged electronically                               % of payments made electronically
Purpose                                                                                Purpose
Identify growth of online services                                                     Identify growth of online services
40%                                                                                     100%
                                                                                        90%                                   a             bl
sos                                                                                      ox        Le
                                                                                         ow        ee
                                                                                         cow LL
 20%
                   =               =     i             etteeetene,                      50%
 10% | ae”                    hs                   hs                                    oe 7
                                                                                         30%                                                   —————————————
                                                                                        20%    |                                               a
  0%                                                                                     10%
       July Aug Sept Oct     Nov  Dec   Jan  Feb March April May June                     0%   I   i    i     7     |    7     7     |   a
             wE requests  Email (incl. requests via mobile applications)                        July Aug Sept   Oct   Nov  Dec   Jan  Feb March April  May June
Comment                                                                                Comment
Note: 2015/16 data excludes requests received via email (including via mobile          This KPI includes all payments made to Council via electronic means (including BPAY,
applications)                                                                          direct debit, via Council's website, at Australia Post outlets etc)

                                                   2015/16 data is shown by dotted purple line. 2016/17 data is shown by black line

                                                                                                                                                              Page 59 of 107

Section 60

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                          8 MAY 2018



11                       COMMUNITY SERVICES DEPARTMENT UPDATE - 3RD QUARTER 2017-18
DOCUMENT INFORM AT ION




Author                            Director Community Services, Alan (Fox) Rogers
                                  Community Services Department

Index                             ECM/ Subject/ Branch Manager/ Community Services

Attachments                       Nil.


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Community Services to the Services & Organisation
Committee Meeting dated 8 May 2018 providing an update on operations of the Community
Services Department for the period 1 January to 31 March 2018.


REPORT
The adopted organisation structure includes the following branches under the Community
Services Department:

                       Community Development and Community Grants;
                       Community Facilities (Including Noosa Community Support, The J, Bicentennial
                         Community Centre, Noosa Aquatic Centre and Noosa Leisure Centre);
                       Directors Office;
                       Local Laws;
                       Libraries and Galleries; and
                       Waste, Environmental Health and Cemeteries.

This report provides a brief summary regarding recent performance, current priorities and future
initiatives for the Community Services Department.




                                                                                       Page 60 of 107

Section 61

COMMUNITY SERVICES DEPARTMENT

BRANCH ACTIVITIES                   RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                             THE NEXT QUARTER
COMMUNITY DEVELOPMENT
Develop and adopt the Noosa Shire      Successful delivery of the Queen’s         Review the 2006 Social Charter to            Initiate and facilitate first aid training
Social Strategy                          Baton         Relay        Community         ensure that it has sufficient focus on         for Heart Week for community group
                                         celebrations –it is estimated that           social justice and inclusiveness.              members
                                         there 10,000 people attended.              Application for master planning of           Implement actions from Arts and
                                       Hosted South-East Queensland                 Noosa and Cooroy sports complex’               Cultural Plan
                                         Local Government Sport and                   under the Get Planning Spaces                Implement actions from Sport and
                                         Recreation Forum in March 2018.              State Government funding program               Active Recreation Plan
                                       Noosa Sport and Active Recreation          Next Grow your Arts workshops                Create and facilitate event for
                                         Implementation Plan adopted by               (How to write a grant application,             National Volunteer Week
                                         Council.                                     QMusic partnership, looking at               Prepare a community status report
                                       Successfully launched the State              SCRC partnership for Arts Law                  based on outcomes from CPRT and
                                         Government funded Get Out Get                workshop in May)                               the wellbeing indicators for inclusion
                                         Active (GOGA) Program (Women’s             Current format of Youth Network                in Council's Annual Report
                                         physical activity program for 18-24yr        meetings to be revisited.                    Develop an on line tool that reports
                                         olds.                                      Lease negotiations with Cooroy                 on the social data for the Shire that
                                       Successfully launched the Game on            Memorial Hall Committee                        can      be    shared       with     local
                                         Qld funded (GOGA) Program                  Collaborative planning for Food                organisations
                                         (Teenager physical activity program          Bank in Noosa to support Breakfast           Assist United Synergies in the
                                         for 13-17yr olds).                           Club and emergency relief.                     planning of Booin Gari Festival –
                                       Full-Time Community Development            Grow Your Arts partnership with                September 2018
                                         Officer     –      Eadie      Hancock        Noosa      Gallery    for   Artist   in
                                         commenced as Kylie Finigan                   Residence (June/July)
                                         working part-time for next 12              Coordinate youth activities/network
                                         months.                                      and research into the pluses and
                                       Facilitated     Noosa      Community         minuses of a Junior Council and also
                                         Roundtable February 2018                     into mechanisms that other Councils
                                       Started review of Social Charter.            are using to garner young people’s
                                       Submitted nomination for LGMA                input and involvement in Council
                                         Excellence Award – Collaboration             business.
                                         Category for Noosa Community               Launch the State Government
                                         partnership Roundtable – Johns               funded Get Out Get Active (GOGA)
                                         Landing.                                     Program (Women’s physical activity
                                       Sixth edition of 'Grow your Arts'            program for 40 plus.
                                         quarterly e- newsletter distributed.       Support consultation process for the
                                       Promoted the Game on Qld funded              draft Cultural Plan
                                         (GOGA) Program (Come and Try
                                         Adventure Racing) – 100 places

                                                                                                                                                           Page 61 of 107

Section 62

BRANCH ACTIVITIES                   RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                            THE NEXT QUARTER
                                         filled in 12 hours. Date to be held –
                                         27th May
                                       Grow Your Arts program partnering
                                         with QMusic to organise 2 Industry
                                         Connect workshops at The J
                                       Arts Breakfast with Sunshine Coast
                                         Creative Alliance – Peppers Resort
                                       Facilitated first quarterly Northern
                                         Sunshine Coast Network Meeting for
                                         2018 (15 individual social service
                                         organisations attended)
                                       Distributed second annual Sunshine
                                         Coast Volunteering Survey on behalf
                                         of     Sunshine Coast Volunteer
                                         Stakeholder Reference Group
Council Community Grants Program,      All unsuccessful and successful              Processing grant payments and               Assess & present recommendations
including RADF                           notifications (with agreements and             funding agreements from Round 8               for Round 9 Community Project and
                                         claim instructions) sent to grant              98% complete.                                 RADF grant
                                         applicants for the final round of            There are no overdue acquittals.            Prepare to request acquittals,
                                         2017/18 Community Project Grants             Closing Round 9 of Community and              assess and make next year
                                       3rd Grow Your Arts - Find Your Arts            RADF grants (closing 12th April)              payments to the 81 recipients of
                                         Funding info session in Feb with             Applicant support for RADF and                multi-year grants (Alliance, Festive,
                                         presenters from Australian Council,            Community Project Grants programs             Signature Events, Halls and Sports
                                         Arts Qld, council and local artist – 55      Ongoing assistance to Economic                Field Maintenance)
                                         attendees                                      Development users as and Regional           Plan and present for Grants Nibbles
                                       Support grant applications for                 Gallery users.                                and Network Night
                                         community grants and RADF                    Water Rebates for Unitywater-direct-
                                         applications through phone calls and           billed NFPs paid for FY 2017/18
                                         meetings                                     Contributing to new South East
                                       RADF application to Arts Qld for               Regional Funders Hub
                                         2018-19 program submitted                    Organise follow up how to write a
                                                                                        grant application workshop in April in
                                                                                        partnership with CQU
                                                                                      Community       Development      team
                                                                                        assisting sporting, cultural and
                                                                                        community groups with their external
                                                                                        grants
                                                                                      Ongoing contribution to Australian
                                                                                        Institute of Grant Management
                                                                                        Forum


