NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 11
55. Submission of written certification from a suitably qualified person confirming that the noise levels from all
mechanical equipment comply with the cause above when measured at either the residential boundary or
outside the most exposed part of an affected building, whichever is the closest to the equipment.
The assessment and certification is required immediately after installation of the equipment and prior to
any occupation of the building, and in a format approved by Council. This assessment must take into
account noise from any other fixed equipment on the property e.g. swimming pool pump, heating/cooling
equipment, etc that may increase the overall noise level emitted.
Advice: It is highly recommended that the person you engage to certify the installation is involved at the
plan development stage so they can recommend where this equipment is best located. They can also
advise about noise enclosures and can make other suggestions to avoid noise problems. It is a lot more
costly to try and deal with noise problems after everything is built.
56. Noise from building works associated with residential development shall comply with the following –
56.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
56.2. All reasonable measures are taken to minimise noise emissions.
56.3. Not permitted on Sunday or public holidays.
A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@a4077865\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2361 - SUPERSEDED Negotiated Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 60 KB (small file)
- File type
No other editions are linked here.