2018-05-08 Services & Organisation Committee Agenda

of 107

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

BRANCH ACTIVITIES                              RECENT ACHIEVEMENTS                               CURRENT PRIORITIES                         THE NEXT QUARTER
Capital         Works           Program           A draft 5 year program is being                 Initial workshops have commenced         Have a draft 5 year capital program
- The development from a 5yr capital                prepared   for   future  budget                   in establishing a capital works            prepared for the April 2017 budget
works program to a 10 year capital                  workshops.                                        program for 2018/2019.                     workshop.
works program that is aligned to
Councils long term financial planning.
Business as Usual activities                      Completion of customer requests                  Ensure customer enquiries are           Further develop systems and
                                                    continue to be undertaken by staff.               being addressed in a timely manner.        processes to better respond to
                                                                                                                                                 technical enquiries relating to
                                                                                                                                                 technical issues.


Buildings & Facilities
Align to Council’s mobility system and            Ongoing utilisation of the system               Manage Work Order completion and         Ongoing development and use of
roll out                                            and devices provided.                             closure.                                   mobility system that are aligned to
                                                  Additional training being undertaken            Manage     reporting    on    works        Council’s     asset   management
                                                    when needed.                                      completed and insert into T1.              systems.
                                                  New Electrician trained and device
                                                    provided.
Compliance auditing of shire wide                 70% of the Council owned buildings              Documentation loaded to ECM              Continue priority inspections.
assets     to     ensure   legislative              have been audited.                              Continued compliance checks.             Electrical inspections of distribution
requirements are being met                                                                                                                       and power circuits in remote
                                                                                                                                                 locations.
Create a critical asset register to align to      Register populated for high level               Continued asset capture and              Ongoing asset accuracy reporting.
asset management objectives                         assets.                                           populate register for renewed
                                                                                                      assets.
Undertake condition assessments of                Scheduled   amenities     condition             Complete condition assessments           Finalise condition assessments.
public amenities                                    assessment with external support.               Collating data.                          Finalise collected data into asset
                                                                                                                                                 management system.
Delivery of 90% of Capital Works                  Reviewed capital works program                  Continued monitoring of project          Ensure projects meeting milestones.
Program as approved by CWE                        Continue to track and ensure capital              milestones and financial tracking.       Financial projections are on target.
                                                    works completion.                                                                          Close out completed projects.
                                                  New capital works projects identified
                                                    and tracking.
Business as Usual activities                                                                        Continue to monitoring the council       Implement identified preventative
                                                  Draft      Unitywater     MOU          for        portfolio.                                 maintenance changes.
                                                    installation of additional bottle filling       Continued review of services.            Review of electrical services across
                                                    stations     at multiple     locations          Working through Council owned              the    shire      for      continued
                                                    prepared.                                         facilities asset capture.                  improvement.


                                                                                                                                                                     Page 101 of 107
Log in to download the original file

2018-05-08 Services & Organisation Committee Agenda(PDF, 7MB).pdf · 7.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.