                                                                                                                                                         Page 62 of 107

Section 63

BRANCH ACTIVITIES              RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                           THE NEXT QUARTER
Grants - external                 Assisted local sports clubs in               Ongoing – administering Council’s          Map external grant opportunities
                                    applying for the State Government              Grants Register (currently 71              Review Grant Processes and draw
                                    Female Facility Grant program.                 external grants across 30 Cost               up & publish Flow diagrams
                                    Successful applicants announced                Centres)
                                    mid-March.                                   Shared Noosa Council’s External
                                  Assisted community groups to apply             Grant processes and register with
                                    for Gambling Community Benefit                 Central Qld Council.
                                    Grant.
                                  Successful with Game on Qld.
                                    Grants for: Commonwealth Gala
                                    Sports Day, Come and Try
                                    Adventure Racing, Active Teenagers
                                    Program
                                  Grant      success       also     with:
                                    Commonwealth Games Embracing
                                    2018     Sports     Assets     Legacy
                                    Program, Queens Baton Relay
                                    Community Celebrations
                                  Assisting    Infrastructure    Project
                                    Managers with DILGP processes
                                    and forms
                                  Assisting various officers to have
                                    access to various government grant
                                    portals.
                                  Supported cultural groups to apply
                                    for external grants including Building
                                    Better Regions and Regional Arts
                                    Fund.
Business as Usual activities      Participated in 2nd Strategic Planning       Finalise tenure and assist with            Continue to work with the State
                                    forum with Cooroy Memorial Hall                security upgrade – SHINE,                    Government       (Department      of
                                    Committee.                                   Negotiate    tenure   of    Pomona           National Parks, Sport and Racing) to
                                  Provided advice to Pomona Men’s                Kindergarten                                 deliver events in Noosa as part of
                                    Shed on tenure and governance                Negotiate tenure change Cooroy               the Building Active Communities
                                    issues.                                        Pomona Lions Club                            program.
                                  Provided      advice      to    Noosa        Renegotiate tenure for Rotary Club         Finalise works being carried out at
                                    Community Gardens on tenure and                of Noosa Heads over Tait-Duke                the Girraween Sports Complex to
                                    governance.                                    Community Cottage to coincide with           provide a face lift to the clubhouse
                                  Joint consultation with Parks &                new Council bike path project.               and amenities.
                                    Gardens      regarding      community        Facilitate expression of interest for      Rolling out and training Team
                                    planting project at Cooran.                    Community-hub service sharing in             Collaboration tool (SmartSheet) to
                                  Respond to request for new                     Tait-Duke Community Cottage.                 all members of the team.

                                                                                                                                                   Page 63 of 107

Section 64

BRANCH ACTIVITIES   RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                          THE NEXT QUARTER
                         community garden at Sunshine              Assess Inaugural Sunshine Coast
                         Beach.                                      Open House program and consider
                       Prepared and distributed the 13th           Noosa’s involvement in the 2018
                         edition of the quarterly Community          event
                         Connections e-newsletter to not for       Continue to support Pomona Arts
                         profits.                                    Inc. new committee following AGM
                       Delivery of State Government                to better manage Majestic Theatre,
                         (Department of National Parks,              Railway Gallery and Markets
                         Sport and Racing) events in Noosa         Negotiate expired lease for Kin Kin
                         as part of the Building Active              Tennis Club.
                         Communities program: Advanced             Negotiate user-agreement (license)
                         Sports Strapping                            with Tewantin Noosa Cricket Club
                       Noosa District Sports Complex and           for amenities block at Read Park,
                         Cooroy         Sports        Complex        Tewantin
                         Management meetings held.                 Finalise Lease agreement with the
                       Attend Pomona Arts Inc AGM 24th             Kin Kin Tennis Club.
                         March                                     Negotiate tenure for Girraween
                       Attend Noosa Arts and Crafts                Sports Complex
                         monthly meetings                          Provide assistance in planning of
                       Noosa Shire Arts and Crafts tenure          Cooroy Fusion Festival
                         finalised                                 Attend future monthly meetings for
                       Delivery of State Government                Sunshine Coast Open House to
                         (Department of National Parks,              support Noosa involvement in this
                         Sport and Racing) Building Active           region wide event
                         Communities event in Advanced             Attend future quarterly meetings for
                         Strapping                                   the Sunshine Coast local Level
                       Develop budget for 18/19 financial          Alliance Steering Committee.
                         year.                                     LDMG      Welfare     Sub-committee
                       Participated in case study of Orange        review and change of format,
                         Sky Laundry – Noosa Service with            combining     with   Northern   SC
                         collaborating partners Dept Housing,        Network Meeting (Welfare agencies)
                         St. VdP, Centrelink, Red Cross. For         Recovery Training planning for
                         State and national recognition.             future meeting.
                       Attended 3 meetings for Sunshine
                         Coast Open House 2018
                       Participated    in   CALM      Noosa
                         quarterly meeting and promoted
                         awareness for drink spiking.
                       LGDM Welfare Sub-committee and
                         Recovery Committee meetings held.


                                                                                                                           Page 64 of 107

Section 65

BRANCH ACTIVITIES                            RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                             THE NEXT QUARTER
                                                Facilitated  partnership   between
                                                  Noosa Residential Aged Care and
                                                  Noosa Flexi School – Generations
                                                  Café social enterprise. Launched in
                                                  April 2018.
COMMUNITY FACILITIES
Noosa Aquatic Centre
Investigate ways to enhance the                 Approval of a major emission               Removal of redundant solar pool              Install and commission the system.
centre’s sustainability practices to              reduction strategy - PV solar power          water heating from the roof.                 Media awareness of the project and
achieve Council's Emission Reduction              generation.                                Replacement       of   original    roof        its outcomes.
Policy goals.                                   Tenders have been assessed and               sheeting prior to new installation.
                                                  a contractor appointed for the
                                                  installation of a Solar PV system.
Create improved        family   change          The result of a Learn to Swim              Outcome     of   application was             If funding application is successful,
facilities                                        survey identified improved family            scheduled for February 2018                    commence detailed design and go to
                                                  change space as a key priority.              announcement by state government               tender. If not, seek alternative
                                                Funding application completed for            but remains unknown.                           funding sources for the project.
                                                  Qld State Governments ‘Female
                                                  Facilities’ funding program as part
                                                  of the ‘Get in the Game’ funding
                                                  program.
                                                Application submitted 1/12/17.
Develop a detailed centre Asset                 Finalisation      of     the    Asset      Implementation and adherence to              Continue to conduct an internal
Management Plan as a pilot project for            Management Plan as a pilot project           existing maintenance schedule.                 cost/benefit analysis on some
Community Facilities.                             for Community Facilities.                                                                   recommendations and implement
                                                Combining of Building Condition                                                             recommended actions.
                                                  Assessment and the Roejen Pool
                                                  Plant Condition Audit into draft plan
                                                  document.
                                                Ensuring recommendations are fed
                                                  into future years’ planning.
Operate facility in line with the endorsed      The NAC $197k ahead of YTD                 Retain     close     monitoring    of        Continue with tight management
budget                                            revenue target.                              occupancy levels for both Learn to             practices to ensure a favorable
                                                YTD expenditure is $31k under                Swim & Group Fitness/Circuit                   result against the predicted budget.
                                                  budget.                                      classes to ensure maximum financial
                                                Net YTD position is a positive               performance.
                                                  variance to budget of $228k.               Finalise 18/19 financial year budget.
                                                Draft budget finalized for 18/19
                                                  financial year.

