NOOSA COUNCIL IDAS Development Application Decision Notice                                                   9 of 11



                                      Local Laws, Policies & State
                                      Regulation Requirements
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.      The applicant is advised that development contributions and infrastructure charges applicable to this
        development approval have been based on the following Uses Class/ Uses and applicable quantities:-

                       Existing Development                                  Approved Development
          Existing Use Class /                                   Approved Use Class /
                                       Existing Quantity                                      Approved Quantity
                  Use                                                   Use
                                                                Multiple Housing - Type
         Detached House             Vacant Land                                             2 x 2 Bedroom Units
                                                                2 – Duplex

2.      The applicant is informed that approval of this development application will trigger an Infrastructure
        Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated
        amount of $2,717 and is subject to variations in the Consumer Price Index, All Groups Brisbane from
        September 2006 until the date of payment. An Infrastructure Charge Notice will be issued in accordance
        with Chapter 5 of the Integrated Planning Act 1997.

3.      The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law
        No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that
        makes or causes audible noise to be made from the building work:
        3.1.   On a Sunday or public holiday, at any time; or
        3.2.   On a Saturday or a business day, before 7.00am or after 6.30pm.
        3.3.   A maximum penalty of $1,500 applies to an offence under this legislation.
4.      The applicant is informed that payment via credit card transaction will not be an acceptable method of
        payment for development contributions conditioned in this permit or for infrastructure charge notices
        issued separately.

5.      Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as amended)
        and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from the dwelling to the
        pool enclosure is not permitted.

6.      The development should be undertaken and operated in a manner that causes no detrimental effect upon
        the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
        hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance
        with the nuisance provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No.
        12 – Control of Nuisances.

7.      In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
        concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
        reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
        fines apply for such offences.

8.      The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
        boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to
        obtaining a Development Permit for Building Works.

9.      Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
        operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
        accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
        Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
        requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
        works must be submitted to Council with the lodgement of any application for operational works over the
        site.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@a4077865\@[email protected]

Used in these records

About this file

File size
60 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_2361 - SUPERSEDED Negotiated Decision Notice [As Published].pdf · 60 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.