                                                                                                                                                                 Page 65 of 107

Section 66

BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                          THE NEXT QUARTER
Commence work on a 10-year facility                                                          Team planning day scheduled for           Refine ideas from planning day.
masterplan.                                                                                    May 2018.
Business as Usual activities                   Completion of website development           Implement     standard    Term     2      Voting to be conducted on the NAC
                                                 and launch.                                   operations following the Easter             L.A.W.A
                                               Welcomed our first group of                   school holidays.                          Evaluate applications & appoint
                                                 Chinese High School students for            Complete building the ‘back end’ of         successful operator for the NAC café
                                                 swimming lessons.                             the time and attendance system,             lease. Contract to commence 1 July
                                               Welcomed the New Zealand Para                 Tanda, with trial planned for mid-          2018.
                                                 Olympic and Great Britain Triathlon           April.                                    Continue with the development of
                                                 teams for Commonwealth Games.               Trial of two new classes in our             the NAC’s “Watch Around Water”
                                                                                               Group Fitness program. Water                program aimed at           enhancing
                                                                                               Resist (Aqua Cycling) & Aqua Stick.         swimmer safety particularly focused
                                                                                             Planning and preparation for School         on the under 5’s.
                                                                                               Carnivals.
The J & BCC
Investigate ways to enhance the centre’s       Confirmed upcoming installation of          Installation of Lighting Control 4        Staff training and activation of the
sustainability practices to achieve              new solar panels to The J and                 system in April.                            Control 4 system to achieve
Council's Emission Reduction Policy and          agreed to timeline.                                                                       maximum efficiency.
ZEN goals.                                     Lighting Control 4 system purchased                                                     Further consideration for lighting
                                                 to improve lighting efficiency and                                                        upgrade to LED where possible.
                                                 reduce energy consumption.
Operate the facility in line with the          The J as at end March has                   Ongoing review re budget profiling,       Ongoing review and monitoring to
endorsed budget.                                 exceeded revenue budget by $$73k.             specifically event related revenue          meet full year budget.
                                               Expenditure was above budget by               and expenditure.
                                                 $24k, leading to a net YTD positive         Finalise 2018/19 budget.
                                                 performance against budget of $49k.
                                               BCC ahead of YTD budget by $13k
                                                 due      mainly     to   expenditure
                                                 underspends.
                                               Draft budget finalized for 18/19
                                                 financial year.

Finalise    the     development      and       New website up and running and              Ongoing review       of   marketing       Implement any additional marketing
implementation of the centre's strategic         has been well received by all parties.        strategies.                                 strategies   including     ongoing
marketing plan, including the launch of a                                                                                                  improvements to the website.
refreshed standalone website and social
media channels.




                                                                                                                                                              Page 66 of 107

Section 67

BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                          THE NEXT QUARTER
Business as Usual activities                   Commenced USC Performing Arts              Receive      report   to    consider      Ongoing review of ticketing options
                                                 Program for 2018 includes regular            operational improvements to theatre         for The J.
                                                 use as per USC lease agreement               lighting systems and test fixings         Implement recommendations to
                                                 and hire of The J Theatre and an             within the theatre, with the aim to         improve lighting systems and fixings
                                                 end of year performance by                   increase efficiency and reduce              within the theatre
                                                 students.                                    WH&S and public risk.                     Review The J’s core staff roles and
                                               BCC      –     Noosa      Gymnastics       BCC Main Hall – coordinate required         responsibilities to meet increasing
                                                 extensions to Main Hall near                 maintenance in conjunction with             demands          and     operational
                                                 completion.                                  completion of renovations.                  efficiencies.
                                               Negotiated permanent hire of BCC           BCC Annex - complete maintenance          Further consolidate regular bookings
                                                 Annex to Montessori Noosa until end          items for Montessori Noosa’s                through to 2020
                                                 of 2018 with aim to further negotiate        permanent hire.
                                                 a lease by 2020
                                               Noosa Alive tickets on sale.
                                               Preparation to commence TANDA
                                                 (electronic rostering and time and
                                                 attendance software) trial.

Noosa Leisure Centre
Investigate ways to enhance the centre’s       Contract awarded for rooftop PV            Confirm dates for solar power             Install rooftop solar.
sustainability practices to achieve              solar    installation and   initial          installation.
Council’s Emission Reduction Policy and          consultation and site inspections          Continue to replace any faulting
ZEN goals.                                       held with supplier.                          lights with energy efficient LED’s.

Operate the facility in line with the          The NLC exceeded the third quarter         Continue to closely monitor budget        Ongoing     review/monitoring       of
endorsed budget.                                 revenue budget by $30k.                      performance.                                budget, achieving further efficiencies
                                               Third quarter expenditure above            Finalise 18/19 financial year budget        where possible.
                                                 budget by $9k.
                                               Net position is $21k ahead of YTD
                                                 budget.
                                               Draft 20178/19 budget prepared
Finalise    the     development      and       Website and social media channels          Continued      development    and         Review and monitor performance,
implementation of the centre’s strategic         launched.                                    implementation     of    marketing          implement     any      proposed
marketing plan, including the launch of a                                                     strategies.                                 improvements.
standalone website and social media
channels.
Continue to implement service review         New junior program, Noosa Fit Kids,          Continue to liaise with NDBA and          Review performance and occupancy
recommendations, including:                    launched in January and is tracking            further develop details of usage            levels of Noosa Fit Kids program
 Formalising the usage agreement             well.                                          agreement.                                  and implement improvements where
    between NLC and the NDBA.                                                               Trial of Tanda rostering system.            necessary.

                                                                                                                                                               Page 67 of 107

Section 68

BRANCH ACTIVITIES                              RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                            THE NEXT QUARTER
   Introducing enhanced junior program        Initial works underway to trial new           Develop and forward Noosa Fit Kids          Monitor performance of Tanda.
     offerings.                                   electronic rostering system, Tanda.             survey to participants.                     Complete upgrade to flooring in the
                                                                                                                                                outside     compound      area   to
                                                                                                                                                accommodate group fitness training.
Business as Usual activities                       New stadium sport ‘Pickleball’             Continue negotiations with event            Upgrade of deteriorating skylight
                                                    introduced     in    January      with        organisers for Balloon Art Exhibition         roof sheeting in stadium.
                                                    encouraging attendance numbers to             to be held in August 2018.                  Preparation for upcoming Bookfest
                                                    date.                                       Investigate    options   to   repair          and Handmade Expo.
                                                  New Group Fitness timetable                   damaged shade cloth in outside              Annual servicing of basketball
                                                    commenced          in        January          crèche play area.                             structures and stadium fans.
                                                    incorporating Yoga classes back into
                                                    NLC program following the cessation
                                                    of the outsourced Noosa Yoga
                                                    School in December 2017.
                                                  Repairs to damaged stadium
                                                    floorboards completed.
                                                  Mini Library now set up and
                                                    operating within Noosa Leisure
                                                    Centre for the duration of the library
                                                    refurbishment works.

Noosa Community Support
Investigate ways to enhance the centre’s          During the centre refurbishment, all        Sourcing quotes to replace lighting         Continue to consider        emission
sustainability practices to achieve                 lighting was changed over to LED in           in the Canary Room with LED                   reduction initiatives.
Council's Emission Reduction Policy and             the Macaw Room.                               lighting.
ZEN goals.
Investigate systems and tools which               Conversations with current software         Identify an interim solution to assist        Continue to consider interim mobility
could aid mobility functionality for offsite        provider have revealed mobility               offsite staff. Initial conversations          solutions.
staff members.                                      solution won’t be available for               around this have occurred with IT
                                                    another 18 months.                            staff.
                                                                                                  Work being done to allow Traccs
                                                                                                  database to talk to T1 in some
                                                                                                  capacity.
Complete stage 2 of the centre refurb             Refurbishment completed                     Signage to be updated.                      Fence to be replaced and native
works                                                                                                                                           garden / fruit trees to be introduced.
Operate the facility in line with the             Team is performing with budgeted            Continue to track in line with budget.      Finish financial year within budget.
endorsed budget.                                    parameters.
Business as Usual activities                      Administration trainee appointed.           Investigate   opportunities       with      Finalise two year funding agreement
                                                  Arts and crafts moved to newly                package care.                                 (until 2020) with the Commonwealth
                                                    renovated area in McCaw room.

                                                                                                                                                                    Page 68 of 107

Section 69

BRANCH ACTIVITIES                  RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                          THE NEXT QUARTER
                                      New client easy access chairs               A Peregian Beach Care & Share             Commence                 implement
                                        purchased for McCaw room.                     program to be investigated in               recommendations of the future
                                      Review of future direction of Noosa           conjunction with Peregian Beach             directions review Ongoing database
                                        Community Support completed in                Community House                             improvements with associated staff
                                        preparation for changes to aged             Investigate electric chair to assist        training.
                                        care and disability funding models            client transfers in the podiatry and      Investigate sit-down dance classes
                                                                                      incontinence programs.                      in conjunction with NLC.
                                                                                    Internal painting of the Canary
                                                                                      rooms.
                                                                                    Finalise the 2018/19 operational
                                                                                      budget.

DIRECTOR’S OFFICE
Rufous St Precinct Development        March 9 Hutchinson Builders                 Ongoing    liaison  with Digital          Finalise report and grant acquittal to
                                        achieved practical completion of the          businesses                                  DLIGP
                                        Digital Hub building                        Finalise landscaping works for            Preparations and planning for the
                                      Employed      Chris     Bowden     as         Peregian Green                              Digital Hub opening in 4th quarter
                                        coordinator for the Digital Hub Hub                                                       2017/18
                                      Commenced work on developing a                                                          Construction of the Digital Hub now
                                        tender for Digital Hub tenants                                                            scheduled for completion by Easter
                                                                                                                                  2018
Cooroy Memorial Hall                  Renovation works at the Cooroy              Monitoring CMHA’s progress in             Cooroy Hall re- opening planned for
                                        Memorial Hall continue                        delivering the restoration works.           April 20
                                      Project on time and on budget                 Commence work on developing a
                                                                                      lease for the CMHA to manage the
                                                                                      building
Purchase of Johns Landing             Demolition of existing buildings            Nature Reserve application being          Finalise Nature Reserve status.
                                        completed                                     developed for the 70% of land
                                      Clean-up of the site finalised March          purchased with environmental levy
                                        29                                            funds.
                                      Management              responsibility
                                        transferred     from      Community
                                        Services to Natural areas.
LIBRARIES & GALLERIES
Cultural Plan                         Initial draft Cultural Plan complete        Preparing a report to Council             Public consultation on Draft Cultural
                                        Draft reviewed by key stakeholders            seeking Council endorsement of              Plan
Complete the draft Cultural Plan
                                        and Reference Group                           draft cultural plan for public
                                                                                      consultation



                                                                                                                                                      Page 69 of 107

Section 70

BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                             THE NEXT QUARTER
Libraries
Noosaville Library Refurbishment               Tender awarded to arete Australia, a          Hand over library building to                Finalise building design elements.
                                                 division of Kane Constructions at a             construction contractor                      Review and streamline service
                                                 cost of $1.63M ex GST                         On-going       implementation        of        operations and staffing levels at
                                               Off-site temporary library locations at         Noosaville Library Refurbishment               temporary library locations
                                                 Noosa Civic and the Noosa Leisure               Community Engagement Plan                    Continue to implement Community
                                                 Centre opened for business and                Finalise design elements for specific          Engagement Plan
                                                 operating successfully                          sections of the new refurbished              Provide      change      management
                                               All    Noosaville     Library     staff,        library – Heritage Room, Children's            support to library and leisure centre
                                                 programs, services, collections and             Area, Makerspace and Outdoor                   staff and library volunteers through
                                                 furniture relocated                             Courtyard                                      next phase of project
                                                 Noosaville Library building site ready        Engage local children's illustrator to       Finalise furniture and fit-out budget
                                                 for preparatory works                           finalise designs for young people's            and develop expenditure plan
                                                                                                 area                                           including supplier list
                                                                                               Construction phase to commence.
                                                                                                 Finalise    furniture   and     fit-out
                                                                                                 specifications
Implementation of RFID                         Bibliotheca appointed to supply               Staff training in RFID tagging               Appoint    contractor   for    RFID
                                                 RFID tags, first batch delivered late         Commence         retrospective  RFID           equipment and software
                                                 March                                           tagging mid-April and receive RFID           Continue retrospective RFID tagging
                                               Finalised retrospective RFID tagging            tagged shelf-ready stock from library
                                                 schedule and procedures                         suppliers
                                               Pilot tagging process complete                Invitation to quote process for RFID
                                                                                                 equipment and software
Liaise with Council departments, external      Re-located programs provided at               Continued liaison with the Cooroy            Deliver Cooroy Fusion Festival in
presenters,     authors,     partnership         Council and community locations                 Chamber of Commerce in order to                May in partnership with the Cooroy
organisations and suppliers to initiate          such as the Cooroy RSL, The                     transfer the coordination of the Pink          Fusion Festival Committee and
and plan programs and events                     Leisure Centre and The J have                   Precinct Fun Trail from Council to             Cooroy Future Group
                                                 transitioned smoothly with continued            the community                                Liaise with local digital industry
                                                 strong attendance                                                                              professionals and entrepreneurs for
                                                                                               Planning with the Noosa Gallery
                                               Completed the school holiday                                                                   delivery   of   the    grant-funded
                                                                                                 team to deliver Imaginate -a mid-
                                                 Summer Reading Club program - a                                                                advanced robotics and 3D programs
                                                                                                 year youth arts event
                                                 State Library of Queensland youth
                                                 reading initiative
                                               Finalised library program for Cooroy
                                                 Fusion Festival in May



                                                                                                                                                                   Page 70 of 107

Section 71

BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                            THE NEXT QUARTER
                                            Supported Council's Community
                                              Development        department     with
                                              assistance at the Queen's Baton
                                              Relay event
Seek external funding opportunities to      $10,000 grant awarded from the              Develop and implement recently              Complete Tech Savvy Seniors
provide   additional  resources    for        Engaging Science Week grant                   awarded science and technology                Acquittal Report
programs and projects                         program to contribute towards                 grant programs                              Complete     Cooroy Makerspace
                                              Makerspace programming                                                                      Acquittal Report
                                            $6,078 grant awarded from the
                                              National Science Week program to
                                              deliver a range of programs to
                                              showcase Science in Science Week
                                              (11-19 August)
                                            Submitted First Five Forever early
                                              literacy 2017 Progress Report and
                                              financial statement.
                                            Submitted        Queensland     Anzac
                                              Centenary         Grants      Program
                                              application for $30,711 to contribute
                                              towards commemorative event for
                                              100th anniversary of the signing of
                                              the Armistice, 11 November 2018
                                            Submitted application for a State
                                              Library of Queensland's Strategic
                                              Priorities grant program to develop a
                                              suite of robotics and 3D experience
                                              programs to be delivered in the up-
                                              coming         Noosaville      Library
                                              Makerspace
Plan      and implement     innovative      Inclusion     of   beginner    sewing       Open the Cooroy Makerspace on               Deliver new suite of digital-literacy
technology projects within Library            workshops in the new suite of                 Friday 6 April to the public, offering        programs in Makerspace
services to increase digital literacy,        Makerspace programs. Eg. How to               independent use of the resources            Continue to develop new workshop
expose the community to emerging              make a re-useable bag                         and a variety of programs to drive            ideas with the digital technology in
technologies and deliver productivity       Fit-out of Makerspace complete –              activation       and       encourage          the      makerspace          -       3D
efficiencies.                                 new benches built, additional power           exploration, sharing and learning             modelling/printing, virtual reality and
                                              points and security installed               Deliver staff inductions for Cooroy           sewing machines
                                            Makerspace Policy and User Guide              Maker Space including basic
                                              completed                                     introductory training on 3D printers
                                                                                            and the Virtual Reality Vive system



                                                                                                                                                              Page 71 of 107

Section 72

BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                            THE NEXT QUARTER
                                            First 'Tinker Tales' STEM-Storytime
                                              delivered with a very positive
                                              response       from    children     and
                                              parents/carers
Finalise Noosa Museum Future Plan and       Training session delivered to 9                 Organize additional training for            Deliver additional     training   to
commence       implementing   relevant        volunteers in use of Mosaic                     Museum volunteers on mutually                 Museum volunteers
initiatives                                   database                                        agreed topics
Plan and deliver a range of Heritage        Concept proposal for Noosaville               Finalise preparation of cemetery            Upload of digitized cemetery records
projects and activities                       Heritage Walk finalised and budget              records and dispatch to supplier for          into ECM
                                              initiative for Stage 2 implementation           digitizing                                  Delivery of Heritage Month events
                                              submitted                                     Prepare      “then     and      now”        Commence planning for 2018/19
                                            Supplier selected and Cemetery                  photographic installation for new             projects
                                              records in final stage of preparation           Noosaville Heritage Library room
                                              for dispatch to supplier for digitizing;
                                              budget initiative submitted for Stage
                                              2 of the project
                                            Project concept for Remembrance
                                              Day event developed and costed;
                                              grant application submitted to
                                              Queensland        Anzac      Centenary
                                              grants program and 2018/19 budget
                                              initiative for council co-contribution
                                              prepared
                                            Program of Heritage Month events
                                              planned
Plan and deliver a range of engaging        Confirmed high-profile event with             Deliver high-profile author event with      Prepare for Winter School Holiday
public library programs which support         Tex Perkins at The J in April, in               Tex Perkins in April                          Program.
reading, learning and literacy                partnership with Annie's Books on             Deliver local-author literary panel
                                              Peregian                                        event in April, based on war stories
                                            Well known author Helen Garner                  to tie in with Anzac Day
                                              secured for literary event in June            Complete 9 week Volunteer Tutor
                                            Delivered       successful     Summer           Training course to train up to 15 new
                                              School Holiday program. 16 events               tutors for our Adult Literacy program
                                              with over 320 attendees.                        Deliver Easter school holiday
                                            Successful 'Stories Under the Stars'            program
                                              event to celebrate World Storytelling
                                              Day
                                            75 attendees at the recent Dr Eileen
                                              Herbert-Goodall Writer's Workshops
                                              at the Leisure Centre and Cooroy
                                              RSL

                                                                                                                                                               Page 72 of 107

Section 73

BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           THE NEXT QUARTER
Business as Usual activities                  Total January – March 2018 Library         Continuous assessment and review           Commence planning for 2018/19
                                                visitors:     69,060       (excluding        of WHS practices and procedures              Branch and Risk Management Plan
                                                Noosaville Library in March due to           for library branches, including            Review condition and lifespan of
                                                closure)                                     temporary library locations to ensure        Mobile Library vehicle and develop
                                              Total January – March 2018 Library           safe work environments and best              forward plan for service and staffing
                                                items loaned: 118,736                        practice implemented.                      Continue to work with Civil Works on
                                              Social media: 3,159 followers on                                                          the Wallace Park Precinct pavement
                                                Instagram and 2,121 page likes on                                                         upgrade – scheduled for completion
                                                Facebook                                                                                  early 2018/19 financial year
                                              Completed     the    draft   2018/19
                                                operational budget
                                              Trainee successfully completed
                                                requirements of the Certificate II
                                                Information and Cultural Studies as
                                                part of her 12 month Library
                                                Traineeship.
Building Maintenance                                                                       Work with B&F to assess ongoing            Finalise and seek approval for
                                                                                             issues with Cooroy Library air               proposed rectification plan for
                                                                                             conditioning and BMS to identify             Cooroy Library Air Conditioning and
                                                                                             solutions and develop a proposed             BMS
                                                                                             rectification plan                         Resolve issue with roof over existing
                                                                                           Work with B&F and plumbing                   Cooroy Library air conditioning
                                                                                             contractors to rectify external              chiller plant equipment as part of the
                                                                                             drainage issues in sunken courtyard          rectification plan
                                                                                             and rooftop at Cooroy Library
Galleries
Plan and deliver a schedule of engaging    Delivered the following exhibitions in the      Preparation for solo exhibitions by 3      Implementation      of   programs
exhibitions and programs which diversify   past quarter                                      Sunshine Coast artists, Phil Rolton,         supporting Draw! (High school
and grow audiences                          Taste of Art, annual Friends of                Miles Allen and Glenis Clelland, in          student prize).
                                               Noosa Regional Gallery exhibition             next exhibition block.                     Planning for increased focus on
                                               and Aluna by emerging local artist          Preparation for Imaginate Children’s         McCrae Memorial Drawing Prize to
                                               Domi Cohen (6,884 visitors)                   Festival.                                    be held in October 2018.
                                            Prosthetic Realities, an augmented           Preparation for Deborah Kelly
                                               reality exhibition, Domestic Duties by        touring exhibition as part of Noosa
                                               local artist Kim Schoenberger and             Alive!
                                               Object Therapy which explores               Development of workshop programs.
                                               creative transformation and notions
                                               of value and repair (6,319 visitors);
                                            Stencil Art Prize travelling exhibition
                                               and Julian Thompson exhibition


                                                                                                                                                              Page 73 of 107

Section 74

BRANCH ACTIVITIES                             RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                           THE NEXT QUARTER
                                                   opened 24 March
Resolve the vacant positions within the          New Gallery Director commenced               Review vacant Gallery positions            Review gaps in current Gallery team
Gallery team                                       6th   February  and    completed             New casual staff recruited        for        structure and plan to recruit staff to
                                                   induction                                      exhibition installations                     address these against current
                                                                                                                                               unused EFT allocation
Liaise with Council departments, external        Program planned in partnership with          Assist Library with delivery       of      Finalise planning for the Imaginate
artists, partnership organisations and             Libraries team to deliver a series of          programs during refurbishment                Children's Festival
suppliers to initiate and plan programs            children’s public programs during the
and events                                         Imaginate Children’s Festival
Review Gallery shop product range to             Annual sales forecasts reached at            Monitor stock and focus on moving          Review 2017-18 sales trends and
improve sales and profitability and                end of 3rd Quarter                             current holdings                             plan for 2018-19 product range
Implement the new retail management
system for the Gallery shop
Ensure appropriate WH&S policies and             WH&S added as a permanent                    Reviewing Gallery WH&S policies            Continue to implement, monitor and
procedures      are     actively being             agenda item on Gallery team                    and procedures                               improve    WH&S     policies   and
implemented                                        meeting agendas                                                                             procedures
                                                 Gallery team up to date on Take 5
                                                   WH&S online modules
Actively seek opportunities to obtain            Submission of funding applications           Await outcome of grant applications        Gallery Director to identify potential
external funding to support Gallery                to Australia Council for the Arts and          submitted                                    external     funding    opportunities.
programs and activities                            Arts      Queensland     to    support                                                      Priority projects for support include
                                                   Imaginate Children’s Festival.                                                              Deborah Kelly’s No Human Being is
                                                 Secured $3,000 from Regional Arts                                                           Illegal,   Noosa     Drawing    Prize
                                                   Development Fund for Deborah                                                                (working title) and Biosphere during
                                                   Kelly’s artist fee for her 2-week                                                           ART+CLIMATE=CHANGE (tbc).
                                                   artist-in-residence     during      the
                                                   exhibition No Human Being is Illegal.
Plan and delivery of a range of initiatives      Friends of Noosa Regional Gallery’s          Planning for a series of professional      Finalise planning for No Human
which support local arts practices                 annual exhibition, Taste of Art,               development workshops for local              Being is Illegal and Noosa Alive! VIP
                                                   delivered featuring 121 works                  artists                                      event
                                                   predominantly by local artists.              Planning for Deborah Kelly’s artist-       Call for entries for Lynn McCrae
                                                 Program of 5 local artist talks and            in-residence project, working with           Memorial drawing Prize and Draw!
                                                   workshops delivered as part of Taste           local artists to develop a new               Student Drawing Award
                                                   of Art                                         collaborative art work as part of No
                                                 Free drawing workshops delivered               Human Being is Illegal
                                                   for local year 10, 11 and 12 students
                                                   in preparation for their entry into the
                                                   Draw! Art Prize



                                                                                                                                                                   Page 74 of 107

Section 75

BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                            THE NEXT QUARTER
                                              Ongoing program of fee-for-service
                                                workshops delivered with principal
                                                uptake by local artists
                                              Agreement reached with Noosa
                                                Alive! To feature Deborah Kelly’s No
                                                Human Being is Illegal as a key
                                                visual art event during the festival.
                                                Noosa Regional Gallery will also
                                                host a Noosa Alive! VIP preview
                                                event at the gallery
Review the purpose, roles and                 Met with President, Vice President          Liaising with the Friends of Noosa          Begin to draft a MoU as a result of
responsibilities of the Friends of Noosa        and Treasurer and agreed to regular           Regional Gallery to review annual             review of the Friends purpose, roles
Regional Gallery                                meetings between Gallery Director             Taste of Art exhibition and more              and responsibilities
                                                and Friends as well as need to                broadly, the relationship between
                                                review      purpose,     roles    and         Noosa Regional gallery and the
                                                responsibilities of the Friends of            Friends
                                                Noosa Regional Gallery
                                              Understanding reached that a MoU
                                                will be developed articulating the
                                                relationship      between      Noosa
                                                Regional Gallery and the Friends
Improve marketing of Gallery and its          Met with relevant Gallery staff and         Achieving a consistent style and            Commence planning for a review of
exhibitions and programs                        external graphic designer to discuss          identity across current marketing             Gallery marketing and branding
                                                current marketing and design                  collateral
                                                practices and develop a more                Review range of local and national
                                                consistent approach.                          marketing opportunities and align
                                              Increased prominence of display               with upcoming exhibitions and
                                                advertising in Tourism Noosa annual           activities as appropriate
                                                publication                                 Investigating public art opportunities
                                              Negotiated      full   page    display        as an avenue for improving visibility
                                                advertising in Noosa Alive! Festival          of the Gallery
                                                program
Business as Usual activities                  Total January – March 2018 Gallery          Strengthen and re-focus Noosa               2019 exhibition program planning
                                                visitors: 12,115                              Regional Gallery’s relationship with          and development
                                              Total January – March 2018 Gallery            the Friends                                 Floating Land festival planning and
                                                Program attendance: 759                     Continue volunteer recruitment to fill        development
                                              Social media: 1232 followers on               small gaps on roster and succession         Management plan for Friends Noosa
                                                Instagram and 1338 page likes on              planning                                      Gallery
                                                Facebook



                                                                                                                                                               Page 75 of 107

Section 76

BRANCH ACTIVITIES   RECENT ACHIEVEMENTS                              CURRENT PRIORITIES                         THE NEXT QUARTER
                       Council staff engagement with
                         gallery continues to improve through
                         council morning teas
                       Event held for local stakeholders to
                         meet with new Gallery Director
LOCAL LAWS
Illegal Camping        In the past quarter the nature of              Continue to patrol and monitor this      Monitor & review
                         illegal camping has changed with                 behavior taking action where
                         Officers having to deal with an                  appropriate.
                         increasing number of homeless
                         people setting up camp in high
                         profile areas along the foreshores of
                         the river (Noosa Heads Lions Park
                         and Gympie Terrace).
                       Officers have engaged Community
                         Development Staff and external
                         agencies including QPS to assist in
                         dealing with the issue.
Beach Patrols          Random patrol times have increased             Maintain focus and patrols               Monitor
                         this quarter with Officers report
                         many       compliments      from      the
                         community on the increased Council
                         presence.
Unregistered Dogs      Action taken against unregistered              Maintain focus                             Monitor
                         dog owners has been a hot topic.
                         After initial information from external
                         providers that emailed renewals had
                         been sent without problem, upon
                         complaint,         further       internal
                         investigation identified a problem in
                         the email delivery and as such a
                         small number of individuals have
                         had their infringements cancelled.
                         Other issues requiring cancellation
                         were deceased dogs and residents
                         moving.         Generally      speaking
                         approximately        65%      of      the
                         infringements were unaffected.




                                                                                                                                        Page 76 of 107

Section 77

BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                            CURRENT PRIORITIES                           THE NEXT QUARTER
Compostable Doggie bags                     The New Doggie bags were                     Monitor and action as necessary          Monitor
                                              introduced and have become an
                                              instant success with residents. So
                                              much so that many are being
                                              removed in bulk for what is believed
                                              to be “Other Uses”. Residents are
                                              assisting with addressing this
                                              situation.
Business as Usual activities
Dog Registrations                           Infringement notices were issued to          Review     process     for   issuing     Monitor
                                              unregistered dog owners this                   infringement notices to make it more
                                              quarter.                                       customer friendly
                                            Issuing of these notices highlighted
                                              problems with Council emails ending
                                              up in junk mail and owners of pets
                                              not     being     aware    of     their
                                              responsibility to inform Council when
                                              their pet has died.
                                              As a result of these problems
                                              Over one third of these infringement
                                              notices have now been waived.
Parking                                     After a busy holiday period parking
                                              revenues are in line with budget
                                              forecast

WASTE        &     ENVIRONMENTAL
HEALTH
Waste
Mobilise new waste management               Contract successfully commenced 1            Resolve issues around accounts to        Contract mobilisation completed.
contract 1516T043 by 1 September 2017         September 2017                                 be submitted by Cleanaway
                                            1100     litre  cardboard  service
                                              implemented
Implement Mandatory Garden Waste            Bins delivered in August 2017 and            Review the contamination levels and
Collection Service by 1 September 2017        first week of September                        consider inclusion in an audit of the
                                              Collection service commenced 1                 waste stream in 2018/19.
                                              September 2017
Prepare     for   Container    Deposit      Attended public meeting with Glenn           Report to Council on our proposed          Await development     Government
Legislation                                   Elmes, Member for Noosa                        level of involvement when details            Legislation
                                                                                             are known

                                                                                                                                                            Page 77 of 107

Section 78

BRANCH ACTIVITIES                             RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                           THE NEXT QUARTER
                                                  State     Government       advised
                                                   commencement of container deposit
                                                   scheme deferred until 1 November
                                                   2018.
Draft Local       Law      No.7     Waste        Report presented to Council and             Gazettal of Local Law                      Report to council in April adopting
Management                                         Local Law adopted 15th March 2017           Adopt resolutions relating to service        service    areas   and    approved
                                                                                                 areas and approved containers.               containers.
Develop Litter Management Plan                   Ongoing      success    with  using         Gather information on hot spots and        Commence preparation of data for
                                                   cameras to identify illegal dumping           costs to Council managing litter             the Plan
                                                   and issue fines
Call tenders for a licence for operation of      License to Occupy issued to                 Transfer of License from Briteside         Negotiate with RRA on the level of
the current Briteside Tip Shop and select          Resource Recovery Australia for Tip           (Noosa Community Training) to                involvement in the 2018/19 kerbside
preferred supplier                                 shop operation from 1 June 2017.              RRA.                                         service commencing in July.
                                                                                               Negotiate with Noosa Community
                                                                                                 Training to ensure the organisations
                                                                                                 sustainability
Manage minor Waste contracts                     Extended Contract for Recovery of           Finalise Concrete Crushing Contract        Monitor contract register and ensure
                                                   Metals and Lead Acid Batteries to 30          for Council approval.                        contracts that are expiring are
                                                   June 2019.                                  Mulching of Green Waste Contact              renewed
                                                 Extended Contract for Domestic                has been terminated to prevent             Report to council for approval of
                                                   Hazardous Waste Removal to 31st               procurement value being exceeded             concrete crushing contract use to
                                                   July 2019.                                    (due to huge volume processed).              value.
                                                                                               Interim quotation process being            Call tenders for Mulching Contract at
                                                                                                 used until a new contract in place.          Landfill and Transfer Stations
Investigate   costs     for long    term         Obtained     estimated     costs    of      Included in Capex program for              Portion of Project for 2017/18
stormwater control at landfill                     investigation for stormwater control.         2018/19                                      completed.
Investigate costs for second weighbridge         Decision not to proceed with new            NFA                                        NFA
for landfill                                       weighbridge at present time
Implement action plan in the Waste               Delivery of education program and           Audit of waste streams to determine        Obtain quotes for audit and
Reduction and Recycling Plan 2016-                 participation in national recycling           contamination and volumes                    implement audit by successful
2024                                               week                                                                                       tenderer
Promote e-waste disposal service                 Service implemented in accordance           Promote e-waste disposal through            Completed. (Provision of Service is
dependant on Government Policy                     with revised policy                           media outlets and web                        ongoing)
                                                 Paint back contract for free paint
                                                   collection implemented
Develop web portal with T1 and                   Web portal established 1 September          Await T1 upgrade to allow full             Expand staff training and use of the
Cleanaway as detailed in new Waste                 2017                                          integration of web portal – may take         system and explore benefits
Management Contract                              Deficiencies in T1 have not allowed           more than 1 year
                                                   for full integration of the portal          Customer service and waste staff
                                                   system but it is operational                  using the system

                                                                                                                                                                 Page 78 of 107

Section 79

BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                             CURRENT PRIORITIES                            THE NEXT QUARTER
Submit an ERA53 for composting at             Negotiations with EHP about the               Waste audit to determine volumes of         Audit of waste streams to determine
Eumundi Rd Landfill if costs analysis is        proposal indicate business as usual             organics                                      if composting is economically viable
positive                                        does not require ERA 53 approval.             Cost benefit analysis consultancy for         for waste stream.
                                              Quotations for waste audit received             composting included in the 2018/19
                                                and contract approved for provision             draft budget estimates.
                                                of waste audit.
Fully revise fees and charges for Waste       AEC have developed draft fees and             Adopting of fees and charges.               Refer new fees and charges to
in the context of the new contract              charges to remove some of the                                                                 Council for approval in 2018/19 draft
                                                operational concerns from the                                                                 budget.
                                                2017/18 charges.
Update the provisions budget timelines        Contact      with     ATC     Williams        AEC to determine the increases              Work     with    AEC       regarding
and costs with AEC                              Consultancy       indicates   a     full        needed in the 2018/19 draft budget.           requirements for provisions fund
                                                investigation     for   2018/19     not                                                       update for 2018/19 budget.
                                                warranted.      Increase    provisions
                                                funding by CPI.
Monitor impacts of China Recycling Ban        Liaise with Visy re their continuing          Inform community that Visy is               Advocate to State and Federal
                                                ability to accept Noosa’s co-mingled            continuing to accept Noosa’s                  Governments to take action to
                                                kerbside recycling                              recycled materials however they               encourage the growth of a local
                                                                                                may be some future increase in                recycling industry
                                                                                                costs to provide this service
                                                                                              Continue      community      education
                                                                                                campaign to reduce contamination
                                                                                                levels in the recycling stream
Business as Usual activities                                                                                                                Develop 18/19 budget
                                                                                                                                            Develop Capital Works Program
                                                                                                                                              18/19
                                                                                                                                            Review Waste Service charges for
                                                                                                                                              18/19
                                                                                                                                            Develop New Initiatives for 18/19
                                                                                                                                              budget
Environmental Health
Develop Inspection program and fees for       Legal advice obtained on local law            Develop an inspection program               Develop and report to Council on
deemed approvals and deleted ERA’s for          and options for enforcement                     working in consultation with industry         proposed inspection program
further action required by Environmental      Proposed local law found to be                Develop an industry communication           Provide industry communication
Health in accordance with Local Law 1           unlawful                                        following councillor decision on fee          once cost recovery fee options have
proposed amendments                           Alternative cost recovery option                recovery proposal                             been decided
                                                using a Special Charge through the
                                                rates confirmed by AEC group that
                                                this option can be used


                                                                                                                                                                 Page 79 of 107

Section 80

BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                           THE NEXT QUARTER
                                               Workshop with councillors on the
                                                 Special        Charge        proposal.
                                                 Councillors agreed to discuss as
                                                 part of the budget discussions
Develop and commence implementation            Fees are available for charging for         Develop proposal of which pools will       Awaiting finalised pool monitoring
of Inspection program with fees for              the inspection of pools in the 17/18          be inspected                                 program guidelines from QHealth
Licensing of commercial swimming pools           budget                                        New swimming pool operational                before commencing program most
(under Local Law 1 which is to be              Swimming pool operational training            guidelines are being updated by              likely now in next financial year.
amended for this undertaking)                    undertaken with 2 x staff with further        Qhealth. The development of this
                                                 training to be undertaken                     guideline will allow establishment on
                                                 Inspection fee included in the fees &         a suitable public pool monitoring
                                                 charges                                       program
Develop and implement a risk based             Staff attended a Qld Health training        Develop a risk rating system for food      Finalise investigations into the
food business licensing and inspection           course on risk rating premises.               premises                                     development of a risk based
system                                           Food premises register has been               Program will commence beginning              inspection program
                                                 risk rated and inspection frequencies         of new financial year
                                                 have been developed
Commence development of the draft              Draft project plan has been prepared        Refine the project plan                    Arrange steering group meetings to
Community Health Plan in consultation            for the development of the                  Develop and obtain approval from             work on development of the plan
with relevant stakeholders for completion        Community Health Plan                         Council for the steering group             Undertake initial reference group
in 18/19                                       Proposed scoping for the Plan has             representatives                              meeting and commence plan
                                                 been workshopped with Councillors           Confirm        reference      group          development
                                                 and councillor representation on the          membership and organise initial
                                                 reference group ratified by council           reference group meeting for April
Business as Usual activities                   295 annual food licence inspections         Continue annual food licence               Develop draft 18/19 budget
                                                 completed following 565 inspections.          inspection program                         Propose draft fees and charges for
                                               845 complaints investigated (900            Continuing focus on food premises            18/19
                                                 complaints investigated in 2016/17)           inspection program and timely              Undertake routine inspections of
                                               Above average numbers of new food             management of customer requests              premises and attend to complaints
                                                 business applications received to                                                        Implement activities around the
                                                 date.                                                                                      amendments to Local Laws relating
                                               Market inspections after hours have                                                        to Environmental Health
                                                 been     completed     with    further                                                   Continuing inspection program
                                                 inspections scheduled before 30                                                          Further    after     hours   market
                                                 June 2018                                                                                  inspections of food outlets




                                                                                                                                                              Page 80 of 107

Section 81

BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                               CURRENT PRIORITIES                             THE NEXT QUARTER
Pest Management
Pest Management                            Responsibility for Pest Management
                                             activity successfully transferred from
                                             Waste and Environmental Health to
                                             Environmental Services Branch from
                                             January 1 2018
Business as Usual activities               Mosquitos were very active in
Vector Control                               February / March as a result of wet
                                             weather. This resulted in 7 aerial
                                             treatments in the quarter with the
                                             treatment area expanded over
                                             Noosa Banks due to high number of
                                             Ross River         notifications from
                                             Queensland Health

Cemeteries
Transfer paper cemetery records to T1      Finalise             quotes            for      Arrange        commencement         of       Finalise this stage of the project
                                             scanning/digitalisation of records.               digitalising   paper records      with
                                           Prepared the records to be                        Library
                                             digitalised
Business as Usual activities               12 burials since Christmas                      Investigating improved safety barrier        Finalise first stage of monument
                                           The recent wet weather has caused                 mechanisms        for   open     trench        safety securing program
Conduct burials at 3 cemeteries and          difficulties with trench stability at the         management                                   Procurement of improved open
maintain cemeteries in good condition        Tewantin cemetery, so safety                    Secure cemetery monuments that                 trench barrier management
and implement Cemeteries Business            measures are in place for both staff              have become loose over the years.
Continuity Plan                              and the public to prevent accidents               These tend to be very old
                                             from trench wall collapses                        monuments that require additional
                                           Fee amendments for 18/19 financial                securing to prevent monuments
                                             year completed                                    falling onto to the public and staff
                                           Temporary repairs completed to the              Maintain 3 Cemeteries
                                             Pomona fence




                                                                                                                                                                   Page 81 of 107

Section 82

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                8 MAY 2018


Previous Council Consideration

Nil.

Finance & Risk

The Department finished the third quarter of 2017/18 in a strong financial position, with revenue
at 95% of budget and expenditure at 72.5%. Net financial performance was favourable against
year to date budget by $1,552,212.

Revenue performed strongly particularly in Waste and Community Facilities and specifically at
the NAC. Libraries branch have also secured a number of grants in this quarter.

Expenditure items that were below budget related to employee costs in Local Laws, Community
Support and Environmental Health. Materials and services were underspent in Waste, Libraries
and Community Development.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Nil.


Departments/Sections Consulted:

       Chief Executive Officer   X   Community Services                      X   Corporate Services
       Executive Officer         X   Community Development                   X   Financial Services
       Executive Support         X   Community Facilities                        ICT
                                 X   Libraries & Galleries                       Procurement & Fleet
                                 X   Local Laws                                  Property
                                 X   Waste & Environmental Health                Revenue Services

       Executive Services            Environment & Sustainable Development       Infrastructure Services
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                            Page 82 of 107

Section 83

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                         8 MAY 2018


12                       CORPORATE SERVICES DEPARTMENT UPDATE - 3RD QUARTER 2017-18
DOCUMENT INFORM AT ION




Author                           Director Corporate Services, Michael Shave
                                 Corporate Services Department

Index                            ECM/ Subject/ Branch Management/ Corporate Services

Attachments                      Nil



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Corporate Services to the Services & Organisation
Committee Meeting dated 8 May 2018 providing an update on operations of the Corporate
Services Department for the period 1 January to 31 March 2018.


REPORT
The adopted organisation structure includes the following branches under the Corporate Services
Department:
   Financial Services;
   ICT (including Records);
   Procurement & Fleet;
   Property; and
   Revenue Services.

Corporate Services primarily provides internal support to the other Council Departments, with the
exception of the Property branch that deals primarily with land and property management issues.

This report provides a brief summary regarding recent performance, current priorities and future
initiatives for the department.




                                                                                       Page 83 of 107

Section 84

CORPORATE SERVICES DEPARTMENT

BRANCH ACTIVITIES                      RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                             THE NEXT QUARTER
Financial Services

Budget                                    April budget review (BR3) finalised        Finalisation of draft 2018/19 budget         Adoption of 2018/19 budget.
                                            and adopted by Council.                      and supporting financial policies.           Further      refinement     to the
                                          2018/19 budget development in              Ongoing monthly budget reporting               functionality of the T1 enterprise
                                            progress. Managers and directors             and support.                                   budget system (EBS) to enable its
                                            have completed submissions and                                                              use for future budget reviews.
                                            Councillor workshops underway.
Assets                                    Reconciliation    of   road   assets       Finalise the financial revaluation.          Revise road assets in the T1 system
                                            between pavement management                Assess the impact to Council’s                 as a result of revaluation and
                                            system, GIS and T1 system                    financial sustainability from the roads        reconciliation.
                                            completed.                                   revaluation and reconciliation.              Asset procedures to be reviewed to
                                          Draft financial revaluation of roads       Continue         capitalisation      of        streamline processes and improve
                                            and land asset classes complete.             constructed        and        developer        efficiency and transparency.
                                          Recruitment of new staff member to           contributed assets in the financial
                                            fill the vacant Asset Accountant             asset register to eliminate backlog.
                                            position.
Statutory Reporting, Risk Management      Bank       reconciliation processes        Preparation for interim external             Preparation for 2017/18 year end
and Audit Compliance                        improved per recommendations from            financial audit by QAO in May.                 financial statements.
                                            internal audit outcomes.                   Finalisation of review of financial
                                          A review of controls over access to          system access by users.
                                            financial system access underway.
Treasury, Investments and Banking         Investment portfolio managed to            Review location, service cost and            Roll out of new EFT devices.
                                            ensure optimal return for Council in         usage of current EFT devices.                Drawdown of QTC loans per
                                            alignment with Investment Policy                                                            Council’s adopted capital works
                                            requirements.                                                                               program.
                                          Reinvestment of short-term surplus
                                            cash following January rates run.
Business As Usual Activities              Monthly        financial performance       Completion     of    annual     Fringe       Refine the grant reporting process to
                                            reporting.                                   Benefits Tax return.                           ensure transparency of timing and
                                          Development of a summary capital                                                            availability of grant funds.
                                            financial report to support Council’s
                                            project control groups.
                                          Quarterly performance plan reviews
                                            for all staff.




                                                                                                                                                           Page 84 of 107

Section 85

BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           THE NEXT QUARTER
ICT

Technology One                                New enterprise systems contract            Go-live of 2018A software update           Improving how we create and
                                                finalised with Technology One.             Enterprise      Cash       Receipting        maintain customer data to avoid
                                                                                             implementation to improve receipting         duplications.
                                                                                             including reducing fraud risk.             Planning for implementation of
                                                                                                                                          2018B version.
Technology One CI Anywhere (web               Planning workshops held with               Procure to Pay CIA upgrade.                Commencement of Property and
browser based) functionality to simplify        Technology One on property and             Planning     for     Eplan  CIA              Rating project implementation.
systems and make them accessible on             rating system upgrade.                       implementation for new planning
mobile devices                                                                               scheme.
GIS Mapping                                   Provided     the     latest   aerial       Go-live of new 9.0 version of GIS          Ongoing updating of datasets.
                                                photography imagery to staff.                mapping with new capabilities              Planning for implementation of
                                              Held a mapping training session with         including graphs.                            version 9.5 of TechnologyOne GIS.
                                                Tourism Noosa.                             Adding the Unitywater DMATT
                                                                                             population model to the GIS.
ICT Security                                  Ongoing security training including        Implementation of improvements to          Continuous improvement of ICT
                                                phishing testing.                            a planned security framework.                security to meet emerging threats.
                                              New cyber-security induction.
                                              ICT security gap analysis completed.
ICT Strategy and roadmap                      Updated ICT Strategy.                      Continuing positive partnership with       Progressing implementation.
                                              Monthly steering group meetings              Technology    One     to   progress
                                                held with Technology One.                    projects.
                                              Bi-monthly Council ICT Steering
                                                Group meetings.
Business as Usual activities                  Draft 2018/19 operating budget             Rollout of PC replacements across          New PC EFTPOST terminals for at
                                                submission completed.                        the organisation.                            all leisure facilities.
                                              Upgraded SES offices to the NBN            New PC EFTPOST terminals for trial         Access       to      Community Care
                                                with 4G backup                               at leisure facility.                         management system to staff in the
                                              Redesigned Holiday Parks website.          Transferring 90 mobile services to           field via mobile devices.
                                              New guest Wi-Fi at the Aquatic               Optus including replacing some very
                                                Centre using NBN Internet.                   old handsets.
                                              Leisure Facilities software upgraded.
                                              Optus mobiles contract signed.




                                                                                                                                                            Page 85 of 107

The text continues on section 86.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.